Nissan Qashqai (2007-2010). Manual — part 855
HIGH-LEVEL VENTILATOR DOOR MOTOR
VTL-85
< ON-VEHICLE REPAIR >
[MANUAL AIR CONDITIONER]
C
D
E
F
G
H
J
K
L
M
A
B
VTL
N
O
P
HIGH-LEVEL VENTILATOR DOOR MOTOR
Exploded View
INFOID:0000000001097998
Removal and Installation
INFOID:0000000001097999
REMOVAL
LHD Model
1.
Unclip lower instrument panel - passenger side.
1.
Intake connector seal
2.
Blower motor assembly
3.
Heater pipe seal
4.
Air conditioner filter
5.
Air conditioner filter cover
6.
Air mix door motor (left)
7.
Air mix door lever
8.
Electrical heater
9.
Air mix door (slide door)
10.
Intake sensor
11.
Evaporator and expansion valve unit
12. Center case (lower)
13.
Center case (upper)
14.
Defroster door
15. Intake door motor
16.
Intake motor bracket
17.
Intake connector
18. Heater core
19.
Air mix door link bracket
20.
Front ventilator door
21. Side ventilator door
22.
Intake door lever
23.
Intake door box
24. Intake door
25.
Mode door motor
26.
Air mix door link (left)
27. Heater and cooling unit case
28.
Air mix door motor (right)
29.
Aspirator
30. Air mix door link (right)
E1IIA0008GB
VTL-86
< ON-VEHICLE REPAIR >
[MANUAL AIR CONDITIONER]
HIGH-LEVEL VENTILATOR DOOR MOTOR
2.
Remove lower instrument cover.
3.
Remove Glove Box Assembly. Refer to
IP-12, "Removal and Installation"
4.
Remove RH foot Duct. Refer to
VTL-94, "FOOT DUCTS : Removal and Installation"
5.
Remove high level door motor fixing screws.
6.
Remove high level door motor harness connector.
7.
Remove high level door motor (1) from link.
RHD Model
1.
Unclip instrument lower panel - passenger side.
2.
Remove lower instrument cover.
3.
Remove Glove Box Assembly. Refer to
IP-12, "Removal and Installation"
4.
Remove LH foot Duct. Refer to
VTL-94, "FOOT DUCTS : Removal and Installation"
.
5.
Remove high level door motor fixing screws.
6.
Remove high level door motor harness connector.
7.
Remove high level door motor (1) from link.
INSTALLATION
installation is basically the reverse order of removal.
: Front
JPIIA0024ZZ
: Front
JPIIA0025ZZ
HEATER CORE
VTL-87
< ON-VEHICLE REPAIR >
[MANUAL AIR CONDITIONER]
C
D
E
F
G
H
J
K
L
M
A
B
VTL
N
O
P
HEATER CORE
Exploded View
INFOID:0000000001093854
Removal and Installation
INFOID:0000000001093855
REMOVAL
1.
Intake connector seal
2.
Blower motor assembly
3.
Heater pipe seal
4.
Air conditioner filter
5.
Air conditioner filter cover
6.
Air mix door motor (left)
7.
Air mix door lever
8.
Electrical heater
9.
Air mix door (slide door)
10.
Intake sensor
11.
Evaporator and expantion valve unit
12. Center case (lower)
13.
Center case (upper)
14.
Defroster door
15. Intake door motor
16.
Intake motor bracket
17.
Intake connector
18. Heater core
19.
Air mix door link bracket
20.
Front ventilator door
21. Side ventilator door
22.
Intake door lever
23.
Intake door box
24. Intake door
25.
Mode door motor
26.
Air mix door link (left)
27. Heater and cooling unit case
28.
Air mix door motor (right)
29.
Aspirator
30. Air mix door link (right)
*
With left and right ventilation temperature separately system.
Refer to
for symbols in the figure.
E1IIA0008GB
VTL-88
< ON-VEHICLE REPAIR >
[MANUAL AIR CONDITIONER]
HEATER CORE
1.
Remove LH lower instrument panel (RHD).
2.
Remove LH foot duct.
3.
Disconnect harness connectors, remove harness bracket (1).
4.
Remove heater cable fixing metal clips (3).
5.
Remove air mix cable (4), from heater.
6.
Remove heater core pipes metal clip retainers (2).
CAUTION:
Use shop cloth and all other protection necessaries to
avoid damaging floor carpet.
7.
Remove heater pipes as shown.
8.
Pull to remove heater core.
INSTALLATION
Installation is basically the reverse order of removal.
E1IIA0022ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст