Jaguar 5HP24 transmission. Service manual — part 24
Insert the complete unit into ring gear I
32.140 and snap it in with snap ring
32.150.
Put the ring gear on a suitable support to
accomplish this task.
Insert sun wheel I 32.190 with the notch
on the toothtip looking downwards.
(Towards the output side to optimize the
meshing sound.)
Insert axial needle roller bearing 32.210.
Insert planet carrier II 32.110 into ring
gear I.
Put it onto the support fixture for tower I
5x46 000 916 to make assembly easier.
3.3/2
97100
97228
97104
Insert ring gear III 32.240 with the outer
engaging gears towards the top and
secure it with snap ring 32.250. To put
the snap ring in position, lift ring gear I
slightly.
Take planetary drive (I and II with ring
gear III) off the device.
Put planet carrier III 42.010 onto the
device and insert sun wheel 32.360.
Turn the planetary drive as you put it on
the planet carrier.
3.3/3
97105
97106
97107
Press disc carrier E 32.330 on to the
planetary drive.
3.3.2
Brakes (E and D)
3.3/4
97229
32.330
32.340
/110
/120
73.010/150
73.010/154
73.010/110
73.010/220
73.010/140
73.010/190
73.010/180
73.010/170
73.010/160
73.010/152
73.010/200
73.010/210
74.010
74.020
74.014
74.012
74.030
74.050
74.060
74.070
74.090
74.130
74.150
74.140
Assemble axial washer 32.340/110.
Complete cylinder DE 73.010/110.
First put on two O-rings (74.010/140,
74.010/150) to the bushing 74.010/130
and press it into cylinder DE.
Drive two shaft keys 73.010/140 onto the
center of cylinder DE using the plastic
hammer.
Turn cylinder DE over.
Put new O-ring 74.012 on piston E 74.010
and O-ring 74.014 on the cylinder E.
Press piston E into cylinder DE.
3.3/5
97109
97110
97230
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст