Dodge Neon / Neon SRT-4. Manual — part 332
(7) Install 4th gear blocker ring (Fig. 147).
(8) Install 4th gear and needle bearing (Fig. 148)
(Fig. 149).
(9) Install 5th gear and press into position using
installer 8481 (Fig. 150).
Fig. 146 3/4 Synchro Snap Ring
1 - SNAP RING
2 - 3/4 SYNCHRONIZER
Fig. 147 4th Gear Blocker Ring
1 - 4th GEAR BLOCKER RING
Fig. 148 4th Gear Needle Bearing Removal/
Installation
1 - 4TH GEAR NEEDLE BEARING
Fig. 149 4th Gear Removal/Installation
1 - 4TH GEAR
2 - NEEDLE BEARING
21 - 112
T850 MANUAL TRANSAXLE
PL/SRT-4
INPUT SHAFT (Continued)
(10) Install NEW 5th gear nut and torque to 262
N·m (193 ft. lbs.) using wrench 8478 (Fig. 151).
(11) Stake 5th Gear nut in four (4) places as fol-
lows:
(a) Install staking tool 8479 to 5th gear nut.
(b) Tighten upper thumb screw by hand (Fig.
152).
(c) Tighten two (2) side thumb screws by hand.
(d) Tighten both staking screws until they bot-
tom on tool body (Fig. 153).
(e) Loosen staking screws and thumb screws.
Remove tool and visually inspect stake (Fig. 154).
(f) Remove tool, rotate 90°, and repeat process to
stake in four (4) places.
NOTE: The input shaft sealed roller bearing and
snap ring do not get installed until transaxle assem-
bly to facilitate installation of the reverse idler gear
mechanism.
Fig. 150 5th Gear Installation
1 - ARBOR PRESS RAM
2 - INSTALLER 8481
3 - 5TH GEAR
Fig. 151 5th Gear Nut Removal/Installation
1 - WRENCH 8478
2 - 5TH GEAR NUT
Fig. 152 Staking Tool Set-Up
1 - STAKING TOOL 8479
2 - THUMB SCREWS (3)
PL/SRT-4
T850 MANUAL TRANSAXLE
21 - 113
INPUT SHAFT (Continued)
INTERMEDIATE SHAFT
DESCRIPTION
The intermediate shaft assembly (Fig. 155) is part
of the transaxle geartrain, meshes with and is driven
by the input shaft, drives the differential via an inte-
grated pinion gear, and consists of the following com-
ponents:
• Intermediate Shaft
• 1st Speed Gear
• 2nd Speed Gear
• 3/4 Cluster Gear
• 5th Speed Gear
• Reverse Gear
• 1/2 Synchronizer
• 5/R Synchronizer
The intermediate shaft is supported by a caged
roller bearing at the front of the transaxle, and a
sealed roller bearing at the rear of the transaxle.
DISASSEMBLY
CAUTION: Do not re-use snap rings when servicing
the intermediate shaft assembly. Discard upon dis-
assembly and install new ones provided with avail-
able snap ring service kit.
(1) Install intermediate shaft assembly to arbor
press table with bearing splitter P-334 under the
reverse gear.
Fig. 153 Tighten Stake Screws
1 - STAKING TOOL 8479
Fig. 154 5th Gear Nut Stake (Four Places)
1 - STAKE
21 - 114
T850 MANUAL TRANSAXLE
PL/SRT-4
INPUT SHAFT (Continued)
Fig. 155 Intermediate Shaft Assembly
1 - INTERMEDIATE SHAFT
12 - THRUST WASHER
2 - ROLLER BEARING
13 - NEEDLE BEARING
3 - SNAP RING
14 - REVERSE GEAR
4 - NEEDLE BEARING
15 - SNAP RING
5 - 1ST SPEED GEAR
16 - 5/R SYNCHRO
6 - SNAP RING
17 - 5TH SPEED GEAR
7 - 2ND SPEED GEAR
18 - NEEDLE BEARING
8 - 3/4 CLUSTER GEAR
19 - NEEDLE BEARING
9 - SNAP RING
20 - 1/2 SYNCHRO
10 - SNAP RING
21 - THRUST BEARING
11 - SEALED ROLLER BEARING
PL/SRT-4
T850 MANUAL TRANSAXLE
21 - 115
INTERMEDIATE SHAFT (Continued)
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст