Nissan Frontier D22. Instruction — part 858
PR-6
PROPELLER SHAFT ASSEMBLY
PROPELLER SHAFT ASSEMBLY
PFP:37000
Components
EDS00123
FRONT PROPELLER SHAFT
WPD016
PROPELLER SHAFT ASSEMBLY
PR-7
C
E
F
G
H
I
J
K
L
M
A
B
PR
REAR PROPELLER SHAFT
WPD005
LDIA0023E
PR-8
PROPELLER SHAFT ASSEMBLY
Removal and Installation
EDS00124
1.
Put match marks on flanges and separate propeller shaft from
final drive.
1.
Center bearing upper mounting
bracket
2.
Washer
3.
Lock nut
4.
Propeller shaft 2nd tube
5.
Companion flange
6.
Center bearing assembly
7.
Center bearing lower mounting
bracket
8.
Propeller shaft 1st tube
9.
Snap ring
10
Sleeve yoke (A/T)
11.
Sleeve yoke (M/T)
12. Journal
13. Journal bearing
1.
Lock nut
2.
Companion flange
3.
Lock nut
4.
Birfield joint
5.
Propeller shaft second tube
6.
Washer
7.
Spacer
8.
Center bearing lower mounting
bracket
9.
Propeller shaft first tube
10
Snap ring
11.
Sleeve yoke (A/T)
12. Sleeve yoke (M/T)
13. Journal
14. Journal bearing
15. Center bearing assembly
16. Center bearing upper mounting
bracket
LDIA0024E
SPD103
PROPELLER SHAFT ASSEMBLY
PR-9
C
E
F
G
H
I
J
K
L
M
A
B
PR
2.
Remove propeller shaft.
Insert plug into rear oil seal after removing rear propeller
shaft.
Inspection
EDS00125
●
Inspect propeller shaft runout. If runout exceeds specifications,
replace propeller shaft assembly.
●
If the play exceeds specifications, replace propeller shaft
assembly.
Disassembly
EDS00126
CENTER BEARING
1.
Put match marks on flanges, and separate 2nd tube from 1st
tube.
SPD359
Runout limit
: 0.6 mm (0.024 in)
SPD106
Journal axial
play
: 0.02 mm (0.0008 in) or less
SPD874
SPD109
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст