Mitsubishi Eclipse. Manual — part 974
CONVERTIBLE TOP
TSB Revision
BODY
42-121
REMOVAL SERVICE POINT
.
<<A>> TOPSTACK DRIVE MOTOR ASSEMBLY REMOVAL
1. Lift the main pivot base assemblies at the same time as a
set.
2. Remove the topstack drive motor.
INSTALLATION SERVICE POINT
.
>>A<< TOPSTACK DRIVE MOTOR ASSEMBLY INSTALLA-
TION
1. Lift the main pivot base assemblies at the same time as a
set.
2. Open the convertible top fully, and install the topstack drive
motor.
INSPECTION
M1421007600495
TOPSTACK DRIVE MOTOR ASSEMBLY CHECK
1. Check that the topstack drive motor assembly runs smoothly
when the battery is connected directly to the motor
terminals.
2. Furthermore, check that the topstack drive motor assembly
operates in reverse when the terminal connections are
switched.
REMOVAL STEPS
• QUARTER BELT MOLDING (REFER
TO GROUP 51
− MOLDING
.)
• QUARTER TRIM (REFER TO
GROUP 52A
− TRIMS
.)
• REAR SPEAKER BRACKET (REFER
TO GROUP 54A
− SPEAKER
.)
1. TOPSTACK DRIVE MOTOR
HARNESS CONNECTOR
2. MAIN PIVOT BASE ASSEMBLY
MOUNTING BOLT
3. MAIN PIVOT BASE ASSEMBLY
MOUNTING NUT
<<A>> >>A<<
4. TOPSTACK DRIVE MOTOR
ASSEMBLY
AC004099
CONVERTIBLE TOP
TSB Revision
BODY
42-122
TOPSTACK LATCH ASSEMBLY
REMOVAL AND INSTALLATION
M1426208800037
Pre-removal Operation
• Completely Open the Convertible Top.
Post-installation Operation
• Convertible Top Fit Adjustment (Refer to
.)
AC004124
1
2
AB
REMOVAL STEPS
• NO.1 BOW GARNISH (REFER TO
1. HEADLINER SCREW (REFER TO
.)
2. TOPSTACK LATCH ASSEMBLY
REMOVAL STEPS (Continued)
CONVERTIBLE TOP
TSB Revision
BODY
42-123
TOPSTACK No.1 BOW
REMOVAL AND INSTALLATION
M1426206000046
Post-installation Operation
• Convertible Top Fit Adjustment (Refer to
AC004125
1
2
4
4
9
3
8
6
7
6
7
5
5
29 ± 3 N·m
22 ± 2 ft-lb
29 ± 3 N·m
22 ± 2 ft-lb
8
AB
10
3
10
REMOVAL STEPS
1. TOPSTACK PULL HANDLE BOX
BEZEL
2. NO.1 BOW GARNISH
• TOP COVER ASSEMBLY (REFER
TO
.)
3. TOPSTACK SIDE STAY PAD
ASSEMBLY FROM NO.1 BOW
(REFER TO
.)
• HEADLINER FROM NO.1 BOW
(REFER TO
.)
4. TOPSTACK LATCH ASSEMBLY
5. BOLT
6. WASHER
7. WASHER
8. WASHER
9. NO.1 BOW
10. DOWEL PIN
REMOVAL STEPS (Continued)
CONVERTIBLE TOP
TSB Revision
BODY
42-124
TOPSTACK No.2 AND No.3 BOWS
REMOVAL AND INSTALLATION
M1426206300047
Post-installation Operation
• Convertible Top Fit Adjustment (Refer to
AC004126
1
2
AB
REMOVAL STEPS
• HEADLINER (REFER TO
.
NOTE: ONLY REMOVE THE
HEADLINER FROM THE NO.1, 2
AND/OR 3 BOWS AS REQUIRED)
• TOP COVER ASSEMBLY (REFER
TO
. NOTE: ONLY
REMOVE THE TOP COVER FROM
THE NO.1, 2 AND/OR 3 BOWS AS
REQUIRED)
• TOPSTACK SIDE STAY PAD
NOTE: ONLY REMOVE THE TOP
COVER FROM THE NO.1, 2
AND/OR 3 BOWS AS REQUIRED)
1. TOPSTACK NO.2 BOW
2. TOPSTACK NO.3 BOW
REMOVAL STEPS (Continued)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст