Isuzu D-Max / Isuzu Rodeo (TFR/TFS). Manual — part 1802

UNIT REPAIR (JR405E) 7A4-75

22ASSY042

Install the bearing to the front sun gear.

23ASSY045


10.High clutch hub and bearing race

Install the bearing race to the high clutch hub.

NOTE:
Apply Vaseline to the bearing race.

24ASSY047


Install the high clutch hub and the bearing race to the

transmission case.

25R&H42


11.Clutch pack (reverse and high clutch assembly)

Install the bearing (with bearing race) to the clutch pack.

NOTE:

••••

The black side (bearing race) of the bearing must

contact the clutch pack.

••••

Apply Vaseline to the bearing.

26ASSY049


Install the clutch pack and bearing to the transmission

case.

7A4-76 UNIT REPAIR (JR405E)

27ASSY051


Install the bearing to the clutch pack.

NOTE:
Apply Vaseline to the bearing.

A07L300002


Total end play measurement

Install the bearing race (oil pump) to the clutch pack.

Measure the distance (A) between the oil pump

installation surface and the bearing race.

241L300003


Measure the distance (B) between the bearing race

installation surface and the machined surface.

Calculate the total end play using the following formula.

Total end play = distance (A) – distance (B)

If the measured and calculated end play is outside the

specified range, replace the existing bearing race with a

bearing race of the proper size (thickness).

Total end play = 0.25~0.55 mm (0.0098~0.0217 in)

Available oil pump bearing race thicknesses

1.4 mm (0.055 in)

1.6 mm (0.063 in)

1.8 mm (0.071 in)

2.0 mm (0.079 in)

2.2 mm (0.087 in)

2.4 mm (0.094 in)

UNIT REPAIR (JR405E) 7A4-77

28ASSY058


12.Input shaft

Install the input shaft.

29PUMP02


13.Oil pump assembly

Install a new O-ring to the outside of the oil pump.

Install the bearing race to the oil pump.

NOTE:
Apply Vaseline to the bearing race.

30ASSY067


Apply ATF to the O-ring at the outside of the oil pump.

Install the oil pump assembly to the transmission case.

Apply sealing agent (TB1215) to the threaded surfaces

of the 8 fixing bolts and tighten to the specified torque.

Torque: 58 N

⋅⋅⋅⋅

m (43 Ib

⋅⋅⋅⋅

ft)

31ASSY068


14.O-ring

Install a new O-ring to the input shaft.

32ASSY116


15.Converter housing

Install the converter housing and tighten the bolts to the

specified torque.

Torque: 53 N

⋅⋅⋅⋅

m (39 Ib

⋅⋅⋅⋅

ft)

7A4-78 UNIT REPAIR (JR405E)

33ASSY075


16.Actuator support

Install the actuator support.

34ASSY077


17.Parking pawl, shaft, spring, and spacer

Install the parking pawl, the shaft, the spring, and the

spacer.

35ASSY082

36ASSY084

37ASSY086

Была ли эта страница вам полезна?
Да!Нет
3 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности