Toyota Tundra. Manual — part 1916
2
Install the 4 rear engine mounting insulator bolts
Torque: 16 N*m (163 kgf*cm, 12 ft.*lbf)
Fig. 463: Locating Rear Engine Mounting Insulator Bolts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (2UZ-FE) - Tundra
2009 ENGINE
Engine Mechanical (3UR-FBE) - Tundra
ENGINE
ON-VEHICLE INSPECTION
1
INSPECT IGNITION TIMING
a
Warm up and stop the engine
1
Allow the engine to warm up to a normal operating temperature
b
When using the Techstream:
1
Connect the Techstream to the DLC3
2
Start the engine and idle it
3
Turn the Techstream main switch ON
4
Enter the following menus: Powertrain/Engine and ECT/Data List/Primary/IGN Advance
HINT:
Refer to the Techstream operator's manual for further details
Standard ignition timing:
8 to 12° BTDC @ idle (transmission in neutral and A/C switch OFF)
5
Disconnect the Techstream from the DLC3
c
When not using the Techstream:
1
Connect the tester probe of a timing light to the wire of the ignition coil connector for the No
1 cylinder
Fig. 1: Connecting Tester Probe Of Timing Light To Wire Of Ignition Coil Connector
For No. 1 Cylinder
NOTE:
Use a timing light that detects primary signals.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FBE) - Tundra
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FBE) - Tundra
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2
Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3
SST 09843-18040
3
Using the timing light, check the ignition timing
Standard ignition timing:
8 to 12° BTDC @ idle (transmission in neutral and A/C switch OFF)
4
Remove SST from the DLC3
5
Check the ignition timing
Standard ignition timing:
7 to 24° BTDC @ idle (transmission in neutral and A/C switch OFF)
NOTE:
Confirm the terminal numbers before connecting them.
Connecting the wrong terminals can damage the engine.
Switch off all accessories and the A/C before connecting
the terminals.
Fig. 2: Identifying DLC3 Connector Terminals
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FBE) - Tundra
Fig. 3: Checking Ignition Timing
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
6
Disconnect the timing light from the engine
2
INSPECT ENGINE IDLE SPEED
a
Warm up and stop the engine
1
Allow the engine to warm up to a normal operating temperature
b
When using the Techstream:
1
Connect the Techstream to the DLC3
2
Race the engine at 2500 RPM for approximately 90 seconds
3
Turn the Techstream main switch ON
4
Enter the following menus: Powertrain/Engine and ECT/Data List/Primary/Engine Speed
Standard idle speed:
650 to 750 RPM (transmission in neutral and A/C switch OFF)
HINT:
Refer to the Techstream operator's manual for further details
If the idle speed is not as specified, check the air intake system
5
Disconnect the Techstream from the DLC3
c
When not using the Techstream:
1
Using SST, connect the tachometer probe to terminal 9 (TAC) of the DLC3
SST 09843-18030
NOTE:
Switch off all accessories and the A/C before connecting the
Techstream.
NOTE:
Confirm the terminal number before connecting the probe.
2009 Toyota Tundra
2009 ENGINE Engine Mechanical (3UR-FBE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст