Toyota Tundra. Manual — part 1084
Fig. 37: Locating End Cover With Nuts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
6. INSTALL GENERATOR PULLEY
SST 09820-63011 (09820-06010, 09820-06020)
HINT:
GENERATOR PULLEY SPECIAL SERVICE TOOL
Fig. 38: Removing/Installing Generator Pulley
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
a. Install the pulley onto the rotor shaft by tightening the pulley nut by hand.
b. Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf)
c. Mount SST 2 in a vise.
d. Insert SST 1-A and B into SST 2, and attach the pulley nut to SST 2.
SST 1-A and B 09820-06010
SST 2
09820-06020
NOTE:
Check that SST is secured to the rotor shaft.
2009 Toyota Tundra
2009 ELECTRICAL Charging (2UZ-FE) - Tundra
Fig. 39: Inserting 1-A And B Into SST 2
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
e. Tighten the pulley nut by turning SST 1-A in the direction shown in the illustration.
Torque: 133 N*m (1356 kgf*cm, 98 ft.*lbf)
Fig. 40: Turning SST 1-A
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
f. Remove the generator from SST 2.
g. Turn SST 1-B, and remove SST 1-A and B.
Fig. 41: Turning SST 1-B
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
h. Turn the pulley and check that the pulley moves smoothly.
2009 Toyota Tundra
2009 ELECTRICAL Charging (2UZ-FE) - Tundra
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
a. Install the generator with the bolt and 2 nuts.
Torque: for bolt and nut (A)
39 N*m (398 kgf*cm, 29 ft.*lbf)
for nut (B)
16 N*m (163 kgf*cm, 12 ft.*lbf)
Fig. 42: Identifying Generator With Bolt And Nuts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
b. Connect the generator connector.
c. Connect the generator wire with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
d. Install the terminal cap.
e. Install the harness bracket to the generator with the bolt.
Fig. 43: Identifying Generator Connector With Bolts
Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.
2009 Toyota Tundra
2009 ELECTRICAL Charging (2UZ-FE) - Tundra
Torque: 8.2 N*m (84 kgf*cm, 73 in.*lbf)
2. INSTALL VANE PUMP ASSEMBLY INSTALLATION
3. INSTALL FAN AND GENERATOR V BELT INSTALLATION
4. CONNECT AIR CLEANER HOSE ASSEMBLY
a. Connect the air cleaner hose to the throttle body.
5. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY INSTALLATION
6. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY REPLACEMENT
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE:
Some systems need to be initialized after the cable is reconnected
INITIALIZATION
2009 Toyota Tundra
2009 ELECTRICAL Charging (2UZ-FE) - Tundra
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст