Suzuki Grand Vitara JB627. Manual — part 400

9J-1 Hood / Fenders / Doors:

Body, Cab and Accessories

Hood / Fenders / Doors

Repair Instructions

Hood Removal and Installation

S6JB0B9A06001

Removal

CAUTION

!

Place cloth to prevent body from any
damage.

1) Remove hood silencer (4).
2) Disconnect window washer hose (1) from hood.
3) Remove 4 mounting bolts (3) to detach hood (2).

Installation
Reverse removal procedure noting the following.
• Apply sealant to contact face “A” of hood hinge.

“A”: Sealant 99000–31110 (SUZUKI Bond
No.1215)

• Adjust hood lock position if necessary referring to

“Hood Inspection and Adjustment”.

Hood Inspection and Adjustment

S6JB0B9A06002

Inspection
• Check that hood opens and closes smoothly and

properly. Lubricate if necessary.

• Check that hood stops in the secondary latched

position properly (preventing hood from opening
freely) and that hood closes completely in the fully
latched position.

• Adjust hood lock position, if necessary.

Adjustment
Adjust the following point:
• Hood position adjustment.

Fore-and-aft and right-and-left adjustment.
Adjust hood clearance by loosening hood mounting
bolts. Refer to “Panel Clearance in Section 9K”.

• Vertical adjustment

If only one side (right or left) of hood is not level with
front fender, make it level by tightening or loosening
hood cushion (1).

• Hood lock position adjustment

a. Loosen hood lock bolts.
b. Adjust hood lock height position so the hood is

locked without looseness.

c. Tighten hood latch bolts to specified torque.

Tightening torque
Hood latch bolt (a): 10 N·m (1.0 kgf-m, 7.5 lb-
ft)

d. Make sure the hood is locked smoothly and

securely.

4

2

1

3

“A”

“A”

I5JB0A9A0001-01

I5JB0A9A0002-01

(a)

(a)

I5JB0A9A0003-01

Hood / Fenders / Doors: 9J-2

Front Fender Components

S6JB0B9A06003

Front Fender Removal and Installation

S6JB0B9A06004

Removal

1) Remove splash guard (if equipped) referring to “Splash Guard Removal and Installation (If Equipped) in Section

9M”.

2) Remove front fender lining.
3) Remove front bumper referring to “Front Bumper Components in Section 9K”.
4) Remove headlight assembly referring to “Headlight Housing Removal and Installation in Section 9B”.
5) Remove cowl top garnishes referring to “Cowl Top Components in Section 9K”
6) Remove front fender.

Installation
Reverse removal procedure to install front fender noting the following instruction.
• If paint on fender bolt is peeled off, be sure to apply paint again.
• Adjust panel clearance referring to “Panel Clearance in Section 9K”.

1

3

2

4

I6JB019A0001-01

1. Front fender lining

3. Front fender rear pad

2. Front fender

4. Splash guard (if equipped)

9J-3 Hood / Fenders / Doors:

Front Door Assembly Components

S6JB0B9A06005

2

2

1

(a)

4

(a)

4

(a)

5

3

(b)

7

(b)

(b)

7

6

I5JB0A9A0005-01

1. Door panel

4. Front door hinge bolt (body side)

7. Front door hinge bolt (door side)

2. Door hinge

: Apply lithium grease 99000-25010 to rotating part.
: Apply sealant 99000-31110 to contact face.

5. Door open stopper bolt

: 27 N

⋅m (2.7 kgf-m, 19.5 lb-ft)

3. Door open stopper

6. Front door opening weather-strip

: 23 N

⋅m (2.3 kgf-m, 17.0 lb-ft)

Hood / Fenders / Doors: 9J-4

Front Door Assembly Removal and Installation

S6JB0B9A06006

Removal

1) Remove front fender referring to “Front Fender

Components”.

2) Disconnect door harness lead wires at each coupler.
3) Remove door open stopper (1).

4) Support door panel (1) using a jack (2) with rags (3)

and a piece of wood (4) placed between jack (2) and
panel (1) as shown.

5) Remove door assembly (1) by loosening hinge

mounting bolts (2).

Installation
Reverse removal procedure to install door assembly
noting the following instructions.
• When replacing door, coat replacement door inside

with wax for proper anti-corrosion treatment. Refer to
“Sealant Application Areas in Section 9L”.

• Apply sealant to contact face “A” of hinge (1) and

apply grease to rotating part “B” of hinge (1).

“A”: Sealant 99000–31110 (SUZUKI Bond
No.1215)
“B”: Grease 99000–25010 (SUZUKI Super Grease
A)

• Tighten hinge bolt to specified torque.

Tightening torque
Door hinge mounting bolt (body side) (a): 27 N·m
(2.7 kgf-m, 19.5 lb-ft)
Door hinge mounting bolt (door side) (b): 23 N·m
(2.3 kgf-m, 17.0 lb-ft)

• When door open stopper (1) is installed, make sure

punch mark (2) is upward.

Door open stopper installing direction
Left side door: L punch mark is upward
Right side door: R punch mark is upward

• Tighten door open stopper bolt (3) to specified torque.

Tightening torque
Door open stopper bolt (a): 27 N·m (2.7 kgf-m,
19.5 lb-ft)

• Adjust door latch striker position referring to “Front

Door Lock Assembly Removal and Installation in
Section 9F”.

• Adjust front door cushion so that door becomes flush

with side body.

• After installation, open and close the door to check

looseness.

I4RS0A9A0005-01

I2RH019A0003-01

2

1

I5JB0A9A0006-01

1

(a)

(b)

(b)

“A”

“A”

“B”

I5JB0A9A0007-01

I4RS0A9A0008-01

Была ли эта страница вам полезна?
Да!Нет
8 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности