Mitsubishi Galant 9G. Manual — part 1524
POWER STEERING GEAR BOX AND LINKAGE
TSB Revision
POWER STEERING
37-46
<<G>> STEERING GEAR RACK REMOVAL
Pull out the rack slowly. Take out the rack stopper and the rack
bushing at the same time.
.
<<H>> OIL SEAL REMOVAL
CAUTION
Do not damage oil seal press fitting surface.
Partially prize the oil seal and remove it from the rack bushing.
.
<<I>> STEERING GEAR PINION BEARING (BALL
BEARING) REMOVAL
Use a brass bar or special tool MB990939 to remove the ball
bearing from the gear housing.
.
ACX01147 AB
ACX01148 AB
RACK BUSHING
ACX01149
MB990939 OR
BRASS BAR
BALL
BEARING
AF
VALVE
HOUSING
POWER STEERING GEAR BOX AND LINKAGE
TSB Revision
POWER STEERING
37-47
<<J>> STEERING GEAR PINION SHAFT UPPER
BEARING (NEEDLE ROLLER BEARING)
REMOVAL
CAUTION
Do not open special tool MB991120 excessively to prevent
damaging housing interior.
Use special tool MB991120 to remove the needle roller bearing
from the rack housing.
.
<<K>> OIL SEAL REMOVAL
CAUTION
Be careful not to damage the inner surface of the rack cyl-
inder of the gear housing.
Use a piece of pipe or similar tool to remove the oil seal from
the gear housing.
.
<<L>> STEERING GEAR BUSHING REMOVAL
Use special tools MD998812, MD998813, MD998822 and
MD998368 to remove the steering gear bushing.
ACX01150
AB
VALVE
HOUSING
MB991120
NEEDLE
ROLLER
BEARING
AC001004
OIL SEAL
AB
PIPE OR SIMILAR TOOL
GEAR HOUSING
AC210913
AC306914
MD998812
MD998813
MD998822
MD998368
AB
POWER STEERING GEAR BOX AND LINKAGE
TSB Revision
POWER STEERING
37-48
ASSEMBLY SERVICE POINTS
.
>>A<< STEERING GEAR BUSHING INSTALLA-
TION
Use special tools MD999569 and MB990996 to press fit the
steering gear bushing. The projections of the bushing should
be positioned as illustrated.
.
>>B<< OIL SEAL INSTALLATION
1. Apply a coating of GENUINE MITSUBISHI POWER
STEERING FLUID to the both sides of the oil seal.
2. Using special tools MB991199 and MB991197, press the oil
seal into the rack housing.
.
AC210914
AC306915
MD999569
MB990996
AB
AC306916 AB
± 15˚
PROJECTION
AC001005
MB991197
AB
OIL SEAL
MB991199
POWER STEERING GEAR BOX AND LINKAGE
TSB Revision
POWER STEERING
37-49
>>C<< STEERING GEAR PINION SHAFT UPPER
BEARING (NEEDLE ROLLER
BEARING)/STEERING GEAR PINION BEARING
(BALL BEARING) INSTALLATION
CAUTION
Press-fit the bearing straight. The valve housing is alumi-
num, and may become deformed if the bearing is press-fit-
ted on an angle.
1. Apply GENUINE MITSUBISHI POWER STEERING FLUID
to the housing, bearing and oil seal press fitting surface.
2. Press fit the needle roller bearing with special tools
MB990938 and MB991202.
.
>>D<< OIL SEAL/O-RING INSTALLATION
1. Apply a coating of GENUINE MITSUBISHI POWER
STEERING FLUID to the outside of the oil seal and O-ring.
2. Use special tool MB990927 to press fit oil seal until it
touches the rack bush end.
.
>>E<< STEERING GEAR RACK INSTALLATION
CAUTION
Do not close the vent hole in the rack with grease.
1. Apply a coating of multipurpose grease to the rack teeth
face.
ACX01153
NEEDLE
ROLLER BEARING
MB990938
MB991202
MB991202
BALL
BEARING
AC
MB990938
ACX01156AC
OIL SEAL
O-RING
MB990927
RACK
BUSH
ACX01154 AB
SEAL RING, O-RING
VENT HOLE
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст