Toyota Tundra (2015 year). Manual — part 1356
Torque:
6.0 N·m {61 kgf·cm, 53in·lbf}
(i) Connect the 2 clamps and air pump connector.
(j) Connect the clamp and ground wire with the bolt.
Torque:
8.0 N·m {82 kgf·cm, 71in·lbf}
(k) Connect the 4 connectors to the connector holder block.
(l) Connect the 2 heater hoses.
(m) Connect the No. 4 water by-pass hose.
(n) Connect the ECM connector and clamp.
HINT:
Refer to the following procedures to connect the ECM connector
.
23. CONNECT NO. 2 FUEL TUBE SUB-ASSEMBLY
(a) Connect the No. 2 fuel tube
.
1UR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALL...
24. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY
(a) Connect the No. 1 fuel pipe
.
(b) Install the fuel pipe clamp.
25. INSTALL INTAKE MANIFOLD
26. INSTALL AIR TUBE SUB-ASSEMBLY LH
27. INSTALL VENTILATION HOSE ASSEMBLY
28. INSTALL EGR VALVE BRACKET
29. INSTALL EGR VALVE ASSEMBLY
30. CONNECT NO. 13 WATER BY-PASS HOSE
31. CONNECT NO. 12 WATER BY-PASS HOSE
32. INSTALL RADIATOR ASSEMBLY
33. INSTALL FAN SHROUD
34. INSTALL FAN AND GENERATOR V BELT
35. INSTALL RADIATOR SIDE DEFLECTOR LH
36. INSTALL RADIATOR SIDE DEFLECTOR RH
37. INSTALL RADIATOR GRILLE SUB-ASSEMBLY
38. CONNECT OUTLET RADIATOR HOSE
39. INSTALL INLET RADIATOR HOSE
40. INSTALL FRONT FENDER APRON SEAL REAR LH
41. INSTALL FRONT FENDER APRON SEAL LH
42. INSTALL FRONT FENDER APRON SEAL REAR RH
43. INSTALL FRONT FENDER APRON SEAL RH
44. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY
45. INSTALL AIR CLEANER ASSEMBLY
1UR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALL...
(a) Install the air cleaner case with the 2 bolts.
Torque:
5.0 N·m {51 kgf·cm, 44in·lbf}
(b) Install the air cleaner element to the air cleaner case.
(c) Install the air cleaner cap.
(1) for Type A:
Install the air cleaner cap and fasten the 4 hook clamps.
(2) for Type B:
Install the air cleaner cap and fasten the 2 hook clamps.
(3) Connect the MAF meter connector.
(4) Attach the wire harness clamp.
46. INSTALL AIR CLEANER HOSE ASSEMBLY
(a) Install the air cleaner hose with the 2 clamps.
Torque:
4.0 N·m {41 kgf·cm, 35in·lbf}
1UR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALL...
(b) Connect the ventilation hose and vacuum sensing hose.
47. ADD ENGINE OIL
48. ADD ENGINE COOLANT
49. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
50. INSPECT FOR OIL LEAK
51. INSPECT FOR COOLANT LEAK
52. INSPECT FOR EXHAUST GAS LEAK
53. INSPECT FOR FUEL LEAK
54. INSPECT SHIFT LEVER POSITION
(a) for Column Shift:
Refer to the following procedures
.
(b) for Floor Shift:
Refer to the following procedures
.
55. INSTALL V-BANK COVER SUB-ASSEMBLY
(a) Attach the 2 V-bank cover hooks to the bracket. Then align the
2 V-bank cover grommets with the 2 pins, and press down on
the V-bank cover to attach the pins.
56. INSTALL HOOD SUB-ASSEMBLY
1UR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALL...
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст