Nissan Maxima. Instruction — part 281
BRM-36
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
• Front pillar butt joint can be determined anywhere within shaded
area as shown in the figure. The best location for the butt joint is at
position A due to the construction of the vehicle. Refer to the front
pillar section.
• Determine cutting position and record distance from the locating
indent. Use this distance when cutting the service part. Cut outer
front pillar over 60 mm above inner front pillar cut position.
• Prepare a cutting jig to make outer pillar easier to cut. Also, this will
permit service part to be accurately cut at joint position.
• An example of cutting operation using a cutting jig is as follows.
1. Mark cutting lines.
A: Cut position of outer pillar
B: Cut position of inner pillar
2. Align cutting line with notch on jig. Clamp jig to pillar.
3. Cut outer pillar along groove of jig. (At position A)
4. Remove jig and cut remaining portions.
5. Cut inner pillar at position B in same manner.
FOAM REPAIR
During factory assembly, foam insulators are installed in certain body panels and locations around the vehicle.
Use the following procedure(s) to replace any factory-installed foam insulators.
Urethane Foam Applications
Use commercially available spray for sealant (foam material) repair of material used on vehicle. Read instruc-
tions on product for fill procedures.
Fill Procedures
1. Fill procedures after installation service part.
• Remove foam material remaining on vehicle side.
PIIA0150E
PIIA0151E
PIIA0152E
PIIA0153E
REPLACEMENT OPERATIONS
BRM-37
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
• Clean area in which foam was removed.
• Install service part.
• Insert nozzle into hole near fill area and fill foam material or fill in enough to close gap with service part.
2. Fill procedures before installation service part
• Remove foam material remaining on vehicle side.
• Clean area in which foam material on wheelhouse outer side was removed.
NOTE:
Fill in enough to close gap with service part while avoiding flange
area.
• Install service part.
NOTE:
Refer to label for information on working times.
LIIA1081E
LIIA1082E
BRM-38
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Note:
Views F & G are shown with the body side outer removed.
1.
Body side outer
2.
Body side insulation (foam) upper
front pillar
3.
Body side insulation (foam) front pil-
lar
4.
Roof panel assembly
5.
Roof panel insulation (foam) front
roof rail (standard roof)
6.
Body side insulation (foam) rear pil-
lar
7.
Body side insulation (foam) lower
rear pillar
8.
Body side insulation strip front pillar
lower reinforcement
9.
Body side insulation strip, center pil-
lar reinforcement
AWKIA1361GB
REPLACEMENT OPERATIONS
BRM-39
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
Hoodledge
INFOID:0000000009465847
Replacement parts
z
Front suspension spring support
z
Hoodledge reinforcement
z
Hoodledge lower assembly
z
Upper radiator core support
AWKIA1363GB