Infiniti G35 (V35). Manual — part 387
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
EC-429
C
D
E
F
G
H
I
J
K
L
M
A
EC
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
Diagnostic Procedure
NBS000T6
1.
INSPECTION START
Do you have CONSULT-II?
Yes or No
Yes
>> GO TO 2.
No
>> GO TO 3.
2.
CHECK EVAP CANISTER VENT CONTROL VALVE CIRCUIT
With CONSULT-II
1.
Turn ignition switch OFF and then turn ON.
2.
Select “VENT CONTROL/V” in “ACTIVE TEST” mode with CONSULT-II.
3.
Touch “ON/OFF” on CONSULT-II screen.
4.
Check for operating sound of the valve.
Clicking noise should be heard.
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 3.
TER-
MINAL
NO.
WIRE
COLOR
ITEM
CONDITION
DATA (DC Voltage)
111
W
ECM relay
(Self shut-off)
[Engine is running]
[Ignition switch: OFF]
●
For a few seconds after turning ignition
switch OFF
0 - 1.5V
[Ignition switch: OFF]
●
More than a few seconds passed after turn-
ing ignition switch OFF
BATTERY VOLTAGE
(11 - 14V)
117
GY/L
EVAP canister vent control
valve
[Ignition switch: ON]
BATTERY VOLTAGE
(11 - 14V)
119
120
P
L
Power supply for ECM
[Ignition switch: ON]
BATTERY VOLTAGE
(11 - 14V)
PBIB1679E
EC-430
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
3.
CHECK EVAP CANISTER VENT CONTROL VALVE POWER SUPPLY CIRCUIT
1.
Turn ignition switch OFF.
2.
Disconnect EVAP canister vent control valve harness connector.
3.
Turn ignition switch ON.
4.
Check voltage between EVAP canister vent control valve termi-
nal 1 and ground with CONSULT-II or tester.
OK or NG
OK
>> GO TO 5.
NG
>> GO TO 4.
4.
DETECT MALFUNCTIONING PART
Check the following.
●
Harness connectors E123, B41
●
Harness for open or short between EVAP canister vent control valve and IPDM E/R
>> Repair open circuit or short to ground or short to power in harness or connectors.
5.
CHECK EVAP CANISTER VENT CONTROL VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND
SHORT
1.
Turn ignition switch OFF.
2.
Disconnect ECM harness connector.
3.
Check harness continuity between ECM terminal 117 and EVAP canister vent control valve terminal 2.
Refer to Wiring Diagram.
4.
Also check harness for short to ground and short to power.
OK or NG
OK
>> GO TO 7.
NG
>> GO TO 6.
Voltage: Battery voltage
PBIB1086E
PBIB0152E
Continuity should exist.
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
EC-431
C
D
E
F
G
H
I
J
K
L
M
A
EC
6.
DETECT MALFUNCTIONING PART
Check the following.
●
Harness connectors B1, M12
●
Harness connectors M72, F102
●
Harness for open or short between EVAP canister vent control valve and ECM
>> Repair open circuit or short to ground or short to power in harness or connectors.
7.
CHECK RUBBER TUBE FOR CLOGGING
1.
Turn ignition switch OFF.
2.
Disconnect rubber tube connected to EVAP canister vent control valve.
3.
Check the rubber tube for clogging.
OK or NG
OK
>> GO TO 8.
NG
>> Clean the rubber tube using an air blower.
8.
CHECK EVAP CANISTER VENT CONTROL VALVE
Refer to
EC-431, "Component Inspection"
OK or NG
OK
>> GO TO 9.
NG
>> Replace EVAP canister vent control valve.
9.
CHECK INTERMITTENT INCIDENT
Refer to
EC-151, "TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT"
>> INSPECTION END
Component Inspection
NBS000T7
EVAP CANISTER VENT CONTROL VALVE
With CONSULT-II
1.
Remove EVAP canister vent control valve from EVAP canister.
2.
Check portion B of EVAP canister vent control valve for being
rusted.
If NG, replace EVAP canister vent control valve.
If OK, go to next step.
3.
Reconnect harness connectors disconnected.
4.
Turn ignition switch ON.
PBIB1033E
EC-432
DTC P0447 EVAP CANISTER VENT CONTROL VALVE
5.
Perform “VENT CONTROL/V” in “ACTIVE TEST” mode.
6.
Check air passage continuity and operation delay time.
Make sure new O-ring is installed properly.
Operation takes less than 1 second.
If NG, replace EVAP canister vent control valve.
If OK, go to next step.
7.
Clean the air passage (Portion A to B ) of EVAP canister vent control valve using an air blower.
8.
Perform step 6 again.
Without CONSULT-II
1.
Remove EVAP canister vent control valve from EVAP canister.
2.
Check portion B of EVAP canister vent control valve for being
rusted.
3.
Check air passage continuity and operation delay time under the
following conditions.
Make sure new O-ring is installed properly.
Operation takes less than 1 second.
If NG, replace EVAP canister vent control valve.
If OK, go to next step.
4.
Clean the air passage (Portion A to B ) of EVAP canister vent control valve using an air blower.
5.
Perform step 3 again.
Condition VENT CONTROL/V
Air passage continuity between A and B
ON
No
OFF
Yes
PBIB1679E
PBIB1033E
Condition
Air passage continuity between A and B
12V direct current supply between
terminals 1 and 2
No
OFF
Yes
PBIB1034E
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст