Daewoo Nubira. Manual — part 28
DOORS 9P – 27
DAEWOO V–121 BL4
REAR DOOR ASSEMBLY
Removal Procedure
1. Disconnect the negative battery cable.
2. Remove the bolt and the door hold open link from
the body.
3. With the aid of another technician, remove the door
hinge bolts and the rear door.
4. Disconnect the body–to–door rubber grommet and
the electrical connector.
9P – 28
I
DOORS
DAEWOO V–121 BL4
Installation Procedure
1. Connect the body–to–door rubber grommet and the
electrical connector.
Notice : Dissimilar metals in direct contact with each other
may corrode rapidly. Make sure to use the correct fasten-
ers to prevent premature corrosion.
2. With the aid of another technician, lightly secure the
rear door with the door hinge bolts.
3. Adjust the door for proper fit.
Tighten
Tighten the door hinge bolts to 25 N
S
m (18 lb–ft).
4. Install the rear door hold open link to the body with
the bolt.
Tighten
Tighten the door hold open link–to–body bolt to 27
N
S
m (20 lb–ft).
5. Connect the negative battery cable.
6. Perform the waterleak test. Refer to Section 9I,
Waterleaks.
7. Check for windnoise. Refer to Section 9J, Wind-
noise.
DOORS 9P – 29
DAEWOO V–121 BL4
DOOR HINGE
Removal Procedure
1. With the aid of another technician, remove the bolts
and the hinge from the door and the body.
Installation Procedure
Notice : Dissimilar metals in direct contact with each other
may corrode rapidly. Make sure to use the correct fasten-
ers to prevent premature corrosion.
1. With the aid of another technician, install the hinge
to the door and the body with the bolts.
Tighten
Tighten the door hinge bolts to 25 N
S
m (18 lb–ft).
DOOR HOLD OPEN LINK
Removal Procedure
1. Remove the door trim panel. Refer toSection 9G,
Interior Trim.
2. Reposition the door seal trim.
3. Remove the bolts on the door and on the body.
4. Remove the door hold open link.
9P – 30
I
DOORS
DAEWOO V–121 BL4
Installation Procedure
Notice : Dissimilar metals in direct contact with each other
may corrode rapidly. Make sure to use the correct fasten-
ers to prevent premature corrosion.
1. Install the door hold open link to the door and the
body with the bolts.
Tighten
Tighten the door hold open link–to–body bolt to 27
N
S
m (20 lb–ft).
Tighten the door hold open link–to–door bolts to 6
N
S
m (53 lb–in).
2. Reposition the door seal trim.
3. Install the door trim panel. Refer toSection 9G, Inte-
rior Trim.
INSIDE CHANNEL MOLDING
Removal Procedure
1. Remove the door trim panel. Refer to Section 9G,
Interior Trim.
2. Straighten the retaining tabs in order to release the
channel molding from the door trim panel.
3. Remove the channel molding.
Installation Procedure
1. Install the channel molding onto the door trim panel.
2. Bend the retaining tabs to secure the channel mold-
ing to the door trim panel.
3. Install the door trim panel. Refer to Section 9G, In-
terior Trim.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст