Toyota Tundra. Manual — part 1900
5
INSTALL NO. 2 AIR TUBE (See INSTALLATION )
6
INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH (See INSTALLATION )
7
INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR (See INSTALLATION )
8
INSTALL NO. 3 AIR TUBE (See INSTALLATION )
9
INSTALL ENGINE ASSEMBLY
a
Slowly lower the engine assembly into the engine compartment
b
Attach the engine mounting insulators to the vehicle
c
Install the 4 engine mounting insulator's bolts
Torque: 79 N*m (806 kgf*cm, 58 ft.*lbf)
Fig. 362: Locating Engine Mounting Insulator Bolts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
10
INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
a
Using SST, hold the crankshaft
SST 09213-70011 (09213-70020), 09330-00021
b
Install the front drive plate spacer, drive plate and rear drive plate spacer on the crankshaft
NOTE:
Make sure that the engine is clear of all wiring and hoses.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Fig. 363: Holding Crankshaft Using SST
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
c
Install and uniformly tighten 8 new bolts in the sequence shown below
Torque: 30 N*m (306 kgf*cm, 22 ft.*lbf)
d
Mark the upside of each flywheel installation bolt with paint
e
Retighten the flywheel installation bolts by 90° as shown below
f
Check that the painted marks are now at a 90° angle to the upside
NOTE:
Do not reuse the flywheel installation bolts.
Do not impact or damage the flywheel installation bolts. Be sure
to handle them carefully.
Fig. 364: Identifying Flywheel Installation Bolt Tightening
Sequence
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Fig. 365: Locating Flywheel Installation Bolts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
11
INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
a
for 2WD, refer to the following procedures (see INSTALLATION )
b
for 4WD, refer to the following procedures (see INSTALLATION )
12
INSTALL PROPELLER SHAFT ASSEMBLY
a
for 2 joint type, refer to the following procedures (see )
b
for 3 joint type, refer to the following procedures (see )
13
INSTALL EXHAUST PIPE ASSEMBLY
a
for Regular cab standard deck, refer to the following procedures (see INSTALLATION )
b
except Regular cab standard deck, refer to the following procedures (see INSTALLATION )
14
INSTALL NO. 1 WATER BY-PASS PIPE
a
Install the water by-pass pipe with the 2 bolts
15
INSTALL GENERATOR ASSEMBLY (See INSTALLATION )
16
CONNECT VANE PUMP ASSEMBLY (See INSTALLATION )
17
CONNECT COOLER COMPRESSOR ASSEMBLY (See INSTALLATION )
Fig. 366: Locating Water By-Pass Pipe With Bolts
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
18
CONNECT WIRE HARNESS AND HOSE
a
Connect the 3 connectors to the engine room junction block
b
Install the engine wire with the nut
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
c
Connect the 4 air injection control driver connectors
d
Install the ground wire with the bolt
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
e
Connect the positive (+) battery terminal and install the engine wire with the nut
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
Fig. 367: Locating Air Injection Control Driver Connectors
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
f
Connect the air injection system hose
g
Install the ground wire with the bolt
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
h
Connect the air pump connector and install the connector bracket with the bolt
Torque: 4.0 N*m (41 kgf*cm, 35 in.*lbf)
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст