Chery QQ6 (Body Accessories and Dimensions). Service Manual — part 5
65
II. Removal of Instrument
Panel
1.
Disassembly/Reassembly
of
Instrument Panel
1.1. Removal Step
1.1.1. Remove the steering wheel and
combination switch (see Remova of Steering
Wheel).
1.1.2 Remove glove box (Refer to Removal of
glove box)
1.1.3. Remove the console panel, audio unit,
emergency switch, A/C control switch, ashtray,
console (refer to Disassembly/Reassembly and
Removal of Console Panel, Audio Unit,
Emergency Switch, A/C Control Switch,
Ashtray).
1.1.4 Disassemble combined instrument (Refer
to Disassembly of Combined Instrument )
1.1.5. Remove the right/left A pillar upper and
lower trims.
1.1.6. Remove the weatherproof rubber strips
from the left front and right front door
openings.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
66
1.1.7. Remove the left and right air outlet
covers and exterior rear-view mirror regulating
switch with a flat head screwdriver.
1.1.10. Take off the ornament cover, and
remove two fix screws from the right and left
front parts of upper instrument panel body and
seven fix screws from the lower instrument
panel body with a cross screwdriver, and then
take off the upper instrument panel assy
together with the right and left air outlets.
Torque: 3±0.5 Nm
1.1.11. Remove the right and left four cross
beams from the instrument panel and the fixing
bolts from the both sides of vehicle body with a
10# sleeve.
Torque: 23±2 Nm
-------------------------------------------------------------------------------------------------------------------------------------------------------------
67
1.1.12. Remove two cross beams from the
instrument panel and the fixing bolts from the
soleplate with a 10# sleeve.
Torque: 10±1 Nm
1.1.13. Obliquely place the instrument panel
and instrument panel cross beam, remove the
fixing bolts from the left, middle and right sides
of instrument panel with a 10# sleeve, and take
off the bond strap.
Torque: 4±0.5 Nm
1.1.12. Detach any related harness connector.
1.1.13. Lift out the instrument panel and
instrument panel cross beam by two operators.
1.2. Installation Step
The installing steps are reverse to those for
removal.
Note:
1.2.1. The instrument panel dual-vent and A/C
vent shall be fit well, without the improper
installation and air leakage. The instrument
panel air duct and instrument panel cross beam,
evaporator and other parts shall NOT interfere
and affect the installation of instrument panel,
which may result the improper installation of
instrument panel and its accessories.
1.2.2. The instrument panel and front
windscreen shall NOT interfere and affect the
installation of instrument panel and front
windscreen, and the clearance between front
windscreens shall be uniform.
1.2.3. The clearance between the instrument
panel and both sides of body shall be uniform
and can meet the assembly of weatherproof
rubber strip of door opening.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
68
1.2.4. The glove case switch shall be flexible,
without the interference, clamped or locking
untightened symptom.
2. Removal of Instrument Panel cross
beam
2.1. Removal Step
2.1.1. Disassemble instrument panel assembly
(Refer to Disassembly of Instrument Panel)
2.1.2. Remove seven fix screws from the air
duct as shown in the figure, and then take off
the air duct.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
69
2.1.3. Remove the four fix screws from both
sides of instrument panel and cross beam with a
cross screwdriver.
Torque: 3±1 Nm
2.1.4. Take off the cross beam and air duct.
2.1.5. Remove two screws used to fasten the air
duct from the cross beam with a cross
screwdriver.
Torque: 3±1 Nm
-------------------------------------------------------------------------------------------------------------------------------------------------------------
70
2.1.6. Take off the air duct, and detach the
harness as required.
2.2. Installation Step
Refer to Removal Step and install it in reverse
order.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
71
Chapter 8 Air Conditioning (A/C) System
I. System Composition
Air adjustment and distributing system: HVAC air mixing and distributor part, inside/outside
circulation air inlet, air outlet, outside circulation air filter.
Control system: control panel assy, wire drawing, micro-motor, fan, resistor, high/low voltage switch
Heating system: heater, hot water pipe, engine cooling water system.
Cooling system: compressor, condenser, reservoir dryer, expansion valve, evaporator, and pipe.
II. Removal of Evaporator Assy
1. Preparation
Tool: cross head screwdriver, carp pliers, socket
spanner
Auxiliary material: refrigerant, antifreeze,
sponge rubber strip
2. Disassembly/Reassembly Step
2.1 Recycling the refrigerant by refrigerant
recycling machine
Note:
(1) DO NOT dispose the coolant in a sealed
location or near fire.
Condenser Assy
HVAC Assy
Control Panel Assy
Dry Fluid Reservoir Assy
A/C Compressor Assy
Condenser Assy
4 Pipes Assy
-------------------------------------------------------------------------------------------------------------------------------------------------------------
72
(2) Do not splash the refrigerant into eyes and
skin.
2.2. Disassemble instrument panel assy and
front cross beam. Pull out the related electrical
connectors.
2.3. Loose fixing bolts on high/low pressure
pipe with spanner.
Torque: 5±1 Nm
2.4. Loosen two fixing bolts used to connect the
high/low pressure pipe to the expansion valve,
and pull outwards the high/low pressure pipe.
Torque: 8±1 Nm
2.5. Loosen three fixing bolts of evaporator and
front side.
Torque: 3.5±0.5 Nm
2.6. Remove the inlet/outlet pipe snap rings
from the evaporator radiator with a plier, and
pull out the water pipe.
CAUTION: The coolant may flow out from the
water pipe, and pay attention to the recovery of
coolant.
2.7. Loosen six fixing bolts of evaporator assy
fixed on the paintwork from the engine
compartment, and the fixed position is as
shown in the right figure.
Installation torque: 5±0.5 Nm
2.8. Take out evaporator and AC cable assy
from cab
-------------------------------------------------------------------------------------------------------------------------------------------------------------
73
3. Installation of Evaporator Assy
The installing steps are reverse to those for
removal.
4.
Disassembly/Reassembly
of
Evaporator Interior
Preparation of tool(s): cross screwdriver, socket
wrench
4.1. Removal Step
4.1.1. Refer to the Removal of Evaporator Assy,
and take off the evaporator assy.
4.1.2. Remove the harness and connector from
the evaporator.
4.1.3.
Remove
three
screws
from
the
intermediate part of the evaporator, and
partition the evaporator into two parts.
4.1.4. Remove the air direction regulating
mechanism from the distributor with a cross
screwdriver (as shown in the figure).
Torque: 1.5±0.5 Nm
-------------------------------------------------------------------------------------------------------------------------------------------------------------
74
-------------------------------------------------------------------------------------------------------------------------------------------------------------
75
4.1.5. Remove eight housing connection screws
from the distributor with a cross screwdriver (as
shown in the figure).
Torque: 1.5±0.5 Nm
4.1.6. Detach the distributor. In this case, take
off the air baffle from the interior.
4.1.7Remove four fix screws from the air inlet
with a cross screwdriver, and take off the air
inlet.
Torque: 1.5±0.5 Nm
4.1.8 Remove the fixing screws from the
inner-outer recirculating air control mechanism
with a cross screwdriver, and then take off the
inner-outer recirculating air control mechanism.
Torque: 1.5±0.5 Nm
-------------------------------------------------------------------------------------------------------------------------------------------------------------
76
4.1.9. Remove nine housing connection screws
from the other side of the evaporator with a
cross screwdriver (as shown in the figure).
Torque: 1.5±0.5 Nm
4.1.10. Remove four screws from two fixed
iron sheets of A/C heater pipe with a cross
screwdriver.
4.1.11. Remove two clips from the evaporator
with a flat head screwdriver.
4.1.12. Separate the upper part of the housing
from the lower part by both hands.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
77
4.1.13. Take off the evaporator and expansion
valve from the lower housing.
4.1.14. Remove the fixing nuts from the fan
impeller with a 10# sleeve, and take off the fan
impeller.
Torque: 5±0.5 Nm
4.1.15. Remove the fix screws from two fan
motors with a cross screwdriver.
Torque: 5±0.5 Nm
4.1.16. Pull out the fan motor by hand.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
78
4.2. Installation Step
The installing steps are reverse to those for
removal.
Carry out checks for system evacuating, keep
pressure, antifreeze leakage.
Check if the radiator is blocked. If the radiator
is blocked, utilize the compressed air to clean
it.
III. Troubleshooting
Types of pressure deviation
Possible causes
Method for troubleshooting
1.
The pressure at the high pressure side
remains unchanged or just slightly rises
(compared with the value when the
engine stalls); the pressure at the low
pressure side is within or under the
range as shown; the air conditioner is
under refrigeration.
2.
The pressure at the high pressure side is
normal; the pressure at the low pressure
side is within the range as shown; the
air conditioner is under refrigeration.
Lack of refrigerant or
the expansion valve
fails
Evacuate the refrigerant
● If the volume of the refrigerant is normal
1.
Replace the expansion valve
2.
Refill the refrigerant to the system
3.
Test the pressure again
● If the volume of the refrigerant is short
1.
Check if there is leaking, if there is
fix it
2.
Refill the refrigerant to the system
3.
Test the pressure again
The pressure at the high pressure side is
higher than the specified value; the pressure
at the low pressure side falls rapidly to within
or under the range as shown; the air
conditioner is under refrigeration.
The blockage or
throttling occur
somewhere in the
refrigerant pipelines
The expansion valve
fails
Touch the pipelines to feel the temperature
change
● If there exists temperature differences on
several parts of a certain component
1. Utilize the compressed air and nitrogen
gas to dredge the pipeline and replace the
expansion valve
2. Replace the parts blocked
● If no trouble found
1.
Dredge the pipelines with compressed
air and nitrogen
2. Test the pressure again
Initially, the pressures at the high and low
pressure sides are normal, but after a period
of time, the pressure at the high pressure side
is higher than the specified value and the
pressure at the low pressure side is within or
The expansion valve
fails
There exists vapor in
the refrigerant pipelines
Check for dirt or rust in the expansion valve
and replace it when necessary
● Dredge the pipelines with compressed
air and nitrogen
-------------------------------------------------------------------------------------------------------------------------------------------------------------
79
under the range as shown; the air conditioner
is under refrigeration.
The pressure at the high pressure side is
higher than the specified value or is too high;
the pressure at the low pressure side is too
high; the air conditioner is under
refrigeration; the compressor makes
exceptional sounds (especially when just
starts the engine).
The refrigerant in the
refrigerant pipelines is
excessive
The expansion valve
fails or the compressor
is disabled
Evacuate the refrigerant
● If the volume of the refrigerant is normal
1.
Replace the expansion valve
2.
Refill the refrigerant to the system
3.
Test the pressure again
● If the refrigerant is obviously excessive
1. Refill the coolant into the system
2.Test the pressure again
Note: If the system is still off normal after
retesting the pressure, install the expansion
valve replaced again and dredge the
pipelines with compressed air and nitrogen,
and then further replace the compressor and
the fluid reservoir and drying chamber.
When turning off the engine, the pressure at
the high pressure side slightly rises while the
pressure at the low pressure side slightly
falls;
the
air
conditioner
is
under
refrigeration.
The
compressor
is
disabled
Dredge the pipelines with compressed air
and nitrogen
Replace the compressor and the fluid
reservoir and drying chamber
High pressure side is correct, low pressure
side is too low, AC refrigerating correct,
sometimes the evaporator has ice(even the
refrigerant quantity is correct)
The expansion valve
fails or the compressor
is disabled
Replace the expansion valve
Note: If the system is still off normal after
retesting the pressure, install the expansion
valve replaced again and dredge the
pipelines with compressed air and nitrogen,
and then further replace the compressor and
the fluid reservoir and drying chamber.
1.
High/low pressure sides are correct, AC
refrigerating deficiency.
2. High/low pressure sides are correct, the
sound of compressor is abnormal (especially
when the engine is started), AC refrigerating
good
The transmission oil in
the air conditioner
pipelines is excessive
Evacuate the refrigerant
● Dredge the pipelines with compressed
air and nitrogen
Note: Adjust the volume of the lubricant
when replacing such component of the air
conditioner system as the compressor
The reservoir can not be used
• Perforated
• The sealed position is
damaged
• Thread of fasten part
is damaged, outside air
entering to system
Replace it
-------------------------------------------------------------------------------------------------------------------------------------------------------------
80
Chapter 9 Body Dimension
I. Chassis Control Point
Unit: mm
1. Front
-------------------------------------------------------------------------------------------------------------------------------------------------------------