SsangYong Rexton. Manual — part 565
MANUAL TRANSMISSION 5B-17
SSANGYONG Y200
4. Push down the shift lever and the lining shift socket
from the control housing arm.
YAD5B160
YAD5B170
YAD5B240
5. Insert the clip pin to fix the cover assembly and
the control housing arm.
6. Insert the metal bushing to the shift rod.
YAD5B230
3. Insert the rail to U-joint assembly and assemble
the retainer ring using the snap ring plier.
SSANGYONG Y200
5B-18 MANUAL TRANSMISSION
8. Insert the washer and assemble the snap ring.
YAD5B130
YAD5B260
9. Insert the control housing arm insulator to the semi-
remote kit.
YAD5B250
7. Assemble the shift rod, the shift rail and U-joint
using the pin.
MANUAL TRANSMISSION 5B-19
SSANGYONG Y200
TRANSMISSION
Removal Procedure
1. Disconnect the negative terminal from the battery.
2. Lift up the vehicle and fix it safely.
3. Remove the drain plug from the transmission
housing and drain the oil. Reinstall the drain plug.
4. Disconnect the back-up switch connector.
5. Remove the breather hose.
YAD5B280
YAD5B290
YAD5B300
YAD5B310
6. Remove the speedometer connector and other
wiring harnesses and connectors.
SSANGYONG Y200
5B-20 MANUAL TRANSMISSION
7. Remove the front and rear propeller shafts from
the transfercase.
8. Support the transmission on an suitable jack.
Unscrew the center mounting nuts and each sides
mounting bolts and remove the cross member.
9. Remove the transmission mounting bolts.
Notice: For removing the transmission, there may
be any damage in the clutch housing inside CSC.
Thus remove the transmission with the clutch
housing.
10. Move the transmission jack backward careful and
disengage the transmission input shaft from the
engine.
Remove the transmission.
YAD5B320
YAD5B330
YAD5B340
YAD5B020
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст