Nissan Titan A60. Instruction — part 299
PROPELLER SHAFT
DLN-135
< UNIT DISASSEMBLY AND ASSEMBLY >
[PROPELLER SHAFT: 2F1310]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
Journal
1. Assemble the journal bearings. Apply multipurpose grease on
the bearing inner surface.
NOTE:
During assembly, use caution so that the needle bearings do not
fall down.
2. Select new snap rings that will provide the specified play in an
axial direction of the journal, and install them. Refer to
.
CAUTION:
Do not reuse snap rings
NOTE:
Select snap rings with a difference in thickness at both sides
within 0.02 mm (0.0008 in).
3. Adjust the thrust clearance between the bearing and snap ring
to zero by tapping the yoke.
4. Make sure that the journal moves smoothly and is below the
joint flex effort specification. Refer to
.
WPD019
APD012
SPD732
LDIA0119E
DLN-136
< SERVICE DATA AND SPECIFICATIONS (SDS)
[PROPELLER SHAFT: 2F1310]
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
General Specification
INFOID:0000000006179520
Unit mm (in)
Propeller Shaft Runout
Unit mm (in)
Propeller Shaft Joint Flex Effort
Unit N·m (kg-m, in-lb)
Journal Axial Play
Unit mm (in)
Snap Ring
INFOID:0000000006179521
Model 2F1310 (4WD)
Unit: mm (in)
*Always check with the Parts Department for the latest parts information.
Applied model
4WD
VK56DE
A/T
Propeller shaft model
2F1310
Number of joints
2
Coupling method with front final drive
Flange type
Coupling method with transfer
Flange type
Installed shaft length (Spider to spider)
696
± 1.5 (27.40 ± 0.06)
Shaft outer diameter
63.5 + 0.00 - 0.13 (2.50 + 0.00 - 0.01)
Item
Limit
Propeller shaft runout
0.60 (0.024)
Item
Limit
Propeller shaft joint flex effort
2.26 (0.23, 20) or less
Item
Limit
Journal axial play
0.02 (0.0008) or less
Thickness
Color
Part Number*
1.99 (0.0783)
White
37146-C9400
2.02 (0.0795)
Yellow
37147-C9400
2.05 (0.0807)
Red
37148-C9400
2.08 (0.0819)
Green
37149-C9400
2.11 (0.0831)
Blue
37150-C9400
2.14 (0.0843)
Light brown
37151-C9400
2.17 (0.0854)
Black
37152-C9400
2.20 (0.0866)
No paint
37153-C9400
PRECAUTIONS
DLN-137
< PRECAUTION >
[PROPELLER SHAFT: 2S1410]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
PRECAUTION
PRECAUTIONS
Precaution for Supplemental Restraint System (SRS) "AIR BAG" and "SEAT BELT
PRE-TENSIONER"
INFOID:0000000006179522
The Supplemental Restraint System such as “AIR BAG” and “SEAT BELT PRE-TENSIONER”, used along
with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain
types of collision. This system includes seat belt switch inputs and dual stage front air bag modules. The SRS
system uses the seat belt switches to determine the front air bag deployment, and may only deploy one front
air bag, depending on the severity of a collision and whether the front occupants are belted or unbelted.
Information necessary to service the system safely is included in the SR and SB section of this Service Man-
ual.
WARNING:
• To avoid rendering the SRS inoperative, which could increase the risk of personal injury or death in
the event of a collision which would result in air bag inflation, all maintenance must be performed by
an authorized NISSAN/INFINITI dealer.
• Improper maintenance, including incorrect removal and installation of the SRS, can lead to personal
injury caused by unintentional activation of the system. For removal of Spiral Cable and Air Bag
Module, see the SR section.
• Do not use electrical test equipment on any circuit related to the SRS unless instructed to in this
Instruction. SRS wiring harnesses can be identified by yellow and/or orange harnesses or har-
ness connectors.
PRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS
WARNING:
• When working near the Airbag Diagnosis Sensor Unit or other Airbag System sensors with the Igni-
tion ON or engine running, DO NOT use air or electric power tools or strike near the sensor(s) with a
hammer. Heavy vibration could activate the sensor(s) and deploy the air bag(s), possibly causing
serious injury.
• When using air or electric power tools or hammers, always switch the Ignition OFF, disconnect the
battery, and wait at least 3 minutes before performing any service.
DLN-138
< PREPARATION >
[PROPELLER SHAFT: 2S1410]
PREPARATION
PREPARATION
PREPARATION
Commercial Service Tool
INFOID:0000000006179523
Tool name
Description
Power tool
Loosening bolts and nuts
PBIC0190E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст