Mitsubishi L200. Manual — part 217
EXHAUST MANIFOLD AND TURBOCHARGER
INTAKE AND EXHAUST
15-23
Position the projection as shown in the illustration.
>>C<< OIL RETURN PIPE GASKET
INSTALLATION
AC805772 AB
Projection
Oil return
pipe gasket
Turbocharger
assembly
Oil return pipe
Position the projection as shown in the illustration.
>>D<< TURBOCHARGER GASKET
INSTALLATION
AC805775
AB
Projection
Projection
Turbocharger
assembly
Position the projection as shown in the illustration.
INSPECTION
M1151009400057
Check the following points; replace the part if a prob-
lem is found.
EXHAUST MANIFOLD CHECK
1. Check for damage or cracking of any part.
2. Using a straight edge and a feeler gauge, check
for distortion of the cylinder head installation
surface.
Standard value: 0.15 mm or less
Limit: 0.20 mm
TURBOCHARGER ASSEMBLY CHECK
1. Visually check the turbine wheel and the
compressor wheel for cracking or other damage.
2. Check whether the turbine wheel and the
compressor wheel can be easily turned by hand.
3. Check for oil leakage from the turbocharger
assembly.
4. Check whether or not the turbocharger waste gate
regulating valve remains open. If any problem is
found, replace the part after disassembly.
OIL PIPE AND OIL RETURN PIPE CHECK
Check the oil pipe and oil return pipe for clogging,
bending or other damage. If there is clogging, clean
it.
EXHAUST PIPE AND MAIN MUFFLER
INTAKE AND EXHAUST
15-24
EXHAUST PIPE AND MAIN MUFFLER
REMOVAL AND INSTALLATION
M1151008600586
<Except Euro5>
Pre-removal Operation
• Under Skid Plate and Engine Room Under Cover
Removal (Refer to GROUP 51
− Under Cover ).
Post-installation Operation
• Under Skid Plate and Engine Room Under Cover Installa-
tion (Refer to GROUP 51
− Under Cover ).
ACB00721
25 ± 4 N·m
6
4
AB
5
N
3
1
7
25 ± 4 N·m
49 ± 5 N·m
N
57 ± 7 N·m
2
N
Removal steps
1.
Front exhaust pipe
2.
Exhaust pipe gasket
3.
Seal ring
4.
Centre exhaust pipe
5.
Exhaust pipe gasket
6.
Exhaust main muffler
7.
Dash heat protector panel
Removal steps (Continued)
EXHAUST PIPE AND MAIN MUFFLER
INTAKE AND EXHAUST
15-25
<Euro5>
CAUTION
When the DPF is replaced, use the M.U.T.-III to initialise the learning value (Refer to GROUP 00
− Pre-
cautions before Service, Initialisation Procedure for Learning Value in DPF System ).
Pre-removal Operation
• Under Skid Plate and Engine Room Under Cover
Removal (Refer to GROUP 51
− Under Cover ).
Post-installation Operation
• Under Skid Plate and Engine Room Under Cover Installa-
tion (Refer to GROUP 51
− Under Cover ).
ACB00722
25 ± 4 N·m
9
4
AB
8
N
3
1
10
25 ± 4 N·m
49 ± 5 N·m
N
57 ± 7 N·m
2
N
8.0 ± 2.0 N·m
8.0 ± 2.0 N·m
4
36 ± 4 N·m
36 ± 4 N·m
6
6
7
5
Removal steps
•
No.2 exhaust gas temperature
sensor (Refer to GROUP 17
−
Emission Control, DPF System
Sensors )
1.
Front exhaust pipe
2.
Exhaust pipe gasket
3.
Seal ring
•
No.2 crossmember (Refer to
GROUP 32
− Rear Engine
Mounting ) <2WD>
•
No.3 exhaust gas temperature
sensor (Refer to GROUP 17
−
Emission Control, DPF System
Sensors )
4.
Exhaust pressure hose connection
5.
Exhaust pressure pipe and DPF
assembly
6.
Exhaust pressure pipe
7.
DPF
8.
Exhaust pipe gasket
9.
Exhaust main muffler
10. Front floor heat protector panel
Removal steps (Continued)
16-1
GROUP 16
ENGINE
ELECTRICAL
CONTENTS
CHARGING SYSTEM . . . . . . . . . . . .
GENERAL INFORMATION. . . . . . . . . . . . .
SERVICE SPECIFICATION(S) . . . . . . . . . .
SPECIAL TOOL(S) . . . . . . . . . . . . . . . . . . .
ON-VEHICLE SERVICE . . . . . . . . . . . . . . .
ALTERNATOR OUTPUT LINE VOLTAGE DROP
TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
OUTPUT CURRENT TEST. . . . . . . . . . . . .
REGULATED VOLTAGE TEST . . . . . . . . .
WAVE PATTERN CHECK USING AN
OSCILLOSCOPE . . . . . . . . . . . . . . . . . . . .
ALTERNATOR ASSEMBLY . . . . . . . . . . . .
ALTERNATOR ASSEMBLY REMOVAL AND
INSTALLATION. . . . . . . . . . . . . . . . . . . . . .
STARTING SYSTEM . . . . . . . . . . . . .
GENERAL INFORMATION. . . . . . . . . . . . .
SERVICE SPECIFICATION(S) . . . . . . . . . .
ON-VEHICLE SERVICE . . . . . . . . . . . . . . .
STARTER RELAY CONTINUITY CHECK .
STARTER MOTOR ASSEMBLY. . . . . . . . .
STARTER MOTOR ASSEMBLY REMOVAL AND
INSTALLATION. . . . . . . . . . . . . . . . . . . . . .
STARTER MOTOR ASSEMBLY INSPECTION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GLOW SYSTEM . . . . . . . . . . . . . . . . .
GENERAL INFORMATION . . . . . . . . . . . . .
SERVICE SPECIFICATION(S) . . . . . . . . . .
ON-VEHICLE SERVICE . . . . . . . . . . . . . . .
GLOW PLUG CHECK <Euro5> . . . . . . . . .
SELF-REGULATING GLOW SYSTEM CHECK
<Except Euro5>. . . . . . . . . . . . . . . . . . . . . .
CHECK THE ENGINE ECU TERMINALS <Euro5>
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CHECK THE ENGINE ECU TERMINALS <Except
Euro5> . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GLOW PLUG RELAY CHECK <Except Euro5>
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GLOW PLUG CHECK <Except Euro5> . . .
ENGINE COOLANT TEMPERATURE SENSOR
CHECK <Except Euro5> . . . . . . . . . . . . . . .
GLOW PLUG. . . . . . . . . . . . . . . . . . . . . . . .
GLOW PLUG REMOVAL AND INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GLOW PLUG RELAY <Except Euro5> . . . .
GLOW PLUG RELAY REMOVAL AND INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GLOW CONTROL UNIT <Euro5> . . . . . . . .
GLOW CONTROL UNIT REMOVAL AND
INSTALLATION . . . . . . . . . . . . . . . . . . . . . .
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст