Ford Falcon. Manual — part 267
308-03a-30
Manual Transmission — I6
308-03a-30
DISASSEMBLY AND ASSEMBLY OF SUBASSEMBLIES (Continued)
10. Remove ball using a pencil magnet.
7. Remove output shaft rear bearing.
NOTE: There is a snug fit between the sleeve and
the output shaft.
11. Remove three-piece first gear synchronizer
blocking ring assembly from output shaft.
8. Remove first gear.
12. Remove second gear snap ring and thrust
washer.
9. Remove needle bearing assembly and sleeve.
G34523 en
308-03a-31
Manual Transmission — I6
308-03a-31
DISASSEMBLY AND ASSEMBLY OF SUBASSEMBLIES (Continued)
16. Remove spiral snap ring and thrust washer from
13. Remove second gear from output shaft.
output shaft.
14. Remove second gear needle bearing assembly
17. Remove three-piece second gear synchronizer
and spacer.
blocking ring assembly.
Remove 1st/2nd synchronizer from output shaft.
15. Disengage spiral snap ring from slot in output
shaft using a small screwdriver.
Assembly
1. Install 1st/2nd synchronizer assembly, and
three-piece 2nd gear synchronizer blocking ring
assembly onto output shaft.
NOTE: Align slots in synchronizer blocking ring
with tabs in 1st/2nd synchronizer.
For synchronizer assembly, refer to Synchronizer
Disassembly and Assembly.
G34523 en
308-03a-32
Manual Transmission — I6
308-03a-32
DISASSEMBLY AND ASSEMBLY OF SUBASSEMBLIES (Continued)
2. Install thrust washer onto output shaft. Install
5. Install second gear thrust washer and snap ring
spiral snap ring using Spiral Snap Ring Replacer.
using snap ring pliers.
3. Install second gear needle bearing and spacer.
6. Install three-piece first gear synchronizer blocking
ring assembly onto output shaft.
NOTE: Align slot in first gear synchronizer
blocking ring with tab on 1st/2nd synchronizer.
4. Install second gear onto output shaft.
NOTE: Align slots in second gear with tabs on
synchronizer blocking ring assembly.
7. Drop ball into output shaft.
NOTE: Use pencil magnet if necessary.
G34523 en
308-03a-33
Manual Transmission — I6
308-03a-33
DISASSEMBLY AND ASSEMBLY OF SUBASSEMBLIES (Continued)
8. While aligning notch in sleeve with ball, slide
11. Lubricate fifth gear splines with petroleum jelly
sleeve onto output shaft. Install needle bearing
and position on output shaft. Using a press and a
assembly over sleeve.
capped length of pipe, 31.75mm ID x 356mm (1 1
/4 inch ID x 14 inch) press fifth gear onto output
shaft.
9. Install first gear onto output shaft.
NOTE: Align slots in first gear with tabs on first
gear synchronizer blocking ring assembly.
12. Using snap ring pliers, install fifth gear snap ring.
10. Install rear output shaft bearing onto output shaft.
The bearing taper must face the rear of the shaft.
CAUTION: Ensure the output shaft and gear
splines are carefully aligned. If splines are
improperly aligned, damage could occur when the
gear is pressed onto the output shaft.
G34523 en
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст