Mitsubishi Evolution X. Manual — part 483
DOOR
TSB Revision
BODY
42A-35
STEP 5. Check the wiring harness between joint connector
(1) connector C-101 (terminal No. 5) and ETACS-ECU
connector C-301 (terminal No. 2), joint connector (3)
connector C-103 (terminal No. 21) and ETACS-ECU
connector C-315 (terminal No. 15).
Q: Are the wiring harness between joint connector (1)
connector C-101 (terminal No. 5) and ETACS-ECU
connector C-301 (terminal No. 2), joint connector (3)
connector C-103 (terminal No. 21) and ETACS-ECU
connector C-315 (terminal No. 15) in good condition?
YES : Go to Step 6.
NO : The wiring harness may be damaged or the connector
may have loose, corroded or damaged terminals, or
terminals pushed back in the connector. Repair the
wiring harness as necessary. Verify that the central
door locking system works normally.
STEP 6. Retest the system.
Check that the central door locking system works normally.
Q: Is the check result normal?
YES : No action is necessary and testing is complete.
NO : Replace the ETACS-ECU. Check that the central door
locking system normally.
DOOR
TSB Revision
BODY
42A-36
INSPECTION PROCEDURE 2: Central Door Locking System does not Operate even when Door Lock
Switch of Power Window Main Switch Operated (Door Lock Switch of Front Power Window Sub
Switch Operate Normally).
CAUTION
Before replacing the ECU, ensure that the power
supply circuit, the ground circuit and the com-
munication circuit are normal.
AC709019
ETACS-ECU
FUSIBLE
LINK
37
DOOR
LOCK
RELAY
DRIVER'S
DOOR
UNLOCK
RELAY
PASSENGER'S
DOOR
UNLOCK
RELAY
RED
RED
FRONT DOOR LOCK ACTUATOR OR
REAR DOOR LOCK ACTUATOR
AB
Central Door Locking System Power Supply Circuit
POWER
WINDOW
MAIN
SWITCH
JOINT
CONNECTOR
(3)
JOINT
CONNECTOR
(1)
DOOR
LOCK
SWITCH
DOOR
LOCK
SWITCH
BLACK
BLACK
BLACK
BLACK
YELLOW
YELLOW -RED
GRAY
GRAY
YELLOW -RED
YELLOW -RED
YELLOW -RED
GRAY
GRAY
GRAY
FRONT
POWER
WINDOW
SUB SWITCH
DOOR
TSB Revision
BODY
42A-37
.
CIRCUIT OPERATION
• The ETACS-ECU controls the central door lock
system, locking or unlocking all the doors by acti-
vating the central door lock relay (built into the
ETACS-ECU). The ETACS-ECU uses inputs from
the following components:
• Door lock actuator
• Door lock switch, which is incorporated in the
power window main switch or power window
sub switch
.
TROUBLESHOOTING HINTS
• The wiring harness or connectors may have
loose, corroded, or damaged terminals, or termi-
nals pushed back in the connector
• The power window main switch may be defective
DIAGNOSTIC PROCEDURE
STEP 1. Checking central door locking system operation
Check that the central door locking system works normally.
Q: Is the check result normal?
YES : Go to Step 2.
NO : Refer to Inspection procedure 1 "Central door locking
system does not work at all
."
STEP 2. Check power window main switch connector E-15
for loose, corroded or damaged terminals, or terminals
pushed back in the connector.
Q: Is power window main switch connector E-15 in good
condition?
YES : Go to Step 3.
NO : Repair or check the connector. Refer to GROUP 00E,
Harness Connector Inspection
. Verify that all
the doors can be locked and unlocked normally.
AC708950AK
C-129 (BR)
C-103 (B)
C-101 (B)
Connectors: C-101, C-103, C-129
AC608167AM
Connector: E-15
DOOR
TSB Revision
BODY
42A-38
STEP 3. Check the power window main switch (door lock
switch).
Remove the power window main switch. Refer to
.
Q: Does the power window main switch work normally?
YES : Go to Step 4.
NO : Replace the power window main switch. Verify that all
the doors can be locked and unlocked normally.
STEP 4. Check joint connector (1) connector C-101, joint
connector (3) connector C-103 for loose, corroded or
damaged terminals, or terminals pushed back in the
connector.
Q: Are joint connector (1) connector C-101, joint connector
(3) connector C-103 in good condition?
YES : Go to Step 5.
NO : Repair or replace the damaged component(s). Refer
to GROUP 00E, Harness Connector Inspection
. Check that the sunroof works normally.
STEP 5. Check the wiring harness between power window
main switch connector E-15 (terminals Nos. 13 and 14),
joint connector (3) connector C-103 (terminal No. 20) and
joint connector (1) connector C-101 (terminal No. 4).
NOTE: Also check intermediate connector C-129 for loose, cor-
roded, or damaged terminals, or terminals pushed back in the
connector. If intermediate connector C-129 is damaged, repair
or replace the damaged component(s) as described in GROUP
00E, Harness Connector Inspection
Q: Are the wiring harness between power window main
switch connector E-15 (terminals Nos. 13 and 14), joint
connector (3) connector C-103 (terminal No. 20) and
joint connector (1) connector C-101 (terminal No. 4) in
good condition?
YES : Go to Step 6.
NO : The wiring harness may be damaged or the connector
may have loose, corroded or damaged terminals, or
terminals pushed back in the connector. Repair the
wiring harness as necessary. Verify that the central
door locking system works normally.
Switch
position
Tester
connection
Specified
condition
LOCK
14
− Ground
Continuity exists
(2
Ω or less)
UNLOCK
13
− Ground
Continuity exists
(2
Ω or less)
AC609544
ZC600611
Door lock switch
AB