Iveco EuroCargo (12 to 26 t). Manual — part 90
84484
Figure 52
PARTS MAKING UP THE OUTPUT SHAFT
GEARBOX EATON FSO 5206B
E
URO
C
ARGO
T
ECTOR
12-26 t
210
Base - February 2003
Mount snap ring (1), the thickness of which produces axial play
of the same, into its own seat (2), as near to zero as possible.
Check axial play of 2
nd
speed gear (2), which must fall within
the range of 0.35
÷ 0.48 mm.
Heat hub (2) to a temperature of 85
°C, then fit it onto output
shaft (1) so that:
- the higher shoulder faces downwards (see relevant
section);
- the narrower openings (3) are inserted into the
synchronizing ring projections (4);
- the wider openings (7) of the hub are aligned with
synchronizing ring openings (5) and inner ring tabs (6).
84485
84486
84487
84488
Figure 53
Figure 54
Figure 55
Figure 56
Check the amount of wear of synchronizing rings by acting as
follows:
- Visually check that the friction surface is not corrugated.
Rotate synchronizing ring (1) so as to ensure correct match on
matching body (2).
Use a thickness gauge (3) to check, on two diametrically
opposed points, the clearance between the two parts.
If the measured value does not fall within the range of 0.5
÷
1.9 mm, replace the synchronizing ring.
Mount roller cage (2), 2
nd
speed gear (3) and matching body
(4) on output shaft (1).
Mount inner ring (5) and intermediate ring (6) so that the tabs
are inserted into the matching body (4) slots, then mount
synchronizing ring (7) so that the outer side openings match
with ring (5) inner tabs.
!
The synchronizing rings must, after inspection, be
marked on their respective matching bodies in order
to
avoid
exchanging
their
position
when
re-assembling.
GEARBOX EATON FSO 5206B
E
URO
C
ARGO
T
ECTOR
12-26 t
211
Base - February 2003
84480
84507
84509
84510
Figure 57
Figure 58
Figure 59
Figure 60
Mount sliding sleeve (2) on hub (1) by turning it in the
direction shown in the figure.
Mount dowels (6), springs (3), dowels (4) and balls (5), then
secure them below sliding sleeve (2).
Mount synchronizing ring (7) so that its projections (8) are
inserted into the narrowest openings of hub (9).
Mount inner ring (5) and intermediate ring (3) so that the inner
tabs (4) of the latter match with the outer side openings of
synchronizing ring (7).
Mount matching body (1) so that the slots (2) of the same are
inserted in the tabs of ring (5).
Lubricate roller cage (3), then fit it onto output shaft (1).
Mount 1
st
speed gear (2).
Heat hub (4) to a temperature of ~ 85
°C, then fit it onto
output shaft (1).
Mount snap ring (2), the thickness of which produces axial play
of the same into its own seat (3), as near to zero as possible.
Check axial play of 1
st
speed gear (5), which must fall within
the range of 0.40
÷ 0,57 mm.
GEARBOX EATON FSO 5206B
E
URO
C
ARGO
T
ECTOR
12-26 t
212
Base - February 2003
84511
84513
84512
33639
84514
Figure 61
Figure 62
Figure 63
Figure 64
Figure 65
Lubricate roller cage (3), then fit it onto output shaft (1) and
mount reverse gear (2).
Heat the rear roller bearing inner race (2) to ~ 85
°C, then
fit it onto output shaft (1).
Turn the shaft (placed in the vice) upside down, mount roller
cage (1) and 3
rd
speed gear (2).
Mount matching body (2) and synchronizing ring (3). Heat hub
(1) to a temperature of 85
°C, then fit it onto shaft (4), taking
care that the synchronizing ring tangent stops are inserted into
the respective seats of the hub.
Check axial play of 3
rd
speed gear, which must fall within the
range of 0.35
÷ 0.48 mm.
Mount springs (5) and small pins (4) on hub (2). Mount 3
rd
-
4
th
gear engagement sliding sleeve (1) on hub (2), then place
the former so that it is slightly lifted compared to hub (2), then
insert rollers (3) between small pins (4) and sliding sleeve (2).
GEARBOX EATON FSO 5206B
E
URO
C
ARGO
T
ECTOR
12-26 t
213
Base - February 2003
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст