Nissan Rogue. Manual — part 693
FRONT DRIVE SHAFT
FAX-65
< UNIT DISASSEMBLY AND ASSEMBLY >
[AWD]
C
E
F
G
H
I
J
K
L
M
A
B
FAX
N
O
P
UNIT DISASSEMBLY AND ASSEMBLY
FRONT DRIVE SHAFT
Exploded View (LH)
INFOID:0000000011278659
Disassembly and Assembly (LH)
INFOID:0000000011278660
DISASSEMBLY
Transaxle Side
1. Secure front drive shaft in a vise.
CAUTION:
When securing shaft in a vise, always use copper or aluminum plates between the vise and shaft.
2. Remove boot bands and slide the boot back.
3. Remove stopper ring.
4. Put matching marks on housing and shaft, and then pull out housing from shaft.
CAUTION:
Use paint or an equivalent for matching marks. Do not scratch the surfaces.
5. Put matching marks (A) on the spider assembly and shaft.
CAUTION:
Use paint or an equivalent for matching marks. Do not
scratch the surfaces.
1.
Shaft
2.
Circular clip
3.
Dust shield
4.
Housing
5.
Snap ring
6.
Spider assembly
7.
Stopper ring
8.
Boot
9.
Boot band
10. Joint sub-assembly
Wheel side
AWDIA1161ZZ
JPDIF0006ZZ
FAX-66
< UNIT DISASSEMBLY AND ASSEMBLY >
[AWD]
FRONT DRIVE SHAFT
6. Remove snap ring (1), and then remove spider assembly from
shaft.
7. Remove boot from shaft.
8. Remove circular clip from housing.
9. Remove dust shield from housing.
10. Clean old grease on housing using paper shop cloths.
Wheel Side
1. Secure front drive shaft in a vise.
CAUTION:
When securing shaft in a vise, always use copper or aluminum plates between vise and shaft.
2. Remove boot bands and slide the boot back.
3. Screw a suitable tool (A) 30 mm (1.18 in) or more into threaded
part of joint sub-assembly. Pull joint sub-assembly out of shaft.
CAUTION:
• Align suitable tool (B) and drive shaft then remove joint
sub-assembly by pulling directly.
• If joint sub-assembly cannot be removed after five or
more unsuccessful attempts, replace entire drive shaft.
4. Remove circular clip from shaft.
5. Remove boot from shaft.
6. Clean old grease on joint sub-assembly using paper shop cloths
while rotating ball cage.
INSPECTION AFTER DISASSEMBLY
Shaft
Check shaft for runout, cracks, or other damage. Replace entire drive shaft if necessary.
Dynamic Damper
Check damper for cracks or wear. Replace drive shaft if necessary.
Joint Sub-Assembly (Wheel Side)
Check the following:
• Joint sub-assembly for rough rotation and excessive axial looseness
• The inside of the joint sub-assembly for entry of foreign material
• Joint sub-assembly for compression scars, cracks, and fractures inside of joint sub-assembly
Replace entire drive shaft if necessary.
Housing and Spider assembly (Transaxle Side)
Replace entire drive shaft if there is scratching or wear of housing roller contact surface or spider roller contact
surface.
ASSEMBLY
Transaxle Side
1. Install new boot and boot bands to shaft.
CAUTION:
• Wrap serration on shaft with tape (A) to protect from dam-
age
• Do not reuse boot and boot band.
2. Remove the tape wrapped around the serration on shaft.
JPDIF0014ZZ
JPDIF0015ZZ
JPDIF0009ZZ
FRONT DRIVE SHAFT
FAX-67
< UNIT DISASSEMBLY AND ASSEMBLY >
[AWD]
C
E
F
G
H
I
J
K
L
M
A
B
FAX
N
O
P
3. Align the matching mark (A) on the spider assembly (1) with the
matching mark on the shaft (2). Install the spider assembly to
the shaft with the chamfer (B) facing the shaft.
4. Secure spider assembly onto shaft with snap ring (1).
CAUTION:
Do not reuse snap ring.
5. Apply the appropriate amount of Genuine NISSAN Grease to spider assembly and sliding surface.
NOTE:
Always check with the Parts Department for the latest parts information.
6. Assemble the housing onto spider assembly, and apply the specified amount of Genuine NISSAN
Grease.
NOTE:
Always check with the Parts Department for the latest parts information.
7. Align matching marks put during the removal of housing.
8. Install stopper ring.
CAUTION:
Do not reuse stopper ring.
9. Install boot securely into grooves (indicated by “*” marks)
shown.
CAUTION:
If grease adheres to the boot mounting surface (indicated
“*” mark) on shaft or housing, boot may be removed.
Remove all grease from the boot mounting surface.
10. To prevent the deformation of the boot, adjust the boot installa-
tion length (L) to the value shown below by inserting the suitable
tool into the inside of boot from the large diameter side of boot
and discharging inside air.
CAUTION:
• If the boot installation length is outside the standard, it may cause breakage of boot.
• Be careful not to touch the inside of the boot with the tip of tool.
JPDIF0017ZZ
JPDIF0014ZZ
Grease quantity
Boots installed
length (L)
JPDIF0238ZZ
FAX-68
< UNIT DISASSEMBLY AND ASSEMBLY >
[AWD]
FRONT DRIVE SHAFT
11. Install new boot bands securely as shown.
CAUTION:
Do not reuse boot band.
12. Secure housing and shaft, and then make sure that they are in the correct position when rotating boot.
Reinstall them with new boot bands when the mounting positions become incorrect.
13. Install dust shield to housing.
CAUTION:
Do not reuse dust shield.
14. Install circular clip to housing.
CAUTION:
Do not reuse circular clip.
Wheel Side
1. Insert the amount of Genuine NISSAN Grease into joint sub-
assembly (1) serration hole until grease begins to ooze from ball
groove and serration hole.
CAUTION:
After inserting the grease, use a paper shop cloth to wipe
off old grease that has oozed out.
NOTE:
Always check with the Parts Department for the latest parts
information.
2. Install new boot and new small boot band on shaft.
CAUTION:
• Do not reuse the boot and boot bands.
• Cover drive shaft serration with protective tape (A) to pre-
vent damage to boot during installation.
3. Remove protective tape wound around serrated part of shaft.
4. Attach new circlip to shaft. The circlip must fit securely into shaft
groove. Attach nut to joint sub-assembly.
Use a suitable tool to press-fit.
CAUTION:
Do not reuse circlip.
5. Insert the amount of new Genuine NISSAN Grease listed below into housing from large end of boot.
PDIA1188J
JPDIF0008ZZ
JPDIF0009ZZ
RAC0049D
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст