Lexus ES300 (1997 year). Manual — part 348
Q07781
–
DIAGNOSTICS
AUTOMATIC TRANSAXLE
DI–169
321
1997 LEXUS ES300 (RM511U)
DTC
P0750, P0755
Shift Solenoid A/B Malfunction
(Shift Solenoid Valve No.1/No.2)
SYSTEM DESCRIPTION
The ECM uses signals from the vehicle speed sensor to detect the actual gear position (1st, 2nd, 3rd or O/D
gear).
Then the ECM compares the actual gear with the shift schedule in the ECM memory to detect mechanical
trouble of the shift solenoid valves and valve body.
DTC No.
DTC Detecting Condition
Trouble Area
P0750
P0755
During normal driving, the gear required by the ECM does not
match the actual gear
(2 trip detection logic)
Shift solenoid valve No.1/No.2 is stuck open or closed
Valve body is blocked up or stuck
Check the shift solenoid valve No.1 when DTC P0750 is output and check the shift solenoid valve No.2 when
DTC P0755 is output.
INSPECTION PROCEDURE
1
Check shift solenoid valve No.1 or No.2 operation.
PREPARATION:
(a)
Remove the oil pan.
(b)
Remove the shift solenoid valve No.1 or No.2.
CHECK:
(a)
Applying 490 kPa (5 kgf/cm
2
, 71 psi) of compressed air,
check that the solenoid valve does not leak air.
(b)
When battery positive voltage is supplied to the shift sole-
noid valve, check that the valve opens.
NG
Replace the shift solenoid valve No.1 or No.2.
OK
Check the valve body (See page
DI0CS–01
Position
NORMAL
SHIFT SOLENOID NO.1
MALFUNCTIONING
Solenoid valve
No.1
No.2
Gear
SHIFT SOLENOID NO.2
MALFUNCTIONING
BOTH SOLENOIDS MAL-
FUNCTIONING
Solenoid valve
No.1
No.2
Gear
Solenoid valve
No.1
No.2
Gear
Gear when shift selector is
manually operated
D
2
L
ON
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
OFF
ON
ON
OFF
ON
ON
ON
OFF
1st
2nd
3rd
O/D
1st
2nd
3rd
1st
2nd
X
X
X
X
X
X
X
X
X
ON
ON
OFF
OFF
ON
ON
ON
3rd
3rd
O/D
3rd
3rd
1st
2nd
X
X
X
X
X
X
X
X
X
OFF
OFF
ON
ON
OFF
OFF
OFF
ON
ON
1st
O/D
O/D
1st
O/D
O/D
O/D
1st
1st
O/D
O/D
O/D
O/D
O/D
O/D
O/D
1st
1st
X: Malfunctions
ON
ON
3rd
3rd
DI–170
–
DIAGNOSTICS
AUTOMATIC TRANSAXLE
322
1997 LEXUS ES300 (RM511U)
DTC
P0753, P0758
Shift Solenoid A/B Electrical Malfunc-
tion (Shift Solenoid Valve No.1/No.2)
CIRCUIT DESCRIPTION
Shifting from 1st to O/D is performed in combination with ON and OFF of the shift solenoid valves No.1 and
No.2 controlled by ECM. If an open or short circuit occurs in either of the shift solenoid valves, the ECM con-
trols the remaining normal shift solenoid valve to allow the vehicle to be operated smoothly (Fail safe func-
tion).
Fail Safe Function:
If either of the shift solenoid valve circuits develops an open or short, the ECM turns the other shift solenoid
ON and OFF to shift to the gear positions shown in the table below. The ECM also turns the shift solenoid
valve SL OFF at the same time. If both solenoids are malfunction, hydraulic control cannot be performed
electronically and must be done manually.
Manual shifting as shown in the following table must be done (In the case of a short circuit, the ECM stops
sending current to the short circuited solenoid).
Check the shift solenoid valve No.1 when DTC P0753 is output and check the shift solenoid valve No.2 when
DTC P0758 is output.
DTC No.
DTC Detecting Condition
Trouble Area
P0753
P0758
The ECM checks for an open or short circuit in the shift sole-
noid valves No.1 and No.2 circuit when it changes.
The ECM records DTC P0753 or P0758 if condition (a) or (b) is
detected once, but it does not light up MIL.
After ECM detects condition a) or b) continuously 8 times or
more in a trip and the MIL light up.
(a) When the solenoid is energized, the solenoid resistance
is 8
Ω
or less and is counted.
(b) When the solenoid is not energized, the solenoid resis
tance is 100 k
Ω
or more and is counted.
Open or short in shift solenoid valve No.1/No.2 circuit
Shift solenoid valve No.1/No.2
ECM
DI0CT–01
D00033
Transaxle
Shift Solenoid
Valve No.1
Shift Solenoid
Valve No.2
3
6
E3
E3
V
L–B
L–B
J/C
J26
A
A
A
Cruise Control ECU
17
11
B+
S1
S2
B+
ECM
E10
E10
Q07642
S1
S2
–
DIAGNOSTICS
AUTOMATIC TRANSAXLE
DI–171
323
1997 LEXUS ES300 (RM511U)
WIRING DIAGRAM
INSPECTION PROCEDURE
1
Measure resistance between terminal S1 or S2 of ECM and body ground.
PREPARATION:
Disconnect the connector from ECM.
CHECK:
Measure resistance between terminal S1 or S2 of ECM and
body ground.
OK:
Resistance: 11
∼
15
Ω
OK
Check and replace the ECM.
NG
D00047
S1
S2
S1
S2
DI–172
–
DIAGNOSTICS
AUTOMATIC TRANSAXLE
324
1997 LEXUS ES300 (RM511U)
2
Check harness and connector between ECM and automatic transaxle solenoid
connector.
PREPARATION:
Disconnect the solenoid connector from the automatic trans-
axle.
CHECK:
Check the harness and connector between terminal S1 or S2
of ECM and terminal S1 or S2 of solenoid connector.
OK:
There is no open and no short circuit.
NG
Repair or replace the harness or connector.
OK
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст