Toyota FJ Cruiser (GSJ 10, 15 series). Instruction — part 370
PS–30
POWER STEERING – POWER STEERING LINK (for 2WD)
PS
INSTALLATION
1.
INSTALL POWER STEERING LINK
(a) Install the power steering link with the 2 bolts and 2
nuts.
Torque: 100 N*m (1,020 kgf*cm, 74 ft.*lbf)
NOTICE:
Never turn the nut since it has a detent. Be sure
to turn only the bolt.
2.
INSTALL PRESSURE FEED TUBE ASSEMBLY
(a) Connect the return hose with the clip.
(b) Using SST, tighten the flare nut and connect the
pressure feed tube.
SST
09023-12701
Torque: for use without SST
44 N*m (449 kgf*cm, 33 ft.*lbf)
for use with SST
42 N*m (420 kgf*cm, 31 ft.*lbf)
HINT:
•
Use a torque wrench with a fulcrum length of 300
mm (11.81 in.).
•
This torque value is effective when SST is
parallel to the torque wrench.
(c) Install the tube support brackets with the 2 bolts.
Torque: 28 N*m (286 kgf*cm, 21 ft.*lbf)
F051684E01
F051683E01
Fulcrum Length
SST
F051698E01
F051681E01
POWER STEERING – POWER STEERING LINK (for 2WD)
PS–31
PS
3.
INSTALL COOLER COMPRESSOR ASSEMBLY
(a) Install the cooler compressor and magnetic clutch
with the 4 bolts.
4.
INSTALL TIE ROD END SUB-ASSEMBLY LH
(a) Install the tie rod end onto the steering knuckle arm.
(b) Install the nut.
Torque: 91 N*m (928 kgf*cm, 67 ft.*lbf)
(c) Install a new cotter pin.
5.
INSTALL TIE ROD END SUB-ASSEMBLY RH
HINT:
The installation procedure for the RH side is the same as
that for the LH side.
6.
INSTALL NO. 2 STEERING INTERMEDIATE SHAFT
(a) Align the matchmarks on the No. 2 steering
intermediate shaft and power steering link.
(b) Install the No. 2 steering intermediate shaft onto the
power steering link with bolt C.
Torque: 36 N*m (367 kgf*cm, 27 ft.*lbf)
(c) Align the matchmarks on the steering intermediate
shaft and steering sliding yoke.
(d) Install the steering sliding yoke onto the steering
intermediate shaft and slide it upward.
(e) Align the matchmarks on the steering sliding yoke
and No. 2 steering intermediate shaft.
(f)
Install the steering sliding yoke with bolts A and B.
Torque: 36 N*m (367 kgf*cm, 27 ft.*lbf)
7.
REMOVE FAN AND GENERATOR V BELT (See page
8.
INSTALL FRONT WHEELS
Torque: 113 N*m (1,152 kgf*cm, 83 ft.*lbf)
9.
PLACE FRONT WHEELS FACING STRAIGHT AHEAD
10. INSPECT STEERING WHEEL CENTER POINT
11. CONNECT CABLE TO NEGATIVE BATTERY
TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
12. ADD POWER STEERING FLUID
13. BLEED POWER STEERING FLUID (See page
)
14. CHECK FOR POWER STEERING FLUID LEAKAGE
15. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
(See page
16. INSTALL NO. 1 ENGINE UNDER COVER SUB-
ASSEMBLY (See page
)
C133811
Matchmarks
C
F051678E02
A
B
Matchmarks
F051677E01
PS–32
POWER STEERING – POWER STEERING LINK (for 4WD)
PS
STEERING
POWER STEERING
POWER STEERING LINK (for 4WD)
COMPONENTS
REAR ENGINE UNDER
COVER ASSEMBLY
FRONT EXHAUST PIPE ASSEMBLY
NO. 1 ENGINE UNDER
COVER SUB-ASSEMBLY
N*m (kgf*cm, ft*lbf) :Specified torque
Non-reusable part
29 (296, 21)
54 (554, 40)
48 (489, 35)
43 (438, 32)
x4
x4
GASKET
GASKET
GASKET
GASKET
COMPRESSION SPRING
COMPRESSION SPRING
x2
x2
43 (438, 32)
54 (554, 40)
29 (296, 21)
x2
NO. 2 FRONT EXHAUST PIPE ASSEMBLY
C133785E01
POWER STEERING – POWER STEERING LINK (for 4WD)
PS–33
PS
NO.3 FRAME CROSSMEMBER
SUB-ASSEMBLY
EXHAUST PIPE STOPPER BRACKET
FRONT PROPELLER
SHAFT ASSEMBLY
PROPELLER SHAFT ASSEMBLY
PROPELLER SHAFT
HEAT INSULATOR
N*m (kgf*cm, ft*lbf) :Specified torque
88 (899, 65)
19 (194, 14)
40 (408, 30)
88 (899, 65)
88 (899, 65)
88 (899, 65)
x4
x4
x4
x4
x2
x2
x2
16 (160, 12)
40 (408, 30)
FRONT SUSPENSION
MEMBER BRACKET
FRONT SUSPENSION
MEMBER BRACKET LH
33 (336, 24)
x4
x4
33 (336, 24)
C137987E01
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст