Nissan Qashqai J11. Manual — part 87
TURBOCHARGER
EM-287
< REMOVAL AND INSTALLATION >
[K9K]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
TURBOCHARGER
Exploded View
INFOID:0000000010287203
Refert to
for symbol marks in the figure.
Removal and Installation
INFOID:0000000010282069
REMOVAL
1.
Remove cowl top. Refer to
2.
Remove air cleaner case. Refer to
EM-275, "Removal and Installation"
.
3.
Drain engine coolant. Refer to
.
4.
Remove air inlet tube and air inlet hose. Refer to
5.
Remove diesel particulate filter assembly. Refer to
6.
Remove EGR volume control valve housing. Refer to
7.
Remove EGR cooler.
8.
Remove oil tubes.
9.
Remove turbocharger assembly (1) as follows.
1.
Oil supply tube
2.
Heat insulator
3.
Bracket
4.
Gasket
5.
Oil return pipe
6.
Oil return pipe
7.
O-ring
8.
Exhaust manifold
9.
Gasket
10. Bracket
11.
Spacer
12. Rubber
13. Gasket
14. Turbocharger air inlet pipe
15. Turbocharger
A.
To DPF
B.
To charge air cooler
C.
From low pressure EGR
D.
From turbocharger air inlet pipe
E.
To blow by hose
E1BIA1187GB
EM-288
< REMOVAL AND INSTALLATION >
[K9K]
TURBOCHARGER
NOTE:
After applying penetrative lubrificant to the mounting nuts, check for the penetration of the lubrificant, and
then loosen the nuts to remove.
10. Remove turbocharger oil outlet hose.
CAUTION:
Be careful not to deform each turbocharger piping when pulling out the assembly.
11. Remove turbocharger outlet duct.
INSTALLATION
Install in the reverse order of removal.
NOTE:
Apply LOCTITE FRENETANCHE or equivalent to the threads of the turbocharger oil inlet pipe union to the cyl-
inder head.
Inspection
INFOID:0000000010287204
INSPECTION AFTER REMOVAL
Turbocharger
CAUTION:
When the compressor wheel, turbine wheel or rotor shaft is damaged, remove all the fragments and
foreign matter left in the following passages in order to prevent a secondary failure:
INSPECTION AFTER INSTALLATION
Start engine and raise engine speed to check no exhaust emission leaks.
Suction side
: Between turbocharger and air cleaner
Exhaust side
: Between turbocharger and outlet duct
E1BIA0906ZZ
A
: Check for gas leaks
B
: Check fo oil leaks
EXHAUST MANIFOLD
EM-289
< REMOVAL AND INSTALLATION >
[K9K]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
EXHAUST MANIFOLD
Exploded View
INFOID:0000000010287205
for symbol marks in the figure.
Removal and Installation
INFOID:0000000010282072
REMOVAL
1.
Remove turbocharger assembly. Refer to
EM-287, "Removal and Installation"
2.
Loosen exhaust manifold mounting nuts in the reverse order as
shown. Then remove exhaust manifold.
CAUTION:
Be careful not to deform each turbocharger piping when pulling
out the assembly.
INSTALLATION
1.
Clean the surface of exhaust manifold and cylinder head.
2.
Install new gasket to cylinder head.
1.
Gasket
2.
Exhaust manifold
3.
Exhaust gas temperature sensor 1
4.
Exhaust gas pressure sensor 1
5.
Gasket
A.
To high pressure EGR pipe
E1BIA0886GB
JPBIA3039ZZ
EM-290
< REMOVAL AND INSTALLATION >
[K9K]
EXHAUST MANIFOLD
3.
Tighten the mounting nuts in numerical order as shown.
4.
Install in reverse order of removal after this step.
Inspection
INFOID:0000000010287206
INSPECTION AFTER INSTALLATION
Start engine and raise engine speed to check no exhaust emission leaks.
: 26.0 N·m (2.7 kg-m, 19 ft-lb)
JPBIA3039ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст