Mitsubishi Lancer Evolution 7. Manual — part 239
ENGINE AND EMISSION CONTROL -
Emission Control System
17-17
EGR VALVE
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Air Hose E Removal and Installation
(Refer to GROUP 15 - Inter Cooler.)
1
2
3
21 ± 4 N·m
Removal steps
1. Vacuum hose connection
2. EGR valve
3. EGR valve gasket
ENGINE AND EMISSION CONTROL -
Emission Control System
17-18
CANISTER
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
D
Air Pipe C, Air Hose D Removal and Installation (Refer to GROUP 15 - Inter Cooler.)
D
Battery and Battery Tray Removal and Installation
D
Air Cleaner Assembly Removal and Installation (Refer to GROUP 15 - Air Cleaner.)
1
2
3
4
5
6
7
8
9
Canister removal steps
1. Purge hose
2. Check valve
3. Vapor hose
4. Vent connector
5. Vapor hose
6. Hose clamp
7. Canister
8. Fuel high pressure hose
9. Canister bracket assembly
ENGINE AND EMISSION CONTROL -
Emission Control System
17-19
CATALYTIC CONVERTER
GENERAL INFORMATION
The three-way catalytic converter, together with
the closed loop air-fuel ratio control based on the
oxygen sensor signal, oxidizes carbon monoxides
(CO) and hydrocarbons (HC) and reduces nitrogen
oxides (NOx).
When the mixture is controlled at stoichiometric
air-fuel ratio, the three-way catalytic converter
provides the highest purification against the three
constituents, namely, CO, HC and NOx.
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
D
Under Cover Removal and Installation (Refer to GROUP 51 - Front Bumper.)
D
Crossmember Bar Removal and Installation (Refer to GROUP 32 - Engine Roll Stopper, Centermember.)
1
2
3
49 ± 10 N·m
13 ± 2 N·m
13 ± 2 N·m
59 ± 10 N·m
50 ± 5 N·m
Removal steps
1. Spring
2. Front exhaust pipe
3. Catalytic converter
NOTES
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст