Acura TL (1995-1998) body repair. Manual — part 10
Front Side Frame
Replacement (cont'd)
3.2TL:
9. Finish the welds.
Use a hammer and dolly to even out the damper housing,
wheelhouse, lower dashboard, front bulkhead and side
sill flanges for a close fit with the surface of the front side
frame.
).
Apply sealer to the mating surfaces of the lower dash-
board, etc.
11. Apply the paint.
See Paint Repair section.
Ventilate when spraying paint. Most paint
contains substances that are harmful if inhaled
or swallowed. Read the paint label before
opening the paint container.
Avoid contact with skin. Wear an approved
respirator, gloves, eye protection and appropriate
clothing when painting.
Paint is flammable. Store it in a safe place, and
keep it away from sparks, flames or cigarettes.
12. Apply the undercoat.
Undercoat the front floor, and apply anti-rust agent to
the inside of the welding section of the side sill, front side
frame, etc (see
).
13. Install the related parts.
Install in the reverse order in which they were removed.
14. Inspect, check and adjust.
• Measure the front wheel alignment.
• Inspect the brake system.
• Adjust the headlight aim.
Main Menu
Table of Contents
Description
Front Side Outrigger/Front Side Extension
The front side outriggers connect the front side frames to the body and are vital to the rigidity of the entire body frame. Pay
particular attention when welding the front side outriggers from beneath the front floor and side sill.
Main Menu
Table of Contents
Front Side Outrigger/Front Side Extension
Mass Production Body Welding Diagram
2.5TL:
NOTE: Replace the front side outrigger, locating bracket and front side brace as an assembly.
Main Menu
Table of Contents
Front side Outrigger/Front Side Extension
Mass Production Body Welding Diagram (cont'd)
3.2TL:
Main Menu
Table of Contents