Nissan Murano Z51 (2008 year). Manual — part 82
BRM-32
< REMOVAL AND INSTALLATION >
BODY CONSTRUCTION
BODY CONSTRUCTION
Body Construction
INFOID:0000000003468459
1.
Outer side body
2.
Upper front pillar reinforcement
3.
Upper inner front pillar
4.
Upper front pillar hinge brace
5.
Hoodledge reinforcement
6.
Side dash
7.
Upper dash
8.
Lower dash
9.
Side cowl top brace
JSKIA0575ZZ
Revision: 2008 October
2009 Murano
BODY CONSTRUCTION
BRM-33
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
10. Weld nut
11.
Lower front pillar hinge brace
12. Lower front pillar patch
13. Front fender bracket
14. Outer front sill reinforcement
15. Lower front pillar reinforcement
16. Inner front sill reinforcement
17. Front side member outrigger
18. Front floor
19. Outer sill reinforcement
20. Inner sill
21. Inner rear sill reinforcement
22. 2nd crossmember
23. Center pillar reinforcement
24. Center pillar seat belt reinforcement
25. Inner center pillar reinforcement
26. Inner center pillar
27. 3rd crossmember
28. Seat belt anchor
29. Inner sill extension
30. Inner rear pillar reinforcement
31. Inner rear pillar seat belt anchor
32. Inner rear pillar
33. Outer rear wheelhouse
34. Inner rear wheelhouse
35. Outer back pillar
36. Back pillar reinforcement
37. Rear roof rail brace
38. Back pillar main
Revision: 2008 October
2009 Murano
BRM-34
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
REPLACEMENT OPERATIONS
Description
INFOID:0000000004292763
• This section is prepared for technicians who have attained a high level of skill and experience in repairing
collision-damaged vehicles and also use modern service tools and equipment. Persons unfamiliar with body
repair techniques should not attempt to repair collision-damaged vehicles by using this section.
• Technicians are also encouraged to read the Body Repair Manual (Fundamentals) in order to ensure that the
original functions and quality of the vehicle are maintained. The Body Repair Manual (Fundamentals) con-
tains additional information, including cautions and warnings, that are not including in this manual. Techni-
cians should refer to both manuals to ensure proper repair.
• Please note that this information is prepared for worldwide usage, and as such, certain procedures might not
apply in some regions or countries.
The symbols used in this section for welding operations are shown below.
Symbol marks
Description
2-spot welds
3-spot welds
MIG plug weld
For 3 panels plug weld method
MIG seam weld / Point weld
JSKIA0049ZZ
JSKIA0053ZZ
JSKIA0050ZZ
JSKIA0051ZZ
JSKIA0054ZZ
JSKIA0055ZZ
JSKIA0052ZZ
JSKIA0056ZZ
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-35
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
• Front pillar butt joint can be determined anywhere within shaded
area as shown in the figure. The best location for the butt joint is at
position A due to the construction of the vehicle.
• Determine cutting position and record distance from the locating
indent. Use this distance when cutting the service part. Cut outer
front pillar over 60 mm (2.36 in) above the inner front pillar cut
position.
• Prepare a cutting jig to make outer pillar easier to cut. Also, this will
permit the service part to be accurately cut at the joint position.
• An example of cutting operation using a cutting jig is as per the fol-
lowing.
1.
Mark cutting lines.
A: Cut position of outer pillar
B: Cut position of inner pillar
2.
Align cutting line with notch on jig. Clamp jig to pillar.
3.
Cut outer pillar along groove of jig (at position A).
4.
Remove jig and cut remaining portions.
5.
Cut inner pillar at position B in same manner.
PIIA0150E
JSKIA0104GB
JSKIA0105GB
PIIA0153E
Revision: 2008 October
2009 Murano
BRM-36
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Radiator Core Support
INFOID:0000000003591520
Hoodledge
INFOID:0000000003468468
Work after radiator core support is removed.
: Vehicle front
Replacement parts
z
Side radiator core support (LH)
JSKIA0523ZZ
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-37
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
: Vehicle front
Replacement parts
z
Lower front hoodledge (LH)
z
Lower rear hoodledge (LH)
z
Upper hoodledge (LH)
z
Hoodledge reinforcement (LH)
JSKIA0524ZZ
Revision: 2008 October
2009 Murano
BRM-38
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
View C and D: Before installing hoodledge reinforcement
Hoodledge (Partial Replacement)
INFOID:0000000003468469
Work after radiator core support is removed.
Unit: mm (in)
: Vehicle front
JSKIA0525GB
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-39
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
Front Side Member
INFOID:0000000003468470
Work after radiator core support and hoodledge are removed.
Unit: mm (in)
: vehicle front
Replacement parts
z
Lower front hoodledge (RH)
JSKIA0526GB
Revision: 2008 October
2009 Murano
BRM-40
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Front Side Member (Partial Replacement)
INFOID:0000000003468471
Work after radiator core support and lower front hoodledge are removed.
Unit: mm (in)
: Vehicle front
Replacement parts
z
Front side member assembly (LH)
z
Front side member closing plate as-
sembly (LH)
JSKIA0527GB
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-41
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
Front Pillar
INFOID:0000000003468472
Work after hoodledge reinforcement is removed.
Unit: mm (in)
: Vehicle front
Replacement parts
z
Front side member assembly (RH)
z
Front side member closing plate as-
sembly (RH)
JSKIA0528GB
Revision: 2008 October
2009 Murano
BRM-42
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
1.
Urethane foam
Unit: mm (in)
: Vehicle front
Replacement parts
z
Side body assembly (LH)
z
Side dash (LH)
z
Inner side roof rail (LH)
JSKIA0529GB
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-43
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
View B and F: Before installing outer front side body
View C: Before installing side body assembly
Unit: mm (in)
: Vehicle front
JSKIA0530GB
Revision: 2008 October
2009 Murano
BRM-44
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
Center Pillar
INFOID:0000000003468473
Install the inner center pillar to the side body assembly as shown in the figure for repairing the hidden welding
point
″
View E
″
.
Unit: mm (in)
: Vehicle front
JSKIA0531GB
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-45
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
1.
Urethane foam
Unit: mm (in)
: Vehicle front
Replacement parts
z
Side body assembly (LH)
z
Inner center pillar (LH)
JSKIA0532ZZ
Revision: 2008 October
2009 Murano
BRM-46
< REMOVAL AND INSTALLATION >
REPLACEMENT OPERATIONS
View C: Before installing outer front side body
View E: Inner center pillar and side body assembly (replacement parts)
Unit: mm (in)
: Vehicle front
JSKIA0533GB
Revision: 2008 October
2009 Murano
REPLACEMENT OPERATIONS
BRM-47
< REMOVAL AND INSTALLATION >
C
D
E
F
G
H
I
J
L
M
A
B
BRM
N
O
P
View G: Before installing outer front side body
Outer Sill
INFOID:0000000003468474
Install the lower front pillar reinforcement assembly to the outer sill reinforcement (replacement part) as shown
in the figure for repairing the hidden welding point
″
View A
″
.
Unit: mm (in)
: Vehicle front
JSKIA0534GB
Revision: 2008 October
2009 Murano
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст