Jaguar XJ (X350). Manual — part 778
Is the resistance greater than 5 ohms?
-> Yes
REPAIR the high resistance circuit. For additional information, refer to the wiring diagrams. CLEAR the
DTC and test the system for normal operation.
-> No
GO to Pinpoint Test G528708t19.
G528708t19 : CHECK THE SECONDARY AIR INJECTION MAP SENSOR
GROUND CIRCUIT FOR HIGH RESISTANCE
1. Measure the resistance between:
Secondary air injection MAP sensor connector, EC120 ECM connector, EC300
Pin 03
Pin 07
Is the resistance greater than 5 ohms?
-> Yes
REPAIR the high resistance circuit. For additional information, refer to the wiring diagrams. CLEAR the
DTC and test the system for normal operation.
-> No
INSTALL a new secondary air injection MAP sensor. CLEAR the DTC and test the system for normal
operation.
PINPOINT TEST G528708p4 : CHECK
THE SECONDARY AIR INJECTION
VALVE CIRCUITS
G528708t20 : CHECK THE SECONDARY AIR INJECTION VALVE SUPPLY
VOLTAGE
1. Key off. 2. Disconnect the secondary air injection valve electrical connector, PI90. 3. Key on, engine
off. 4. Measure the voltage between:
Secondary air injection valve connector, PI90
Battery
Pin 02
Negative terminal
Is the voltage less than 10 volts?
-> Yes
REPAIR the supply circuit between the secondary air injection valve and battery. This circuit includes
fuse 27 of the front power distribution box and the mega fuse. For additional information, refer to
the wiring diagrams. CLEAR the DTC and test the system for normal operation.
-> No
GO to Pinpoint Test G528708t21.
G528708t21 : CHECK THE SECONDARY AIR INJECTION VALVE CONTROL
CIRCUIT FOR SHORT CIRCUIT TO GROUND
1. Measure the resistance between:
Secondary air injection valve connector, PI90
Battery
Pin 01
Negative terminal
Is the resistance less than 10,000 ohms?
-> Yes
REPAIR the short circuit. For additional information, refer to the wiring diagrams. CLEAR the DTC and
test the system for normal operation.
-> No
GO to Pinpoint Test G528708t22.
G528708t22 : CHECK THE SECONDARY AIR INJECTION VALVE CONTROL
CIRCUIT FOR SHORT CIRCUIT TO POWER
1. Measure the resistance between:
Secondary air injection valve connector, PI90
Battery
Pin 01
Positive terminal
Is the resistance less than 10,000 ohms?
-> Yes
REPAIR the short circuit. For additional information, refer to the wiring diagrams. CLEAR the DTC and
test the system for normal operation.
www.
-> No
GO to Pinpoint Test G528708t23.
G528708t23 : CHECK THE SECONDARY AIR INJECTION VALVE CONTROL
CIRCUIT FOR HIGH RESISTANCE
1. Disconnect the ECM electrical connector, EC300. 2. Measure the resistance between:
Secondary air injection valve connector, PI90 ECM connector, EC300
Pin 01
Pin 55
Is the resistance greater than 5 ohms?
-> Yes
REPAIR the high resistance circuit. For additional information, refer to the wiring diagrams. CLEAR the
DTC and test the system for normal operation.
-> No
INSTALL a new secondary air injection valve.
Secondary Air Injection (AIR) Control Valve - 3.0L NA V6 - AJ27
Secondary Air Injection (AIR) Control Valve - 4.2L NA V8 - AJV8/3.5L NA V8 - AJV8
Secondary Air Injection (AIR) Control Valve - 4.2L SC V8 - AJV8 CLEAR the DTC and test the system for
normal operation.
Removal and installation
Exhaust Gas Recirculation (EGR) Valve
(17.45.01)
Removal
Left-hand drive vehicles with Supercharger
1 . Remove the cabin air filter.
For additional information, refer to Cabin Air Filter (76.10.09)
2 . Remove the cabin air filter housing retaining nut.
3 . Remove the cabin air filter housing.
4 . Remove the engine compartment panel.
www.
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст