4A–FE engine is an in–line, 4–cylinder, 1.6 liter DOHC 16–valve engine. Manual — part 10
3. INSPECT TENSION SPRING
(a) Measure the free length of tension spring.
Free length: 46.0 mm (1.811 in.)
If the free length is not as specified, replace the tension
spring.
(b) Measure the tension of the tension spring at the
specified installed length.
Installed tension:
32 – 37 N (3.25 – 3.75 kgf, 7.2 – 8.3 lbf)
at 50.5 mm (1.988 in.)
If the installed tension is not as specified, replace the
tension spring.
(e) If there is noticeable wear on the belt teeth, check
the timing cover for damage, correct gasket installa-
tion, and the foreign material on the pulley teeth.
If necessary, replace the timing belt.
(d) If there is wear or damage on only one side of the
belt, check the belt guide and the alignment of each
pulley.
(c) If there is noticeable wear or cracks on the belt face,
check to see if there are nicks on the side of the idler
pulley lock.
2. INSPECT IDLER PULLEYS
Check that the idler pulley turns smoothly.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–74
4. TEMPORARILY INSTALL NO.1 IDLER PULLEY AND
TENSION SPRING
(a) Install the pulley with the bolt. Do not tighten the
bolt yet.
HINT: Use bolt 42 mm (1.65 in.) in length.
(b) Install the tension spring.
(c) Pry the pulley toward the left as far as it will go and
tighten the bolt.
(d) Check that the idler pulley moves smoothly.
INSTALLATION OF TIMING BELT
(See page
EM–67
)
1. INSTALL OIL PUMP PULLEY
(a) Align the cutouts of the pulley and shaft, and slide
on the pulley.
(b) Using SST, install the nut.
SST 09616–30011
Torque:. 28 N–m (290 kgf–cm, 21 ft–lbf)
5. TEMPORARILY INSTALL TIMING BELT
NOTICE: The engine should be cold.
(a) Using the crankshaft pulley bolt, turn the crankshaft
and align the timing marks of the crankshaft
timing pulley and oil pump body.
3. INSTALL NO.2 IDLER PULLEY
(a) Install the pulley with the bolt.
Torque: 42 N–m (425 kgf–cm, 31 ft–lbf)
HINT: Use bolt 35 mm (1.38 in.) in length.
(b) Check that the idler pulley moves smoothly.
2. INSTALL CRANKSHAFT TIMING PULLEY
(a) Align the timing pulley set key with the key groove
of the pulley.
(b) Slide on the timing pulley, facing the flange side
inward.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–75
9. INSTALL CAMSHAFT TIMING PULLEY
(a) Align the camshaft knock pin with the knock pin
groove of the pulley, and slide on the timing pulley.
(b) Using SST, install the plate washer and bolt.
SST 09249–63010 and 09278–54012
Torque: 54 N–m (550 kgf–cm, 40 ft–lbf)
37 N–m (380 kgf–cm, 27 ft–lbf) for SST
HINT: Use a torque wrench with a fulcrum length of
340 mm (13.39 in.)
(b) Remove any oil or water on the crankshaft pulley, oil
pump pulley, water pump pulley, No.1 idler pulley,
No.2 idler pulley, and keep them clean.
(c) Install the timing belt on the crankshaft timing pulley,
oil pump pulley, No.1 idler pulley, water pump
pulley and No.2 idler pulley.
HINT (When re–using timing belt): Align the points
marked during removal, and install the belt with the ar-
row pointing in the direction of engine revolution.
8. INSTALL CRANKSHAFT PULLEY
(a) Align the pulley set key with the key groove of the
pulley, and slide on the pulley.
(b) Using SST, install the pulley bolt.
SST 09213–54015 (09214–00030) and
09330–00021
Torque: 108 N–m (1,100 kgf–cm, 80 ft–lbf)
7. INSTALL NO.1 TIMING BELT COVER
(a) Install the gasket to the timing belt cover.
(b) Install the timing belt cover with the four bolts.
6. INSTALL TIMING BELT GUIDE
Install the guide, facing the cup side outward.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–76
11. INSTALL TIMING BELT
HINT (When re–using timing belt):
•
Check that the matchmark on the timing belt matches
the end of the No.1 timing belt cover.
If the matchmark does not align, shift the meshing of the
timing belt and crankshaft timing pulley until they align.
(See page
EM–71
)
(a) Remove any oil or water on the camshaft timing
pulley, and keep it clean.
(b) Install the timing belt, and checking the tension
between the crankshaft timing pulley and camshaft
timing pulley.
(b) Using SST, turn the camshaft, and align the hole of
the camshaft timing pulley with the timing mark of
the bearing cap.
SST 09278–54012
10. SET NO.1 CYLINDER–TO TDC/COMPRESSION
(a) Turn the crankshaft pulley, and align its groove with
timing mark ”0” of the No.1 timing belt cover.
•
Align the matchmarks of the timing belt and camshaft
timing pulley.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–77
(d) Slowly turn the crankshaft pulley 1 7/8 revolutions,
and align its groove with the mark at BTDC 45
В°
(for
No.1 cylinder) of the No.1 timing belt cover.
NOTICE: Always turn the crankshaft clockwise.
(c) Check that each pulley aligns with the timing marks
as shown in the illustration.
If the timing marks do not align, remove the timing belt
and reinstall it.
(e) Torque the mounting bolt of the No.1 idler pulley.
Torque: 42 N–m (425 kgf–cm, 31 ft–lbf)
(f) Recheck the valve timing.
(b) Slowly turn the crankshaft pulley two revolutions
from TDC to TDC.
NOTICE: Always turn the crankshaft clockwise.
12. CHECK VALVE TIMING
(a) Loosen the No.1 idler pulley bolt 1 /2 turn.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–78
17. INSTALL RH ENGINE MOUNTING INSULATOR
Install the mounting insulator with the through bolt and
two nuts.
Torque:
Nut
52 N–m (530 kgf–cm, 38 ft–lbf)
Through bolt
87 N–m (890 kgf–cm, 64 ft–lbf)
18. INSTALL PS RESERVOIR TANK TO BRACKET
13. INSTALL NO.2 TIMING BELT COVER
(a) Disconnect the engine Wire protector between the
No.3 timing belt cover and cylinder head cover.
(b) Install the two gaskets to the No.1 and No.2 belt
covers.
(c) Install the belt cover with the five bolts.
14. INSTALL ENGINE WIRE TO ALTERNATOR BRACKET
AND ADJUSTING BAR
Install the engine wire with the two bolts.
15. INSTALL SPARK PLUGS
Torque: 18 N–m (180 kgf–cm, 13 ft–lbf)
16. INSTALL RH ENGINE MOUNTING BRACKET
Install the bracket with the three bolts.
Torque: 52 N–m (530 kgf–cm, 38 ft–lbf)
(d) Install the two clamps of the engine wire protector
to each bolt.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–79
22. INSTALL ALTERNATOR (See page
CH–25
)
23. (w/ CRUISE CONTROL SYSTEM (w/o ABS)
INSTALL CRUISE CONTROL ACTUATOR
(See step 33 on page
EM–309
)
24. INSTALL RH FRONT WHEEL
25. CONNECT CABLE TO NEGATIVE TERMINAL OF
BATTERY
26. CHECK AND ADJUST DRIVE BELTS
Adjust the drive belts.
Drive belt tension:
Alternator
w/ A/C
New belt 165
В±
10 lbf
Used belt 110
В±
10 lbf
w/o A/C
New belt 125
В±
25 lbf
Used belt 95
В±
20 lbf
PS pump
New belt 125
В±
10 lbf
Used belt 80
В±
20 lbf
27. INSTALL RH ENGINE UNDER COVER
19. INSTALL RH ENGINE MOUNTING STAY
Install the mounting stay with the bolt and nut.
Torque: 73 N–m (740 kgf–cm, 54 ft–lbf)
20. CONNECT GROUND CONNECTOR TO GROUND WIRE
ON RH FENDER APRON
21. INSTALL PS DRIVE BELT
Install the drive belt with the pivot bolt and adjusting
bolt.
–
ENGINE MECHANICAL
Timing Belt (5S–FE)
EM–80
CYLINDER HEAD (4A–FE)
COMPONENTS
–
ENGINE MECHANICAL
Cylinder Head (4A–FE)
EM–81
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст