SsangYong Musso. Manual — part 274

M161 ENGINE MECHANICAL 1B2-23

Removal & Installation Procedure

1. Remove the belt pulley after removal of poly v-belt.

Installation Notice

2. Disconnect the hydraulic pipe of the power steering pump

and drain the oil.

3. Unscrew the bolts (arrows) and remove the steering pump.

Installation Notice

Notice

Pull the tensioning pulley counterclockwise as shown in the
figure.

4. Remove the compressor after disconnecting the wiring

connector and refrigerant pipe of A/C compressor.

Notice

Discharge all the refrigerant before removing the pipes.

Tightening Torque

40.5 - 49.5 Nm

Tightening Torque

22.5 - 27.5 Nm

1B2-24 M161 ENGINE MECHANICAL

5. Disconnect the vent hose from the A/C bracket.

6. Unscrew all the mounting bolts (arrows) and remove the

A/C bracket and the gasket.

Installation Notice

7. Clean the sealing surface.

8. Replace the gasket with new one.

9. Installation should follow the removal procedure in the

reverse order.

10. Check the oil leakage by operating the engine after

installation.

Tightening Torque

22.5 - 27.5 Nm

M161 ENGINE MECHANICAL 1B2-25

HYDRAULIC ENGINE MOUNTING INSULATOR

Service Data

1B2-26 M161 ENGINE MECHANICAL

Sectional View

1 Rubber Body
2 Brackek
3 Core
4 Lower Bolt
5 Rubber Plunger
6 Plunger Plate
7 Rubber
8 Plate

9 Lower Orifice

10 Upper Orifice

11 Diaphram

12 Cover Plate
13 Upper Bolt
14 Flange Bolt
15 Rivet
16 Fluid

Была ли эта страница вам полезна?
Да!Нет
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности