Nissan Note E12. Instruction — part 504
PG
BATTERY
PG-69
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
REMOVAL AND INSTALLATION
BATTERY
Exploded View
INFOID:0000000009015555
Removal and Installation (Battery)
INFOID:0000000009015556
CAUTION:
To prevent damage to the parts, disconnect the battery cable from the negative terminal first.
REMOVAL
1. Remove the air duct inlet. Refer to
.
2. Disconnect the battery cable from the negative terminal and set aside.
3. Disconnect the battery cable from the positive terminal and set aside.
4. Remove the remove the battery wedge bracket.
5. Remove the battery cover and the battery.
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
Replace the battery if it has been dropped or sustained and impact.
To install the battery, carefully read the following instructions:
• To prevent damage to the parts, connect the battery cable to the positive terminal first.
• After connecting battery cables, to securely supply battery voltage, ensure that they are tightly
clamped to battery terminals for good contact.
• To securely supply battery voltage, check battery terminal for poor connection caused by corrosion.
Reset electronic systems as necessary. Refer to
PG-63, "ADDITIONAL SERVICE WHEN REMOVING BAT-
TERY NEGATIVE TERMINAL : Special Repair Requirement"
.
AWGIA0296ZZ
1.
Battery cover
2.
Battery
3.
Battery wedge bracket
4.
Battery tray
5.
Battery tray bracket
Front
PG-70
< REMOVAL AND INSTALLATION >
BATTERY
Removal and Installation (Battery Tray)
INFOID:0000000009643002
CAUTION:
To prevent damage to the parts, disconnect the battery cable from the negative terminal first.
REMOVAL
1. Remove battery. Refer to
PG-69, "Removal and Installation (Battery)"
.
2. Remove the battery bracket. Refer to
3. Remove the IPDM E/R. Refer to
PCS-30, "Removal and Installation"
.
4. Disconnect the harness connector from the TCM and remove the TCM bracket. Refer to
5. Disconnect the harness connectors from the battery tray and battery tray bracket.
6. Remove the nuts and bolts and remove the battery tray bracket and battery tray. Refer to
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
Replace electrical components as necessary, if any have been dropped or sustained and impact.
To install the battery, carefully read the following instructions:
• To prevent damage to the parts, connect the battery cable to the positive terminal first.
• After connecting battery cables, to securely supply battery voltage, ensure that they are tightly
clamped to battery terminals for good contact.
• To securely supply battery voltage, check battery terminal for poor connection caused by corrosion.
Reset electronic systems as necessary. Refer to
PG-63, "ADDITIONAL SERVICE WHEN REMOVING BAT-
TERY NEGATIVE TERMINAL : Special Repair Requirement"
.
PG
BATTERY TERMINAL WITH FUSIBLE LINK
PG-71
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
K
L
B
A
O
P
N
BATTERY TERMINAL WITH FUSIBLE LINK
Exploded View
INFOID:0000000009015557
Removal and Installation
INFOID:0000000009015558
CAUTION:
To prevent damage to the parts, disconnect the battery cable from the negative terminal first.
REMOVAL
1. Disconnect the battery cable from the negative terminal and set aside. Refer to
.
2. Disconnect the battery cable with the fusible link box (battery) from positive terminal.
3. Open cover of the fusible link box (battery).
4. Remove harness nut from the fusible link box (battery) and separate the fusible link box (battery) from ter-
minal connector.
5. Disconnect harness connectors and remove the fusible link box (battery).
INSTALLATION
Installation is in the reverse order of removal.
CAUTION:
Replace the fusible link box (battery) if it has been dropped or sustained and impact.
To install the battery, carefully read the following instructions:
• To prevent damage to the parts, connect the battery cable to the positive terminal first.
• After connecting battery cables, to securely supply battery voltage, ensure that they are tightly
clamped to battery terminals for good contact.
• To securely supply battery voltage, check battery terminal for poor connection caused by corrosion.
Reset electronic systems as necessary. Refer to
PG-63, "ADDITIONAL SERVICE WHEN REMOVING BAT-
TERY NEGATIVE TERMINAL : Special Repair Requirement"
.
AWGIA0297ZZ
1.
Battery
2.
Fusible link box (battery)
3.
Terminal connector
Front
PG-72
< SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
Battery
INFOID:0000000009015560
*: Always check with the Parts Department for the latest parts information.
Type
Q-85
5 hour rate minimum
[V – Ah]
12 – 36
Cold cranking current A (For reference value)
A
470
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст