DAF CF65, CF75, CF85 Series . Manual — part 468
©
200324
3-11
Inspection and adjustment
XE ENGINE FUEL SYSTEM
CF65/75/85 series
4
8
3.7 CHECKING THE FUEL PREFILTER/WATER SEPARATOR
Note:
If a fuel prefilter/water separator is fitted, there
are two further versions.
"Racor" version
1.
Check the reservoir (5) for water.
2.
If necessary, drain the water off through the
drain plug (8) using the fuel lift pump (1) and
collect the water and fuel in a container.
1
2
3
4
5
7
6
8
i400356
XE ENGINE FUEL SYSTEM
3-12
©
200324
Inspection and adjustment
8
CF65/75/85 series
4
"Mann & Hummel" version
1.
Check the reservoir (5) for water.
2.
If necessary, drain the water off through the
drain plug (6) using the fuel lift pump (1) and
collect the water and fuel in a container.
1305803
1305803
G000252
6
8
1
2
3
4
7
5
©
200324
4-1
Removal and installation
XE ENGINE FUEL SYSTEM
CF65/75/85 series
4
8
4. REMOVAL AND INSTALLATION
4.1 REMOVAL AND INSTALLATION, FUEL INJECTION PIPE
Removing the fuel injection pipe
}
Always leave the injection pipes
fixed together as a complete set.
Never remove or shift the clamping
brackets (A) holding the pipes
together. Never bend injector pipes
as they may crack.
1.
Disconnect the earth lead from the battery
terminal.
2.
Clean the union nuts and the area around
both the injectors and the pump housing.
}
When slackening the injection pipe
union nuts, hold the injector's side
connection back using an open-end
spanner. If this is not done, there is a
good chance that the side
connection will leak.
Immediately plug the openings.
3.
Remove the fuel injection pipes as a set.
i 400199
A
A
A
i 400237
XE ENGINE FUEL SYSTEM
4-2
©
200324
Removal and installation
8
CF65/75/85 series
4
Installing the fuel injection pipe
1.
Blow the injector pipes with dry compressed
air.
Then turn the injector side towards the
injectors.
2.
Position the set of injector pipes with the
head on the connection of the pump unit (see
diagram).
3.
Tighten the union nuts to the pump
connection by hand in the order 1-2-3 or
4-5-6.
4.
Then tighten the union nuts on the injector
side by hand in the order 1-2-3 or 4-5-6.
5.
Then tighten the union nuts on the pump side
in the order 1-2-3-4-5-6. Tighten them to the
specified torque. See "Technical data".
6.
Now tighten the union nuts on the injector
side in the order 1-2-3-4-5-6.
}
When tightening the injector pipe
union nuts, hold the injector's side
connection back using an open-end
spanner. If this is not done, there is a
good chance that the side
connection will leak.
7.
Tighten the injector pipe union nuts to the
specified tightening torque. See "Technical
data".
i400506