Ford Ranger EV (2001 year). Manual — part 172

414-03B-84

414-03B-84

High Voltage/Traction Battery — Nickel Metal Hydride

GENERAL PROCEDURES (Continued)

13. Connect the Traction Battery High-Voltage

Service Cord to the traction battery auxiliary
load high-voltage connector on the traction
battery.

14. Connect the Traction Battery Low-Voltage

Service Cord to the 76-pin low-voltage
connector on the traction battery.

Loosely install the bolt.

15. Connect the Traction Battery Low-Voltage

Service Cord to the 76-pin low-voltage
connector on the vehicle.

Loosely install the bolt.

16. Charge the traction battery to a full state of

charge (SOC). Refer to

Section 100-05

.

414-03B-85

414-03B-85

High Voltage/Traction Battery — Nickel Metal Hydride

GENERAL PROCEDURES (Continued)

17. After charging has been completed, press the

button to deactivate the power control station
(PCS).

18. Disconnect the PCS from the charger inlet

connector.
1 Press and hold the release button.
2 Lift and disconnect the PCS from the

charger inlet connector.

19. Close the charge inlet access door.

20. Enter the indicated data on the Dealer Battery

Return Form that is packaged with the new
battery module.

21. Remove the In-Line Bypass Battery Module(s)

and replace it with a freshly charged battery
module(s). Assembly the traction battery. Check
the specific battery module number procedure
for specific removal information. The battery
modules are grouped as follows: 2-6; 1, 7, 8,
9, 25; 10, 11, 12, 23, 24; 13-15; 16, 19, 20, 22;
and 17, 18, 21. Refer to the specific Traction
Battery Module procedure.

414-03B-86

414-03B-86

High Voltage/Traction Battery — Nickel Metal Hydride

GENERAL PROCEDURES (Continued)

22. Connect New Generation STAR (NGS) Tester

to the vehicle.

23. Remove the NGS Tester and charge the traction

battery to full SOC. Refer to

Section 100-05

.

24. Perform Battery Pack/Module Verification Test.

Refer to Diagnosis and Testing for Traction
Battery System in this section.

25. Disconnect the Traction Battery High-Voltage

Service Cord from the auxiliary load
high-voltage connector on the vehicle.

26. Disconnect the Traction Battery High-Voltage

Service Cord from the traction battery auxiliary
load high-voltage connector on the traction
battery.

27. Disconnect the Traction Battery Low-Voltage

Service Cord from the 76-pin low-voltage
connector on the traction battery.

414-03B-87

414-03B-87

High Voltage/Traction Battery — Nickel Metal Hydride

GENERAL PROCEDURES (Continued)

28. Disconnect the Traction Battery Low-Voltage

Service Cord from the 76-pin low-voltage
connector on the vehicle.

29. Apply Locktite 242 (threadlock and sealer) to

the 22 traction battery cover bolts.

30. Install the traction battery cover.

Install the 22 bolts.

31. Remove the Traction Battery High-Voltage

Lockout and Diagnostic Tool.

32. Install the traction battery. Refer to

Traction

Battery

.

Была ли эта страница вам полезна?
Да!Нет
6 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности