Mitsubishi Outlander GS45X. Manual — part 1509
DRIVESHAFT ASSEMBLY
TSB Revision
FRONT AXLE
26-39
<<B>> PTJ BOOT REMOVAL
1. Wipe off the grease on the shaft spline.
2. When reusing the TJ boot, wrap plastic tape around the
shaft spline to avoid damaging the boot.
ASSEMBLY SERVICE POINT
.
>>A<< PTJ BOOT INSTALLATION
Apply a tape to the shaft spline area. Then incorporate the PTJ
boot band (small) and PTJ boot.
.
>>B<< SPIDER ASSEMBLY/PTJ CASE
INSTALLATION
CAUTION
• The driveshaft joint use special grease. Do not mix old
and new or different types of grease.
• If the spider assembly has been cleaned, take special
care to apply the specified grease.
1. Apply the specified grease furnished in the repair kit to the
spider assembly between the spider axle and the roller.
Specified grease: Repair kit grease
2. Install the spider assembly to the shaft from the direction of
the spline chamfered side.
3. After applying the specified grease to the PTJ case, insert
the driveshaft and apply grease one more time.
Specified grease: Repair kit grease
Amount to use:
210
± 10 g (7.4 ± 0.3 ounce) <2.4L Engine-LH>
200
± 10 g (7.0 ± 0.3 ounce) <2.4L Engine-RH>
245
± 10 g (8.6 ± 0.3 ounce) <3.0L Engine-LH>
255
± 10 g (9.0 ± 0.3 ounce) <3.0L Engine-RH>
250
± 10 g (8.8 ± 0.3 ounce) <3.0L Engine-RH with
S-AWC>
NOTE: When using the repair kit grease, fill the half of the
grease into the joint and the other half into the boot as a
guideline, and consume the grease completely.
.
AC703329AB
Chamfered side
AC703336AB
DRIVESHAFT ASSEMBLY
TSB Revision
FRONT AXLE
26-40
>>C<< PTJ BOOT BAND (SMALL)/PTJ BOOT
BAND (LARGE) INSTALLATION
Adjust the distance (A shown in the illustration) between the
boot bands to the standard value to adjust the air volume inside
the PTJ boot to the specified value, then be sure to tighten the
PTJ boot band (large) and PTJ boot band (small).
Standard value (A):
85
± 3 mm (3.35 ± 0.12 inches) <2.4L Engine>
95
± 3 mm (3.74 ± 0.12 inches) <3.0L Engine>
INSPECTION
M1261003800323
• Check the driveshaft for damage, bending or corrosion.
• Check the inner shaft for damage, bending or corrosion.
• Check the output shaft for damage, bending or corrosion.
• Check the driveshaft spline part for wear or damage.
• Check the inner shaft spline part for wear or damage.
• Check the output shaft spline part for wear or damage.
• Check the spider assembly for roller rotation, wear or corro-
sion.
• Check the groove inside PTJ case for wear or corrosion.
• Check the boots for deterioration, damage or cracking.
• Check the center bearing for seizure, discoloration or
roughness of rolling surface.
• Check the dust cover for damage or deterioration.
EBJ BOOT REPLACEMENT
M1261007500238
Required Special Tool:
• MB991561:Boot Band Crimping Tool
1. Remove the boot bands (large and small).
NOTE: The boot bands cannot be re-used.
2. Remove the EBJ boot.
3. Wrap a plastic tape around the shaft spline, and assemble
the boot band and EBJ boot.
AC703337 AB
A
AC505563 AB
DRIVESHAFT ASSEMBLY
TSB Revision
FRONT AXLE
26-41
4. Align the center groove on the EBJ boot small end with the
shaft groove.
5. Turn the adjusting bolt on special tool MB991561 so that the
size of the opening (W) is at the standard value.
Standard value (W): 2.9 mm (0.11 inch)
• If it is larger than 2.9 mm (0.11 inch)
Tighten the adjusting bolt.
• If it is smaller than 2.9 mm (0.11 inch)
Loosen the adjusting bolt.
NOTE: The value of W will change by approximately 0.7 mm
(0.03 inch) for each turn of the adjusting bolt.
NOTE: The adjusting bolt should not be turned more than
once.
6. Position the EBJ boot band (small) so that there is even
clearance at either end (A and B).
CAUTION
• Secure the driveshaft in an upright position and clamp
part of the boot band to be crimped securely in the jaws
of the special tool MB991561.
• Crimp the boot band until special tool MB991561
touches the stopper.
7. Use special tool MB991561 to crimp the boot band (small).
AC703341AB
AC703342 AB
W
MB991561
Stopper
Adjusting bolt
AC703343 AB
Boot
A
Boot band
(small)
B
Projection
AC606919
MB991561
AD
DRIVESHAFT ASSEMBLY
TSB Revision
FRONT AXLE
26-42
8. Check that the crimping amount (C) of the boot band is at
the standard value.
Standard value (C): 2.4
− 2.8 mm (0.10 − 0.11 inch)
If the crimping amount is larger than 2.8 mm (0.11
inch)
Readjust the value of (W) in step 5 according to the
following formula, and then repeat the operation in
step 7.
W = 5.5 mm (0.22 inch)
− C
Example: If C = 2.9 mm (0.11 inch), then W = 2.6 mm
(0.10 inch)
If the crimping amount is smaller than 2.4 mm (0.10
inch)
Remove the EBJ boot band, readjust the value of
(W) in step 5 according to the following formula,
and then repeat the operations in steps 6 and 7
using a new EBJ boot band.
W = 5.5 mm (0.22 inch)
− C
Example: If C = 2.3 mm (0.09 inch), then W = 3.2
mm (0.13 inch)
9. Check that the boot band is not sticking out past the place
where it has been installed. If the boot band is sticking out,
remove it and then repeat steps 6 to 8, using a new boot
band.
CAUTION
The driveshaft joint uses special grease. Do not mix old
and new or different types of grease.
10.Fill the inside of the boot with the specified amount of the
specified grease.
Specified grease: Repair kit grease
Amount to use: 120
± 10 g (4.2 ± 0.3 ounces) <2.4L
Engine>
Amount to use: 140
± 10 g (4.9 ± 0.3 ounces) <3.0L
Engine>
11.Align the center groove on the EBJ boot big end with the
EBJ case groove.
12.Follow the same procedure as in step 5 to adjust the size of
the opening (W) on the special tool so that it is at the
standard value.
Standard value (W): 3.2 mm (0.13 inch)
AC606920
C
AF
AC703346 AB
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст