Dodge Neon / Neon SRT-4. Manual — part 334
(17) Remove 1/2 synchro snap ring (Fig. 173).
(18) Remove 1/2 synchro from shaft (Fig. 174).
(19) Remove 1st gear blocker ring (Fig. 175).
(20) Remove 1st gear friction cone (Fig. 176).
Fig. 172 2nd Gear Outer Blocker Ring
1 - 2ND GEAR BLOCKER RING
Fig. 173 1/2 Synchro Snap Ring
1 - SNAP RING
2 - 1/2 SYNCHRO HUB
Fig. 174 1/2 Synchronizer
1 - 1/2 SYNCHRONIZER
Fig. 175 1st Gear Blocker Ring
1 - 1ST GEAR BLOCKER RING
21 - 120
T850 MANUAL TRANSAXLE
PL/SRT-4
INTERMEDIATE SHAFT (Continued)
(21) Remove 1st gear reactor ring (Fig. 177).
(22) Remove 1st gear from shaft (Fig. 178).
(23) Remove 1st gear needle bearing (Fig. 179).
(24) Remove first gear thrust bearing (Fig. 180).
Fig. 176 1st Gear Friction Cone
1 - 1ST GEAR FRICTION CONE
Fig. 177 1st Gear Reactor Ring
1 - 1ST GEAR REACTOR RING
Fig. 178 1st Gear Removal
1 - 1ST GEAR
Fig. 179 1st Gear Needle Bearing
1 - 1ST GEAR NEEDLE BEARING
PL/SRT-4
T850 MANUAL TRANSAXLE
21 - 121
INTERMEDIATE SHAFT (Continued)
(25) Remove
intermediate
shaft
roller
bearing
snap ring (Fig. 181).
(26) Press intermediate shaft out of roller bearing
supported by bearing splitter P-334 (Fig. 182).
Roller bearing is not re-usable once removed. It
is necessary to install a new roller bearing
upon re-assembly.
Fig. 180 1st Gear Thrust Bearing Removal/
Installation
1 - THRUST BEARING
Fig. 181 Intermediate Shaft Roller Bearing Snap
Ring
1 - SNAP RING
Fig. 182 Intermediate Shaft Roller Bearing Removal
1 - ARBOR PRESS RAM
2 - INTERMEDIATE SHAFT
3 - ROLLER BEARING
4 - BEARING SPLITTER P-334
21 - 122
T850 MANUAL TRANSAXLE
PL/SRT-4
INTERMEDIATE SHAFT (Continued)
ASSEMBLY
NOTE: Do not re-use snap rings when servicing the
intermediate shaft assembly. Discard snap rings
and install new ones provided with available snap
ring service kit.
NOTE: When installing 1/2 & 5/R synchronizers,
make sure to align oil slots on synchronizer hub
face with oil hold in the shaft splined hub journal.
NOTE: Refer to (Fig. 183) for intermediate shaft
assembly reference.
(1) Press intermediate shaft into NEW roller bear-
ing with arbor press (Fig. 184).
Fig. 183 Intermediate Shaft Assembly
1 - INTERMEDIATE SHAFT
12 - THRUST WASHER
2 - ROLLER BEARING
13 - NEEDLE BEARING
3 - SNAP RING
14 - REVERSE GEAR
4 - NEEDLE BEARING
15 - SNAP RING
5 - 1ST SPEED GEAR
16 - 5/R SYNCHRO
6 - SNAP RING
17 - 5TH SPEED GEAR
7 - 2ND SPEED GEAR
18 - NEEDLE BEARING
8 - 3/4 CLUSTER GEAR
19 - NEEDLE BEARING
9 - SNAP RING
20 - 1/2 SYNCHRO
10 - SNAP RING
21 - THRUST BEARING
11 - SEALED ROLLER BEARING
Fig. 184 Intermediate Shaft Bearing Installation
1 - ARBOR PRESS
2 - INTERMEDIATE SHAFT
3 - CAGED ROLLER BEARING
4 - BEARING SPLITTER
PL/SRT-4
T850 MANUAL TRANSAXLE
21 - 123
INTERMEDIATE SHAFT (Continued)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст