Mazda Protege 5. Manual — part 156
EMISSION SYSTEM
01–16–14
EGR SYSTEM DIAGRAM
A3U011620000W01
ZM
FS
End Of Sie
Z3U0116W004
Z3U0116W005
1712-1U-01G(01-16).fm 14 ページ 2001年6月29日 金曜日 午前9時45分
EMISSION SYSTEM
01–16–15
01–16
EGR VALVE REMOVAL/INSTALLATION
A3U011620300W01
1. Disconnect the negative battery cable.
2. Remove in the order indicated in the table.
3. Install in the reverse order of removal.
4. Connect the negative battery cable.
End Of Sie
EGR VALVE INSPECTION
A3U011620300W02
Resistance Inspection
Note
•
Perform the following test only when directed.
1. Disconnect the negative battery cable.
2. Inspect resistance of the EGR valve coils.
•
If not as specified, replace the EGR valve.
•
If as specified, inspect the vacuum hoses for
improper routing, kinks or leakage, and carry
out the “Circuit Open/Short Inspection” and
repair or replace the parts if necessary.
1
EGR valve connector
2
EGR valve
Z3U0116W007
Terminals
Resistance (ohm)
C—E
C—A
D—B
D—F
20—24
Y3U116WA8
X3U116WB4
1712-1U-01G(01-16).fm 15 ページ 2001年6月29日 金曜日 午前9時45分
EMISSION SYSTEM
01–16–16
Circuit Open/Short Inspection
1. Remove the PCM.
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector attaching screw.
Tightening torque
7.9—10.7 N·m {80—110 kgf·cm, 69.5—95.4
in·lbf}
4. Inspect for an open or short circuit in the following
wiring harnesses by probing the applicable
sensor and SST (104 Pin Breakout Box) terminals
with ohmmeter leads.
Open circuit
•
Control circuit (EGR valve connector terminal
E and PCM connector terminal 68)
•
Control circuit (EGR valve connector terminal
A and PCM connector terminal 72)
•
Control circuit (EGR valve connector terminal
B and PCM connector terminal 46)
•
Control circuit (EGR valve connector terminal
F and PCM connector terminal 56)
•
Power circuit (EGR valve connector terminal
C or D and main relay connector terminal D through common connector)
Short circuit
•
Control circuit (EGR valve connector terminal E and PCM connector terminal 68 to GND)
•
Control circuit (EGR valve connector terminal A and PCM connector terminal 72 to GND)
•
Control circuit (EGR valve connector terminal B and PCM connector terminal 46 to GND)
•
Control circuit (EGR valve connector terminal F and PCM connector terminal 56 to GND)
•
Power circuit (EGR valve connector terminal C or D and main relay connector terminal D through common
connector to GND)
5. Remove the EGR valve, and inspect for any damage or clogging. Replace the EGR valve if not as specified.
6. Connect the negative battery cable.
End Of Sie
Y3U116WAK
X3U116WB5
1712-1U-01G(01-16).fm 16 ページ 2001年6月29日 金曜日 午前9時45分
EMISSION SYSTEM
01–16–17
01–16
EGR BOOST SENSOR SOLENOID VALVE INSPECTION
A3U011618744W01
Airflow Inspection
Note
•
Perform the following test only when directed.
1. Disconnect the negative battery cable.
2. Remove the EGR boost sensor solenoid valve.
3. Inspect airflow between each port under the
following conditions.
•
If not as specified, replace the EGR boost
sensor solenoid valve.
•
If as specified, inspect the vacuum hoses for
improper routing, kinks or leakage, and carry
out the “Circuit Open/Short Inspection” and
repair or replace the parts if necessary.
4. Connect the negative battery cable.
Circuit Open/Short Inspection
1. Remove the PCM.
2. Connect the SST (104 Pin Breakout Box) to the
PCM as shown.
3. Tighten the connector attaching screw.
Tightening torque
7.9—10.7 N·m {80—110 kgf·cm, 69.5—95.4
in·lbf}
4. Inspect for an open or short circuit in the following
wiring harnesses by probing the applicable
sensor and SST (104 Pin Breakout Box) terminals
with ohmmeter leads.
Open circuit
•
Power circuit (EGR boost sensor solenoid
valve connector terminal A and main relay
connector terminal D through common
connector)
•
Control circuit (EGR boost sensor solenoid
valve connector terminal B and PCM
connector terminal 98)
Short circuit
•
Power circuit (EGR boost sensor solenoid
valve connector terminal A and main relay connector terminal D through common connector to GND)
•
Control circuit (EGR boost sensor solenoid valve connector terminal B and PCM connector terminal 98 to
GND)
5. Install the EGR boost sensor solenoid valve.
6. Connect the negative battery cable.
End Of Sie
Y3U116WA3
X3U116WCB
Y3U116WAH
X3U116WB7
1712-1U-01G(01-16).fm 17 ページ 2001年6月29日 金曜日 午前9時45分