Toyota Tundra (2015 year). Manual — part 1417

(b) Install the water inlet housing with the 3 bolts.

Torque:

21 N·m {214 kgf·cm, 15ft·lbf}

17. CONNECT NO. 5 WATER BY-PASS HOSE

18. CONNECT NO. 8 WATER BY-PASS HOSE

19. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY

(a) Connect the No. 2 water by-pass hose to the water by-pass pipe sub-assembly, and slide the clamp to

secure the hose.

(b) Install the water by-pass pipe sub-assembly to the cylinder head cover sub-assembly RH with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7ft·lbf}

20. INSTALL AIR TUBE SUB-ASSEMBLY RH

(a) Install the air tube sub-assembly RH to the cylinder head cover sub-assembly RH with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7ft·lbf}

21. INSTALL NO. 1 WATER BY-PASS HOSE

22. INSTALL NO. 3 ENGINE COVER

23. INSTALL NO. 4 ENGINE COVER

24. INSTALL GENERATOR ASSEMBLY

25. CONNECT VANE PUMP ASSEMBLY

(a) Connect the vane pump assembly to the timing chain cover

sub-assembly with the 2 bolts.

Torque:

28 N·m {286 kgf·cm, 21ft·lbf}

Text in Illustration

*a

Spacer

HINT:

Before performing the following procedures, move the spacer

until the vane pump assembly can be installed.

26. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

27. INSTALL OIL FILTER BRACKET

(c) Install the oil filter bracket to the timing chain cover sub-assembly with the 2 nuts and 2 bolts.

Torque:

35 N·m {357 kgf·cm, 26ft·lbf}

1UR-FE LUBRICATION: OIL PUMP: INSTALLATION; 2015 MY Tun...

28. INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY

29. INSTALL OIL FILTER ELEMENT

30. CONNECT COOLER COMPRESSOR ASSEMBLY

(a) Connect the cooler compressor assembly with the 2 stud bolts.

Torque:

10 N·m {102 kgf·cm, 7ft·lbf}

(b) Install the 2 bolts and 2 nuts.

Torque:

25 N·m {250 kgf·cm, 18ft·lbf}

NOTICE:

Tighten the bolts and nuts in the order shown in the illustration to connect the cooler compressor

assembly.

31. CONNECT HEATER HOSE AND NO. 1 WATER BY-PASS PIPE

(a) Connect the No. 1 water by-pass pipe with the 2 bolts to the cylinder head cover sub-assembly RH.

Torque:

18 N·m {184 kgf·cm, 13ft·lbf}

(b) Connect the heater hose to the water by-pass pipe sub-assembly, and slide the clamp to secure the hose.

32. CONNECT NO. 3 AIR INJECTION SYSTEM HOSE

(a) Connect the No. 3 air injection system hose to the air tube sub-assembly RH, and slide the clamp to

secure the hose.

33. CONNECT ENGINE WIRE

(a) Connect the wire harness clamp bracket to the timing chain cover sub-assembly with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71in·lbf}

(b) Engine Room RH Side:

(1) Connect the 9 clamps.

(2) Connect the 2 air pump connectors.

(3) Install the ground wire RH with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71in·lbf}

(4) Connect the noise filter connector.

(5) Connect the 2 VVT sensor connectors.

(6) Connect the injector connector.

(7) Connect the 4 ignition coil connectors.

1UR-FE LUBRICATION: OIL PUMP: INSTALLATION; 2015 MY Tun...

(8) Connect the 2 camshaft timing oil control valve connectors.

(9) Connect the power steering oil pressure switch connector and solenoid valve connector.

(10) for 4WD:

Connect the clamp and junction connector.

(c) Engine Room LH Side:

(1) Connect the cooler compressor connector.

(2) Connect the 6 clamps.

(3) Connect the camshaft position sensor connector.

(4) Connect the 2 camshaft timing oil control valve connectors.

(5) Connect the engine coolant temperature sensor connector.

(6) Install the ground wire LH with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71in·lbf}

(7) Connect the noise filter connector.

(8) Connect the 2 VVT sensor connectors.

(9) Connect the 4 ignition coil connectors.

(10) Connect the injector connector.

(11) Connect the 2 wire harness clamps.

(12) Connect the 4 air injection control driver connectors.

(13) Connect the 2 connectors and attach the 2 clamps to the engine room junction block.

(14) Install the engine room relay block cover.

34. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2)

35. CONNECT NO. 1 AIR HOSE

36. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)

37. INSTALL INTAKE MANIFOLD

38. INSTALL RADIATOR ASSEMBLY

39. ADD ENGINE OIL

40. ADD ENGINE COOLANT

41. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

42. INSPECT FOR OIL LEAK

43. INSPECT FOR COOLANT LEAK

44. CHECK ENGINE OIL LEVEL

1UR-FE LUBRICATION: OIL PUMP: INSTALLATION; 2015 MY Tun...

Last Modified: 9-16-2014

6.6 G

Doc ID: RM000002ZMY014X

Model Year: 2015

Model: Tundra

Prod Date Range: [08/2014 - ]

Title: 1UR-FE STARTING: ACC CUT RELAY: ON-VEHICLE INSPECTION; 2015 MY Tundra [08/2014 - ]

ON-VEHICLE INSPECTION

1. REMOVE ACC CUT RELAY

(a) Remove the clip.

(b) Detach the 2 clips and remove the cowl side trim board RH.

(c) Remove the relay.

2. INSPECT ACC CUT RELAY

(a) Measure the resistance according to the value(s) in the table

below.

Standard Resistance:

TESTER

CONNECTION

CONDITION

SPECIFIED

CONDITION

3 - 4

When battery voltage is not

applied to terminals 1 and 2

Below 1 Ω

When battery voltage is applied

to terminals 1 and 2

10 kΩ or higher

If the result is not as specified, replace the relay.

3. INSTALL ACC CUT RELAY

(a) Install the relay.

(b) Attach the 2 clips to install the cowl side trim board RH.

(c) Install the clip.

1UR-FE STARTING: ACC CUT RELAY: ON-VEHICLE INSPECTION...

Была ли эта страница вам полезна?
Да!Нет
4 посетителя считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности