Jeep Grand Cherokee WK. Manual — part 1558
31. Install the differential snap-ring (1).
32. Install the intermediate clutch shaft (1).
33. Install the clutch shaft thrust ring (1).
21 - 1042
TRANSFER CASE - NV245 - SERVICE INFORMATION
WK
34. Install clutch shaft (2) snap-ring (1).
35. Install the mainshaft and differential assembly (1)
into the front housing (2), range hub, and input
gear/low range planetary.
36. Install the drive chain guides (1) onto the transfer
case.
WK
TRANSFER CASE - NV245 - SERVICE INFORMATION
21 - 1043
37. Install the screws (2) to hold the chain guide rails
(1) to the front housing. Tighten the screws to 5-8
N·m (44-71 in.lbs.).
38. Install the front drive sprocket (1), mainshaft drive
sprocket (2), and drive chain (3) as one.
39. Install the front output shaft (1) drive sprocket
retaining ring (2).
21 - 1044
TRANSFER CASE - NV245 - SERVICE INFORMATION
WK
40. Install the clutch assembly (2) onto the output
shaft (1).
41. Install the wave spring (2) onto the output shaft
(1).
42. Install the clutch pressure plate (2) onto the out-
put shaft (1) and clutch assembly.
WK
TRANSFER CASE - NV245 - SERVICE INFORMATION
21 - 1045
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст