Jaguar XJ (X350). Manual — part 528

29 . Remove and discard the tie strap.

30 . Connect the radiator top hose from the cylinder head coolant outlet assembly.

31 . Connect the exhaust gas recirculation (EGR) coolant hose.

32 . NOTE:

Install a new O-ring seal.

Install the intake air shutoff throttle elbow and charge air cooler outlet tube assembly.

33 . Connect the intake air temperature (IAT) sensor electrical connector.

34 . Install the intake air shutoff throttle elbow retaining bolt.

Tighten to 10 Nm.

35 . Tighten the charge air cooler outlet tube retaining clip.

www.

36 . Attach the coolant expansion tank coolant hose to the intake air shutoff throttle elbow.

37

.

Connect the coolant expansion tank coolant hose from the cylinder head coolant outlet

assembly.

38 . Connect the glow plug harness electrical connectors.

39 . Attach the diesel particulate filter differential pressure sensor securing bracket.

Tighten to 25 Nm.

40 . Attach the diesel particulate filter high and low-pressure pipes.

Tighten to 10 Nm.

41 . Raise the vehicle.

42 . Install the automatic transmission.

For additional information, refer to Transmission - 2.7L Diesel (44.20.01)

43 . Install the air cleaner.

For additional information, refer to Air Cleaner (19.10.05)

44 . Install the secondary bulkhead center panel.

www.

Была ли эта страница вам полезна?
Да!Нет
9 посетителей считают эту страницу полезной.
Большое спасибо!
Ваше мнение очень важно для нас.

Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.

Текст

Политика конфиденциальности