SsangYong Musso. Manual — part 532
7B/C-8 MANUAL & SEMIAUTO-HVAC
AIR CONDITIONER SYSTEM
DIESEL ENGINE
1 Compressor
2 High Pressure Hose
3 Condenser Fan
4 Condenser
5 Liquid Pipe (A)
6 Receiver Drier
7 Liquid (B)
8 Evaporator Assembly
9 Low Pressure Hose
10 Water Inlet Hose
11 Water Outlet Hose
12 Control Assembly
13 Heater Unit Amplifier
14 Mix Actuator Assembly
15 Blower Unit
16 Heater Unit
17 Mode Actuator Assembly
MANUAL & SEMIAUTO-HVAC 7B/C-9
GASOLINE ENGINE
1 Compressor
2 High Pressure Hose
3 Condenser
4 Main Condenser Fan
5 Sub Condenser Fan
6 Condenser Fan Resistor
7 Liquid Pipe(A)
8 Receiver Dryer
9 Liquid Pipe(B)
10 Grommet
11 Evaporator Assembly
12 Control Assembly
13 Heater Unit Amp
14 Mix Actuator
15 Blower Unit
16 Heater Unit
17 Mode Actuator Assembly
18 Water Inlet Hose
19 Water Outlet Hose
7B/C-10 MANUAL & SEMIAUTO-HVAC
REFRIGERANT CHARGING
Installation of Manifold Gauge
1. Close both high/low pressure hand valve of gauge before
installation of gauge to the charging valve.
2. Connect the low pressure hose of the gauge to the low
pressure charging valve and the high pressure hose of the
gauge to high pressure charging valve. Tighten the hose
nuts by hand.
Discharging of Refrigerant
1. Connect the manifold gauge to the charging valve.
2. Place the free end of center hose in a shop towel.
3. Slowly open the high pressure hand valve and discharge
refrigerant.
Notice
If refrigerant is allowed to escape too fast, compressor oil
will be drawn out of the system.
MAINTENANCE AND REPAIR
MANUAL & SEMIAUTO-HVAC 7B/C-11
Evacuating Refrigeration System
1. Connect the manifold gauge to the charging valves.
2. Connect the center hose of the gauge to the vacuum pump.
3. Run the vacuum pump and open both high and low pressure
hand valves.
4. Run the vacuum pump 15-20 minutes.
5. Check that both high and low pressure gauge reading is
more than (-) 750mmHg of vacuum and close both valves.
Check for Refrigerant Leaks
1. Connect the center hose of the gauge to the refrigerant
tank.
2. Open the high pressure valve of the gauge to charge with
refrigerant gas.
3. Charge until the low pressure gauge reads 1.0kg/cm and
close the valve.
4. Using a gas leak detector, check the system for leaks.
5. If a leak is found, replace a O-ring or repair the faulty
connection
2
6. Stop the vacuum pump and wait about 5 minutes.
7. After 5 minutes, check that low pressure gauge reading is
changed or not.
8. If low pressure gauge reading is changed, check the system
for leaks and repair as necessary and repeat steps from
‘ 1 ’ t o ‘ 7 ’ .
9. If there are no changes in low pressure gauge reading,
disconnect the vacuum pump.
4. After the high pressure gauge reading drops below 3.5kg/
cm2 , slowly open the low pressure valve.
5. When both high and low pressure gauges reading drops to
0 kg/cm, discharging is completed.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст