Daewoo Nubira. Manual — part 221
6C – 20
I
POWER STEERING GEAR
DAEWOO V–121 BL4
Installation Procedure
1. Lubricate any new O–ring seals with power steering
fluid.
2. Place the O–ring seals into the housing and install
the steering gear hydraulic cylinder pipes.
3. Connect the power steering gear hydraulic cylinder
pipes to the power steering gear at the valve end.
Tighten
Tighten the hydraulic cylinder line fittings at the valve
end to 18 N
S
m (13 lb–ft).
4. Connect the power steering gear hydraulic cylinder
pipes to the power steering gear at the cylinder end
and clip them to the power steering fluid reservoir
return line.
Tighten
Tighten the hydraulic cylinder line fittings at the cylin-
der end to 27 N
S
m (20 lb–ft).
5. Lower the vehicle.
Notice : When adding fluid or making a complete change,
always use DEXRON
±
–III power steering fluid. Failure to
use the proper fluid will cause hose and seal damage and
fluid leaks.
6. Fill the fluid reservoir with power steering fluid.
7. Inspect for leaks. If there are leaks, correct the
cause of the leaks and bleed the system. Refer
to”Bleeding the Power Steering System”in this sec-
tion.
POWER STEERING GEAR 6C – 21
DAEWOO V–121 BL4
UNIT REPAIR
RACK AND PINION
Tools Required
KM–J–22610 Installer
Disassembly Procedure
1. Remove the rack and pinion steering assembly
from the vehicle. Refer to”Rack and Pinion Assem-
bly”in this section.
2. Remove the valve and pinion assembly from the
rack and pinion steering assembly. Refer to”Valve
and Pinion”in this section.
3. Remove the rack bearing assembly from the rack
and pinion steering assembly. Refer to”Rack Bear-
ing”in this section.
4. Mark the threads on the inner tie rod to aid in re-
positioning the adjusting nut.
5. Loosen the adjusting nut and remove the outer tie
rod nut and the adjusting nut.
6. Remove the dust boot retaining clamps.
6C – 22
I
POWER STEERING GEAR
DAEWOO V–121 BL4
7. Remove the dust boot.
8. Push back the plastic retainer that protects the con-
nection between the inner tie rod and the power
steering gear rack.
9. Counterhold the pinion–side inner tie rod and re-
move the cylinder–side inner tie rod.
POWER STEERING GEAR 6C – 23
DAEWOO V–121 BL4
10. Place a rag over the rack, counterhold the rack as-
sembly on the teeth with a wrench, and remove the
pinion–side inner tie rod.
Important : The retaining ring can be released by insert-
ing a small screwdriver through the hole in the side of the
housing.
11. Remove the bulkhead inner cylinder retaining ring
the bulkhead inner cylinder and the rack.
Assembly Procedure
Notice : Coat all the seals with power steering fluid to en-
sure proper sealing.
1. Install the rack, the bulkhead inner cylinder, and the
bulkhead inner cylinder retaining ring.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст