Mitsubishi Outlander (2003+). Manual — part 292
POWER STEERING GEAR BOX AND LINKAGE
POWER STEERING
37-27
>>F<< UPPER OIL SEAL/UPPER BEARING
INSTALLATION
Apply a coating of ATF DEXRON III or DEXRON II to
the outside of the upper oil seal/upper bearing. Using
the following special tools, press the upper oil seal/
upper bearing into the valve housing.
MB990938: Bar (Snap-in type)
MB991203: Oil Seal and Bearing Installer
>>G<< SEAL RING INSTALLATION
Because the seal rings expand after installation,
tighten after installing by using special tool seal ring
installer (MB991317) to compress the rings, or press
down by hand.
>>H<< LOWER OIL SEAL INSTALLATION
CAUTION
To eliminate a seal malfunction at the valve
housing alignment surface, the upper surface of
the oil seal should project outward approximately
1 mm from the housing edge surface.
Using special tool torque tube bearing installer
(MB990941), press the oil seal into the valve
housing.
>>I<< END PLUG INSTALLATION
1. Apply specified sealant to the threaded part of the
end plug.
Specified sealant:
3M ATD Part No.8661, 8663 or equivalent
2. Secure the threaded portion of the end plug at two
places by using a punch.
>>J<< RACK SUPPORT COVER/JAM NUT
INSTALLATION
1. Position the rack at its centre.
2. Apply specified sealant to the threaded part of the
rack support cover.
Specified sealant:
3M ATD Part No.8661, 8663 or equivalent
ACX01159AC
MB990938
MB991203
Oil seal
MB991203
Bearing
MB990938
ACX01160 AB
MB991317
ACX01161
Housing
AC
Oil
seal
Approximately
1 mm
MB990941
ACX01162 AB
End plug
End plug
POWER STEERING GEAR BOX AND LINKAGE
POWER STEERING
37-28
3. Use special tool rack support cover wrench
(MB991621) to tighten the rack support cover to
23
2 N
¼
m.
4. Turn the rack support cover 30
counterclockwise.
5. Use the special tool to hold the rack support
cover, and then tighten the jam nut to 59
10
N
¼
m.
>>K<< TOTAL PINION TORQUE ADJUSTMENT
CAUTION
Be sure there is no ratcheting or catching
when operating the rack towards the shaft.
Measure the total pinion torque through the
whole stroke of the rack.
1. Using special tool preload socket (MB991006),
rotate the pinion shaft at the rate of one rotation in
four to six seconds to check the total pinion torque
and the change in torque.
Standard value:
Total pinion torque: 0.7
-
1.6 N
¼
m
[Change in torque: 0.4 N
¼
m or less]
CAUTION
When adjusting, set at the highest value of the
standard value range.
NOTE: If the total pinion toque cannot be adjusted
to the standard value within the specified return
angle, check the rack support cover components
and replace any parts if necessary.
2. If the total pinion torque or the change in torque is
outside the standard value, move the rack support
cover 0
-
30
, and adjust the pinion torque again.
>>L<< TAB WASHER/TIE ROD INSTALLATION
After installing the tie rod to the rack, fold tab washer
end (two locations) to tie rod notch.
>>M<< BELLOWS BAND INSTALLATION
1. Turn the adjusting bolt of special tool boot band
crimping tool (MB991561) to adjust the opening
dimension (W) to the standard value.
NOTE: The dimension (W) is adjusted by
approximately 0.7 mm per one turn.
NOTE: Do not turn the adjusting bolt more than
one turn.
Standard value (W): 2.9 mm
<When more than 2.9 mm>: Screw in the
adjusting bolt.
<When less than 2.9 mm>: Loosen the
adjusting bolt.
AC100273
MB991621
AC
AC100274 AB
MB991006
ACX01163 AB
ACX01164 AB
W
MB991561
Adjusting bolt
Stopper
POWER STEERING GEAR BOX AND LINKAGE
POWER STEERING
37-29
CAUTION
Hold the rack housing, and use special tool to
crimp the bellows band securely.
Crimp the bellows band until special tool
touches the stopper.
2. Use special tool boot band crimping tool
(MB991561) to crimp the bellows band.
3. Check that crimped width (A) is within the
standard value.
Standard value (A): 2.4
-
2.8 mm
<When more than 2.8 mm>: Readjust the
dimension (W) of step (1) to the value
calculated by the following equation, and
repeat step (2).
W = 5.5 mm
-
A [Example: if (A) is 2.9 mm,
(W) is 2.6 mm.]
<When less than 2.4 mm>: Remove the
bellows band, readjust the dimension (W) of
step (1) to the value calculated by the
following equation, and use a new bellows
band to repeat steps (2) to (3).
W = 5.5 mm
-
A [Example: if (A) is 2.3 mm,
(W) is 3.2 mm.]
>>N<< TIE ROD END/JAM NUT INSTALLATION
Screw in the tie rod end to achieve the right and left
length as illustrated. Lock with the jam nut.
NOTE: The jam nuts must be tightened securely only
after the steering gear is installed to the vehicle and
toe-in is adjusted.
>>O<< GEAR MOUNTING RUBBER
INSTALLATION
Install the gear mounting rubber to the rack housing
so that the distance is as shown in the illustration.
ACX01165 AB
MB991561
ACX01166 AB
A
AC001011 AH
Jam nut
Edge of bellows
assembly groove
186 mm
AC100275AB
220 mm
POWER STEERING GEAR BOX AND LINKAGE
POWER STEERING
37-30
TIE ROD END BALL JOINT DUST COVER
REPLACEMENT
M1372008200305
If the dust cover is damaged accidentally during
service work, replace the dust cover as follows:
1. Apply specified grease to the lip and inside of the
dust cover.
Specified grease:
Multipurpose grease SAE J310, NLGI No.2 or
equivalent
2. Drive in the dust cover with special tool front axle
base (MB990776) until it is fully seated.
3. Check the dust cover for cracks or damage by
pushing it with your finger.
AC001012AB
MB990776
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст