Nissan Altima L32. Instruction — part 626
EM-40
< ON-VEHICLE REPAIR >
[QR25DE]
ROCKER COVER
1. Apply RTV Silicone Sealant to the joint part of the cylinder head
and camshaft bracket using the following steps:
• Use Genuine Silicone RTV Sealant, or equivalent. Refer to
.
a. Follow illustration (a) to apply sealant to joint part of No.1 cam-
shaft bracket and cylinder head.
b. Follow illustration (b) to apply sealant in a 90
° degree angle to
the illustration (a).
2. Install the rocker cover and the new rocker cover gasket.
• The rocker cover gasket must be securely installed in the groove in the rocker cover.
3. Tighten the rocker cover bolts in two steps, in the numerical
order as shown.
4. Installation of the remaining components is in the reverse order of removal.
WBIA0164E
Step 1
: 1.96 N·m (0.20 kg-m, 17 in-lb)
Step 2
: 8.33 N·m (0.85 kg-m, 74 in-lb)
ALBIA0191ZZ
CAMSHAFT
EM-41
< ON-VEHICLE REPAIR >
[QR25DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
CAMSHAFT
Removal and Installation
INFOID:0000000004202122
REMOVAL
1. Remove the rocker cover. Refer to
EM-39, "Removal and Installation"
.
2. Remove the front right side tire and wheel. Refer to
.
3. Remove the RH splash shield using power tool.
4. Remove the drive belt. Refer to
EM-16, "Removal and Installation"
.
5. Remove the power steering reservoir. Refer to
ST-19, "QR25DE : Exploded View"
6. Remove the coolant overflow reservoir tank.
7. Disconnect variable timing control solenoid and camshaft sensor harness connectors.
8. Remove camshaft sensor.
9. Remove camshaft sensor bracket.
AWBIA0591GB
1.
Camshaft bracket (No.1)
2.
Washer
3.
Front cover (partial view)
4.
Chain guide
5.
Chain tensioner
6.
O-ring(s)
7.
Chain tensioner spring
8.
Chain tensioner plunger
9.
IVT control solenoid valve
10. IVT control cover
11. Camshaft sprocket (EXH)
12. Camshaft sprocket (INT)
13. Valve lifter
14. Camshaft (EXH)
15. Camshaft (INT)
16. Camshaft brackets (EXH)
17. Camshaft brackets (INT)
18. Camshaft sensor bracket
A.
Follow installation for tightening steps
EM-42
< ON-VEHICLE REPAIR >
[QR25DE]
CAMSHAFT
10. Loosen the IVT control cover bolts in the order as shown.
• Remove the IVT control cover by cutting the sealant using
Tool.
11. Set the No.1 cylinder at TDC on its compression stroke with the
following procedure:
a. Open the splash cover on RH under cover.
b. Rotate crankshaft pulley clockwise, and align mating marks for
TDC with timing indicator on front cover, as shown.
c.
At the same time, make sure that the mating marks on camshaft
sprockets are lined up with the yellow links in the timing chain,
as shown.
• If not, rotate crankshaft pulley one more turn to line up the
mating marks to the yellow links, as shown.
12. Pull the timing chain guide out between the camshaft sprockets through front cover.
ALBIA0194ZZ
Tool number
: KV10111100 (J-37228)
WBIA0475E
KBIA0190E
KBIA0115E
CAMSHAFT
EM-43
< ON-VEHICLE REPAIR >
[QR25DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
13. Remove camshaft sprockets with the following procedure.
CAUTION:
• Do not rotate the crankshaft or camshaft while the timing
chain is removed. It causes interference between valve
and piston.
NOTE:
• Chain tension holding work is not necessary. Crankshaft
sprocket and timing chain do not disconnect structurally while
front cover is attached.
a. Line up the mating marks on camshaft sprockets with the yellow
links in the timing chain, and paint an indelible mating mark on
the sprocket and timing chain link plate.
b. Push in the tensioner plunger and hold. Insert a stopper pin into
the hole on tensioner body to hold the chain tensioner. Remove
the timing chain tensioner.
• Use a wire with 0.5 mm (0.02 in) diameter for a stopper pin.
c. Secure the hexagonal part of camshaft with a suitable tool.
Loosen the camshaft sprocket mounting bolts and remove the
camshaft sprockets.
14. Loosen the camshaft bracket bolts in the order as shown, and
remove the camshaft brackets and camshafts.
• Remove No.1 camshaft bracket by slightly tapping it with a
rubber mallet.
15. Remove the valve lifters.
• Check mounting positions, and set them aside in the order
removed.
INSPECTION AFTER REMOVAL
Camshaft Runout
1. Put the camshaft on a V-block supporting the No.2 and No.5
journals.
2. Set the dial gauge vertically on the No.3 journal.
3. Turn camshaft in one direction by hand, and measure the cam-
shaft runout on the dial gauge total indicator reading.
Camshaft Cam Height
KBIA0049E
KBIA0048E
WBIA0028E
Standard
: Less than 0.04 mm (0.0016 in)
PBIC0038E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст