Nissan Qashqai J11. Manual — part 764
OIL PAN
TM-631
< REMOVAL AND INSTALLATION >
[CVT: RE0F10G]
C
E
F
G
H
I
J
K
L
M
A
B
TM
N
O
P
Completely wipe out any moisture, oil, and old gasket from the oil pan gasket surface and bolt
hole of oil pan and transaxle case.
2.
Install the oil pan assembly to the transaxle case, and then temporarily tighten the oil pan bolt.
3.
Tighten the oil pan bolts in the order shown to the specified
torque.
4.
Tighten the oil pan bolts again clockwise from (1) shown to the
specified torque.
• Fill with CVT fluid after installation. Refer to
.
Inspection
INFOID:0000000010245689
INSPECTION AFTER REMOVAL
Check oil pan for foreign material.
• If a large amount of worn material is found, clutch plate may be worn.
• If iron powder is found, bearings, gears, or clutch plates may be worn.
• If aluminum powder is found, bushing may be worn, or chips or burrs of aluminum casting parts may enter.
Check points where wear is found in all cases.
INSPECTION AFTER INSTALLATION
Start the engine and check visually that there is no leakage of CVT fluid.
: Vehicle front
JSDIA5211ZZ
TM-632
< REMOVAL AND INSTALLATION >
[CVT: RE0F10G]
INPUT SPEED SENSOR
INPUT SPEED SENSOR
Exploded View
INFOID:0000000010245690
Removal and Installation
INFOID:0000000010245691
REMOVAL
1.
Turn ignition switch OFF.
2.
Remove the battery. Refer to
PG-155, "Removal and Installation"
.
3.
Remove the ECM (TCM) bracket and ECM (TCM). Refer to
TM-625, "Removal and Installation"
4.
Remove the battery mounting bracket assembly and battery mounting bracket. Refer to
5.
Remove the harness bracket mounting nuts (
) and remove
the harness bracket
from the vehicle.
6.
Remove the CVT fluid cooler hose A and CVT fluid cooler hose
B. Refer to
7.
Remove the engine undercover.
8.
Remove the CVT water hose A and CVT water hose B. Refer to
TM-640, "Removal and Installation"
9.
Disconnect the input speed sensor harness connector.
10. Remove the input speed sensor mounting bolt and remove the
input speed sensor.
Transaxle assembly
O-ring
Input speed sensor
: Always replace after every disassembly.
: N·m (kg-m, in-lb)
: Apply CVT fluid
JSDIA5131GB
JSDIA5410ZZ
INPUT SPEED SENSOR
TM-633
< REMOVAL AND INSTALLATION >
[CVT: RE0F10G]
C
E
F
G
H
I
J
K
L
M
A
B
TM
N
O
P
11. Remove the O-ring
from the input speed sensor.
INSTALLATION
Note the followings and installation is in the reverse order of removal.
CAUTION:
• Never reuse O-ring.
• Apply CVT fluid to the O-ring.
Inspection and Adjustment
INFOID:0000000010245692
INSPECTION AFTER INSTALLATION
Start the engine and check visually that there is no leakage of CVT fluid.
ADJUSTMENT AFTER INSTALLATION
Adjust the CVT fluid level. Refer to
.
JSDIA5196ZZ
TM-634
< REMOVAL AND INSTALLATION >
[CVT: RE0F10G]
PRIMARY SPEED SENSOR
PRIMARY SPEED SENSOR
Exploded View
INFOID:0000000010245693
Removal and Installation
INFOID:0000000010245694
REMOVAL
1.
Turn ignition switch OFF.
2.
Remove the Hoodledge splashguard (LH). Refer to
3.
Disconnect the primary speed harness connector.
4.
Remove the primary speed sensor mounting bolt and remove the primary speed sensor.
5.
Remove the O-ring
from the primary speed sensor.
INSTALLATION
Note the followings and installation is in the reverse order of removal.
CAUTION:
• Never reuse O-ring.
• Apply CVT fluid to the O-ring.
Inspection and Adjustment
INFOID:0000000010245695
INSPECTION AFTER INSTALLATION
Transaxle assembly
Primary speed sensor
O-ring
: Always replace after every disassembly.
: N·m (kg-m, in-lb)
: Apply CVT fluid
JSDIA5132GB
JSDIA5199ZZ
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст