Mitsubishi L200. Manual — part 366
TRANSFER
AUTOMATIC TRANSMISSION OVERHAUL <V5A5>
23D-79
NOTE: The new bolt does not require sealant appli-
cation as it is precoated with sealant.
>>D<< SNAP RING INSTALLATION
AK602092
1. Select a proper snap ring so that the end play of
the H-L clutch hub will have the standard value,
and install the snap ring on the transfer drive
shaft.
Standard value: 0
− 0.08 mm
(For H-L clutch hub end play)
>>E<< H-L SHIFT FORK AND H-L CLUTCH
SLEEVE INSTALLATION
AK602093AC
H-L shift fork
1. Apply the specified grease to the H-L shift fork
shaft inserting portion, and install the H-L shift fork
and H-L clutch sleeve in combined state in the
transfer case.
Specified lubricant:
Mitsubishi Part No. 0101011 or equivalent
>>F<< SPACER INSTALLATION
Install the previously selected spacer (Refer to
ADJUSTMENT BEFORE REASSEMBLY.)
>>G<< TRANSFER CASE PLATE INSTALLATION
AK602095AC
1. Apply the specified grease to the illustrated
position of the H-L shift rail inserting portion of the
transfer case plate.
Specified lubricant:
Mitsubishi Part No. 0101011 or equivalent
AK602096AC
2. Face the notched portion of the input gear in the
illustrated direction (in the direction of the
countershaft gear bearing hole).
AK602097AC
3. Apply the specified sealant to the transfer case.
Specified sealant:
Mitsubishi Part No. MD997740 or equivalent
TRANSFER
AUTOMATIC TRANSMISSION OVERHAUL <V5A5>
23D-80
CAUTION
If the sub gear does not readily come in mesh
with the countershaft gear, rote the transfer drive
shaft, etc. to securely engage it.
4. While making sure that the notched portion of the
input gear positioned in Step 2 is in alignment with
the gear portion of the countershaft, install the
transfer case palate.
>>H<< SNAP RING INSTALLATION
AK602098
Select a proper snap ring so that the end play of the
differential lock hub will have standard value, and
install it on the transfer drive shaft.
Standard value: 0
− 0.08 mm
(For differential lock hub end play)
>>I<< STEEL BALL AND SPACER INSTALLATION
AK602099AC
Steel ball
Install the steel ball in the illustrated position of the
transfer drive shaft and install the spacer with its oil
groove toward the chain cover.
>>J<< 2-4WD SHIFT FORK AND 2-4WD CLUTCH
SLEEVE INSTALLATION
AK602100AC
Apply the specified grease to the 2-4WD shift fork
shaft inserting position and install the 2-4WD shift
fork and 2-4WD clutch sleeve in combined state in
the transfer case.
Specified lubricant:
Mitsubishi Part No. 0101011 or equivalent
>>K<< SUN GEAR / 2-4WD CLUTCH HUB / SNAP
RING INSTALLATION
AK602101
1. Install the 2-4WD clutch hub on the sun gear.
2. Select the proper snap ring so that the end of play
of the 2-4WD clutch hub will have the standard
value, and install it on the sun gear.
Standard value: 0
− 0.08 mm
(For 2-4WD clutch hub end play)
TRANSFER
AUTOMATIC TRANSMISSION OVERHAUL <V5A5>
23D-81
>>L<< SYNCHRONIZER OUTER RING /
SYNCHRONIZER CONE / SYNCHRONIZER INNER
RING INSTALLATION
AK602102
1. Combine the synchronizer outer ring,
synchronizer cone and synchronizer inner ring,
press then against the drive sprocket, and
measure the dimension shown in the illustration.
Limit: 0.3 mm
(For clearance between synchronizer outer
ring and drive sprocket)
2. If the dimension is out of the limit value, replace
them with a synchronizer ring set.
3. Apply gear oil to the synchronizer outer ring and
synchronizer inner ring.
AK602103AC
4. Line up the notched portion of the 2-4WD clutch
hub with the projecting portion of the synchronizer
ring and install the ring on the 2-4WD clutch hub.
>>M<< DRIVE SPROCKET / FRONT OUTPUT
SHAFT / CHAIN INSTALLATION
AK602087
1. Set the chain in mesh with the drive sprocket and
front output shaft sprocket and install them in the
transfer case.
AK602104AC
2. Install the drive sprocket so that its illustrated
holes will mach the projecting portions of the
synchronizer cone.
>>N<< REAR OUTPUT SHAFT INSTALLATION
AK602105 AC
Specified lubricant:
Mitsubishi Part No. 0101011 or equivalent
>>O<< CHAIN COVER INSTALLATION
AK602106 AC
1. Apply the specified grease to the indicated 2-4WD
shift rail inserting portion.
Specified lubricant:
Mitsubishi Part No. 0101011 or equivalent
2. Apply the specified sealant to the illustration of the
chain cover.
Specified sealant:
Mitsubishi Part No. MD997740 or equivalent
TRANSFER
AUTOMATIC TRANSMISSION OVERHAUL <V5A5>
23D-82
>>P<< SNAP RING INSTALLATION
AK602107
1. Install the snap ring in the bearing groove of the
rear output shaft.
2. With the rear output shaft pressed against the
chain cover, measure the clearance between the
chain cover and snap ring.
3. Select a snap ring whose thickness is the
dimension of the measured clearance plus the
standard value.
Standard value: 0.12
− 0.24 mm
(For rear output shaft preload)
4. Remove the snap ring from the bearing groove of
the rear output shaft, install the selected snap
ring, and reinstall the removed snap ring in the
bearing groove of the rear output shaft.
>>Q<< SAPCER INSTALLTION
CAUTION
Measure the projection with the snap ring
installed.
AK602108
Projection
AC
1. With the output shaft pressed toward the chain
cover, measure the projection of the bearing from
the chain cover.
AK602109AC
Concave
pprtion
2. Measure the dimension of the rear cover concave
portion at the illustrated position.
Standard value: 0
− 0.12 mm
(For rear output shaft end play)
>>R<< OIL GUIDE INSTALLATION
AK602694
Oil guide
AB
Apply specified grease to the lip of the oil seal.
Specified lubricant:
Mitsubishi Part No. 0101011 or equivalent
>>S<< OIL SEAL INSTALLATION
AK602110AC
MB990938
MB990932
Use special tools to install the oil seal in the rear
cover.
• Installer adapter (MB990932)
• Handle (MB990938)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст