Nissan Pathfinder (2008 year). Manual — part 217
DLN-320
< SERVICE DATA AND SPECIFICATIONS (SDS)
[PROPELLER SHAFT: 2S1330]
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
SERVICE DATA AND SPECIFICATIONS (SDS)
General Specification
INFOID:0000000001297258
2WD models
Propeller Shaft Runout
Propeller Shaft Joint Flex Effort
Journal Axial Play
4WD models
Propeller Shaft Runout
Propeller Shaft Joint Flex Effort
Applied model
2WD
VQ40DE
A/T
Propeller shaft model
2S1330 (aluminum tube)
Number of joints
2
Coupling method with rear final drive
Flange type
Coupling method with transmission
Sleeve type
Shaft length (Spider to spider)
1422.2 mm (55.99 in)
Shaft outer diameter
127.6 mm (5.02 in)
Item
Limit
Propeller shaft runout
1.02 mm (0.0402 in) or less
Item
Limit
Propeller shaft joint flex effort
2.26 N·m (0.23 kg-m, 20 in-lb) or less
Item
Limit
Journal axial play
0.02 mm (0.0008 in) or less
Applied model
4WD
Part time
Full time
VQ40DE
A/T
Propeller shaft model
2S1330 (steel tube)
Number of joints
2
Coupling method with front final drive
Flange type
Coupling method with transfer
Sleeve type
Shaft length (Spider to spider)
952.8 mm (37.51 in)
917.8 mm (36.13 in)
Shaft outer diameter
76.2 mm (3.00 in)
Item
Limit
Propeller shaft runout
0.6 mm (0.024 in) or less
SERVICE DATA AND SPECIFICATIONS (SDS)
DLN-321
< SERVICE DATA AND SPECIFICATIONS (SDS)
[PROPELLER SHAFT: 2S1330]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
Journal Axial Play
Snap Ring
INFOID:0000000001297259
Model 2S1330 (4WD)
Unit: mm (in)
*Always check with the Parts Department for the latest parts information.
Model 2S1330 (2WD)
Unit: mm (in)
*Always check with the Parts Department for the latest parts information.
Item
Limit
Propeller shaft joint flex effort
2.26 N·m (0.23 kg-m, 20 in-lb) or less
Item
Limit
Journal axial play
0.02 mm (0.0008 in) or less
Thickness
Color
Part Number*
1.99 (0.0783)
White
37146-C9400
2.02 (0.0795)
Yellow
37147-C9400
2.05 (0.0807)
Red
37148-C9400
2.08 (0.0819)
Green
37149-C9400
2.11 (0.0831)
Blue
37150-C9400
2.14 (0.0843)
Light brown
37151-C9400
2.17 (0.0854)
Black
37152-C9400
2.20 (0.0866)
No paint
37153-C9400
Thickness
Color
Part Number*
1.600 - 1.638 (0.0630 - 0.0645)
Black
37146-EA500
1.549 - 1.588 (0.0610 - 0.0625)
Black
37147-EA500
1.524 - 1.562 (0.0600 - 0.0615)
Black
37148-EA500
1.499 - 1.537 (0.0590 - 0.0605)
Black
37149-EA500
DLN-322
< PREPARATION >
[PROPELLER SHAFT: 2S1350]
PREPARATION
PREPARATION
PREPARATION
Commercial Service Tool
INFOID:0000000001297260
Tool name
Description
Power tool
Loosening bolts and nuts
PBIC0190E
NOISE, VIBRATION, AND HARSHNESS (NVH) TROUBLESHOOTING
DLN-323
< FUNCTION DIAGNOSIS >
[PROPELLER SHAFT: 2S1350]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
FUNCTION DIAGNOSIS
NOISE, VIBRATION, AND HARSHNESS (NVH) TROUBLESHOOTING
NVH Troubleshooting Chart
INFOID:0000000001297261
Use the chart below to help you find the cause of the symptom. If necessary, repair or replace these parts.
×
: Applicable
Reference page
Possible cause and suspected parts
Une
v
en
rot
a
ti
on
torq
ue
Rot
a
ti
on
im
ba
la
nc
e
Ex
ce
ss
iv
e run
ou
t
Di
ff
ere
n
ti
al
Axle
Su
sp
en
si
on
Ti
re
s
Road wheel
Driv
e sh
af
t
Brak
es
S
tee
ring
Symptom
Noise
×
×
×
×
×
×
×
×
×
×
×
Shake
×
×
×
×
×
×
×
Vibration
×
×
×
×
×
×
×
×
DLN-324
< ON-VEHICLE REPAIR >
[PROPELLER SHAFT: 2S1350]
PROPELLER SHAFT
ON-VEHICLE REPAIR
PROPELLER SHAFT
On-Vehicle Service
INFOID:0000000001297265
APPEARANCE AND NOISE INSPECTION
• Check the propeller shaft tube surface for dents or cracks. If damaged, replace the propeller shaft assembly.
• Check the bearings for noise and damage. Repair or replace the bearings as necessary.
PROPELLER SHAFT VIBRATION
If a vibration is present at high speed, inspect the propeller shaft runout first.
1.
Measure the runout of the propeller shaft tube at several points
by rotating the final drive companion flange with your hands.
Refr to
DLN-329, "General Specification"
2.
If the runout exceeds specifications, disconnect the propeller
shaft at the final drive companion flange; then rotate the com-
panion flange 90
°
, 180
°
and 270
°
and reconnect the propeller
shaft.
3.
Check the runout again. If the runout still exceeds specifications,
replace the propeller shaft assembly.
4.
After installation, check for vibration by driving vehicle.
LDIA0161E
LDIA0121E
PROPELLER SHAFT
DLN-325
< REMOVAL AND INSTALLATION >
[PROPELLER SHAFT: 2S1350]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
REMOVAL AND INSTALLATION
PROPELLER SHAFT
Removal and Installation
INFOID:0000000001297266
COMPONENTS
REMOVAL
1.
Move the A/T select lever to the N position and release the parking brake.
2.
Put matching marks on the rear propeller shaft flange yoke and
the rear final drive companion flange as shown.
CAUTION:
For matching marks, use paint. Never damage the rear pro-
peller shaft flange yoke or the companion flange.
3.
Remove the bolts, then remove the propeller shaft from the rear
final drive and A/T or transfer.
INSPECTION
1.
Propeller shaft tube
2.
Snap ring
3.
Journal bearing
4.
Sleeve yoke
5.
Journal
6.
Flange yoke
⇐
:
Front
AWDIA0017ZZ
WDIA0049E
DLN-326
< REMOVAL AND INSTALLATION >
[PROPELLER SHAFT: 2S1350]
PROPELLER SHAFT
• Inspect the propeller shaft runout. If runout exceeds the limit,
replace the propeller shaft assembly. Refer to
• While holding the flange yoke on one side, check axial play of the
joint as shown. If the journal axial play exceeds the specification,
repair or replace the journal parts. Refer to
• Check the propeller shaft tube for dents or cracks. If damage is
detected, replace the propeller shaft assembly.
INSTALLATION
Installation is in the reverse order of removal.
• After installation, check for vibration by driving the vehicle. Refer to
DLN-323, "NVH Troubleshooting Chart"
.
• If propeller shaft assembly of final drive assembly has been
replaced, connect them as follows:
- Face companion flange mark (A) of the final drive (1) upward. With
the mark (A) faced upward, couple the propeller shaft and the final
drive so that the matching mark (B) of the propeller shaft (2) can be
positioned as close as possible with the matching mark (C) of the
final drive companion flange.
- Tighten propeller shaft and final drive bolts and nuts of the to spec-
ification. Refer to
DLN-325, "Removal and Installation"
CAUTION:
Do not reuse the bolts and nuts. Always install new ones.
LDIA0121E
LDIA0117E
PDIA0892J
PROPELLER SHAFT
DLN-327
< DISASSEMBLY AND ASSEMBLY >
[PROPELLER SHAFT: 2S1350]
C
E
F
G
H
I
J
K
L
M
A
B
DLN
N
O
P
DISASSEMBLY AND ASSEMBLY
PROPELLER SHAFT
Disassembly and Assembly
INFOID:0000000001297267
DISASSEMBLY
Journal
1.
Put matching marks on the rear propeller shaft and flange yoke
as shown.
CAUTION:
For matching marks use paint. Never damage the rear pro-
peller shaft or flange yoke.
2.
Remove the snap rings.
3.
Push out and remove the journal bearings by lightly tapping the
flange yoke with a hammer, taking care not to damage the jour-
nal or flange yoke hole.
NOTE:
Put marks on the disassembled parts so that they can be rein-
stalled in their original positions from which they were removed.
4.
Push out and remove the remaining journal bearings at the
opposite side by lightly tapping the flange yoke with a hammer,
taking care not to damage the journal or flange yoke hole.
NOTE:
Put marks on the disassembled parts so that they can be rein-
stalled in their original positions from which they were removed.
ASSEMBLY
SPD128
APD011
SPD732
SPD131
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст