Volkswagen Golf / Golf GTI / Golf Variant. Manual — part 901
– Insert the Battery - A- into the battery tray -1- so that the battery
base strip touches the rear and side stop -arrows-.
• It must not be possible to slide the Battery - A- rearward or to
the side.
– Install the bracket -1-.
• The tab -arrow- on the bracket -1- must fit into the opening on
the battery clamping strip.
– Tighten the bolt -2- for the bracket -1-.
– Checking the Battery - A- for secure seating.
Turn off the Ignition and All Electrical Consumers, and Connect
the Battery - A- in the Following Sequence:
– Install the battery positive cable terminal -3- on the battery
positive terminal “+”.
– Tighten the nut -4-.
– Connect the Battery - A- . Refer to
⇒ “1.3 Battery, Disconnecting and Connecting”, page 9
When the battery is replaced the Battery Monitoring Control Mod‐
ule - J367- must be adapted. Refer to
⇒ “1.8 Battery Monitoring Control Module J367 , Adapting”, page
Tightening Specifications
♦ Refer to
⇒ “1.1 Overview - Battery”, page 6
1.3
Battery, Disconnecting and Connecting
Special tools and workshop equipment required
♦ Torque Wrench 1783 - 2-10Nm - VAG1783-
Caution
Follow all safety precautions when working on pyrotechnic
components:
♦ When working on pyrotechnic components (airbag, belt
tensioner), it is necessary to disconnect the battery with
the ignition turned on, contrary to the following descrip‐
tion . Refer to ⇒ Body Interior; Rep. Gr. 00 ; Safety
Precautions; Pyrotechnic Components Safety Precau‐
tions .
Disconnecting
– Turn off the ignition and all electrical equipment.
– Remove the ignition key, if equipped.
– Open the heat protection sleeve cover.
– Open the cover -1- over the battery negative terminal.
– Loosen the nut -3- several turns and remove the battery
ground cable terminal clamp -2- from the battery terminal.
Connecting
Pay attention to the following when disconnecting the Battery -
A- .
– Release and disconnect the connector -2- from the Battery
Monitoring Control Module - J367- -3-.
– Install the battery ground cable terminal clamp by hand on the
battery negative terminal “–”.
– Tighten the nut -1- to the tightening specification.
– Reconnect the connector -2- to the Battery Monitoring Control
Module - J367- .
– Turn on the ignition.
– Check the time and if necessary adjust.
– Window, open and close all the way.
– Then, with the windows closed, pull the power window switch
until the relay audibly switches.
– Check the window regulator convenience switch.
While comfort switching is operated, window must close without
holding the power window switch.
Note
After connecting the power supply, the ASR/ESP Indicator Lamp
- K155- may only go out after the vehicle has been driven a few
yards.
Tightening Specifications
♦ Refer to
⇒ “1.1 Overview - Battery”, page 6
1.4
Battery Tray, Removing and Installing
Special tools and workshop equipment required
♦ Torque Wrench 1331 5-50Nm - VAG1331-
Removing
– If necessary, remove the air filter housing. Refer to ⇒ Rep.
Gr. 23 ; Air Filter; Air Filter Housing, Removing and Installing
or ⇒ Rep. Gr. 24 ; Air Filter; Air Filter Housing, Removing and
Installing .
– Remove the Battery - A- . Refer to
⇒ “1.2 Battery, Removing and Installing”, page 7
.
– Free up the wiring harness from the battery tray -arrows-.
– Remove the bolts and nut -2-.
– Remove the battery tray -1-.
Installing
Install in reverse order of removal.
Tightening Specifications
♦ Refer to
⇒ “1.1 Overview - Battery”, page 6
1.5
Battery, Checking
Checking the battery. Refer to ⇒ Electrical Equipment General
Information; Rep. Gr. 27 ; Battery, Checking .
The Battery - A- is checked in the Data Bus On Board Diagnostic
Interface - J533- OBD using the Vehicle Diagnostic Tester in
“Guided Fault Finding” mode.
1.6
Battery, Charging
Battery charging. Refer to ⇒ Electrical Equipment General Infor‐
mation; Rep. Gr. 27 ; Battery, Charging .
1.7
Ground Cable with Battery Monitoring
Control Module - J367- , Removing and
Installing
Special tools and workshop equipment required
♦ Torque Wrench 1331 5-50Nm - VAG1331-
Removing
– Remove the Battery - A- . Refer to
– Release and disconnect the connector -2- from the Battery
Monitoring Control Module - J367- -3-.
– Remove the nut -1- for the ground cable -2-.
– Remove the nut -3- and remove the ground cable with Battery
Monitoring Control Module - J367- -4-.
Installing
Install in the reverse order of removal while paying attention to
the following:
– Adapt the Battery Monitoring Control Module - J367- . Refer
to
⇒ “1.8 Battery Monitoring Control Module J367 , Adapting”,
.
Tightening Specifications
♦ Refer to
⇒ “1.1 Overview - Battery”, page 6
1.8
Battery Monitoring Control Module -
J367- , Adapting
After installing a new start battery or a new Battery Monitoring
Control Module - J367- the Battery Monitoring Control Module -
J367- must be adapted.
– Adapt the Battery Monitoring Control Module - J367- using the
Vehicle Diagnostic Tester .
Нет комментариевНе стесняйтесь поделиться с нами вашим ценным мнением.
Текст