Nissan Tiida C11. Manual — part 676
EM-56
< ON-VEHICLE REPAIR >
[HR16DE]
TIMING CHAIN
5.
Check matching mark position of timing chain and each sprocket again.
6.
Install the front oil seal to the front cover. Refer to
EM-78, "FRONT OIL SEAL : Removal and Installation"
7.
Install front cover with the following procedure:
a.
Apply a continuous bead of liquid gasket with tube presser
(commercial service tool) to front cover as shown.
Use Genuine Liquid Gasket or equivalent.
b.
Apply a continuous bead of liquid gasket with suitable tool to
front cover as shown.
Use Genuine Liquid Gasket or equivalent.
1
: Cylinder head
2
: Cylinder block
3
: Oil pan (upper)
A
: Liquid gasket application area
φ
3.0 - 4.0 mm (0.12 - 0.16 in)
PBIC3724E
A
: Liquid gasket application area
φ
3.0 - 4.0 mm (0.12 - 0.16 in)
PBIC3725E
TIMING CHAIN
EM-57
< ON-VEHICLE REPAIR >
[HR16DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
c.
Tighten bolts in the numerical order shown.
d.
After all bolts are tightened, retighten them to specified torque in
numerical order as shown.
CAUTION:
Be sure to wipe off any excessive liquid gasket leaking to
surface.
8.
Insert crankshaft pulley by aligning with crankshaft key.
• When inserting crankshaft pulley with a plastic hammer, tap on its center portion (not circumference).
CAUTION:
Never damage front oil seal lip section.
9.
Tighten crankshaft pulley bolt with the following procedure:
• Secure crankshaft pulley with a suitable tool, and tighten crankshaft pulley bolt.
a.
Apply new engine oil to thread and seat surfaces of crankshaft pulley bolt.
b.
Tighten crankshaft pulley bolt.
c.
Put a paint mark (B) on crankshaft pulley, mating with any one of
six easy to recognize angle marks (A) on crankshaft bolt flange
(1).
d.
Turn another 60 degrees clockwise (angle tightening).
• Check the tightening angle with movement of one angle mark.
10. Make sure that crankshaft turns smoothly by rotating by hand clockwise.
11. Installation is in the reverse order of removal, for the remaining parts.
Inspection
INFOID:0000000001381413
INSPECTION AFTER REMOVAL
Timing Chain
KBIA3429J
: 35.0 N·m (3.6 kg-m, 26 ft-lb)
PBIC3726E
E
M
- 5
8
< ON-VEHICLE REPAIR >
[HR16DE]
TIMING CHAIN
Check for cracks and any excessive wear at link plates and roller
links of timing chain. Replace timing chain as necessary.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
• Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to
MA-19, "Fluids and Lubricants"
.
• Use procedure below to check for fuel leakage.
- Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leak-
age at connection points.
- Start engine. With engine speed increased, check again for fuel leakage at connection points.
• Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness. Noise
will stop after hydraulic pressure rises.
• Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil and
engine coolant.
• Bleed air from lines and hoses of applicable lines, such as in cooling system.
• After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc.
A
: Crack
B
: Wear
JPBIA0091ZZ
Items
Before starting engine
Engine running
After engine stopped
Engine coolant
Level
Leakage
Level
Engine oil
Level
Leakage
Level
Other oils and fluid*
Level
Leakage
Level
Fuel
Leakage
Leakage
Leakage
CAMSHAFT
EM-59
< ON-VEHICLE REPAIR >
[HR16DE]
C
D
E
F
G
H
I
J
K
L
M
A
EM
N
P
O
CAMSHAFT
Exploded View
INFOID:0000000001381414
Removal and Installation
INFOID:0000000001381415
CAUTION:
The rotation direction in the text indicates all directions seen from the engine front.
REMOVAL
1.
Remove front wheel (RH). Refer to
2.
Remove front fender protector (RH). Refer to
EXT-22, "Removal and Installation"
.
3.
Drain engine oil. Refer to
.
CAUTION:
Be sure to perform this step when engine is cold.
4.
Remove the following parts.
• Intake manifold: Refer to
• Drive belt: Refer to
EM-16, "Removal and Installation"
• Water pump pulley: Refer to
• Ground cable (RH)
1.
Camshaft bracket (No. 2 to 5)
2.
Camshaft bracket (No.1)
3.
Camshaft sprocket (EXH)
4.
Camshaft sprocket (INT)
5.
Cylinder head
6.
Oil filter (for intake valve timing control)
7.
Washer
8.
Plug
9.
Intake valve timing control solenoid valve
10. O-ring
11.
O-ring
12. Camshaft position sensor (PHASE)
13. Valve lifter
14.
Camshaft (INT)
15. Camshaft (EXH)
A.
Refer to
PBIC3672E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст